Verizon-LR 990111IN-PLACE DENSITY "ESTING
Date of Service:
Client No.:
Client:
12/16/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9833892
Project No.: 43-2333-98
Report Date
01/11/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: In-place density testing.
CONTRACTOR: BECK
PROJECT DATA
Laboratory Test Method: ASTM D-698
Field Test Method:
ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
MID No.
Description Moisture %
Maximum
Density pcf
Project Requirements
Moisture Density
1 See below for description 12.5
2 Lt gray sandy shaley clay 18.5
w/red sand
116.5 -1/+3% 95%
107.0 -1/+3% 95%
FIELD DENSITY TESTS
TEST MfD MOISTURE
NO TEST LOCATION No. (%)
DRY DENSITY DENSITY
(pcf) (% nmx)
North Parking Subgrade
317 Bay 2, 50' N of N fire lane center line 1 15.0
318 Bay 2, 150' N of N fire lane, center line 1 13.7
319 Bay 3, 75' N of N fire lane, center line 2 17.9
320 Bay 3, 175' N of N fire lane, center line 1 13.9
Test results on this report meet project specification.
113.3 97
114.7 99
102.7 96
114.3 98
M/D No. 1 - Light brown and light gray silty sand with dark gray clay balls
REVISED "Test No." from 1, 2, 3 and 4 to 317, 318, 319 and 320, respectively.
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
( 1 ) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
( 1 ) The Beck Group
(1) The Beck Group
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc.
07SS Page 1 of 1
IN-PLACE DENSITY ESTING
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
12/29/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
9834948 Report Date
01/11/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: In-place density testing.
CONTRACTOR: BECK
PROJECT DATA
Laboratory Test Method: ASTM D-698
Field Test Method:
ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
M/D No.
Description
Maximum
Moisture % Density pcf
Project Requirements
Moisture Density
1
2
See below for description
L't gray sa silty cl w/red sand
10.0 124.5
18.5 107.0
FIELD DENSITY TESTS
-1/+3% 95%
-1/+3% 95%
TEST
NO TEST LOCATION
M/D MOISTURE DRY DENSITY DENSITY
No. (%) (pcf) (% max)
Bay 4 at Center Line
324 100' N from center line, N fire lane, Grade
Bay 5 at Center Line
325 40' N from center line, N fire lane, Grade
Left Drive Approach
326 Main Entrance, 200' E at center line, Subgrade
o1<
1 13.1'
2 17.7 106.1
1 11.9 122.0
An asterisk (*) appears next to test results which do NOT meet the project specifications.
99
99
98
M/D No. 1 - Dark reddish brown silty clayey sand w/gravel
Tests #325 and ~326 were for reconfirmation after rains
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
( 1 ) The Beck Group
( I ) The Beck Group
on 12/18/98.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07SS Page 1 of 1
CONCRETE CQMPI ,SSIVE STRENGTH TF T
Date of Service: 12/12/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9833513 Report Date
01/11/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 43
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: C ~ 5
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 I 5.50
1 2 5.50
I 3 5.50
1 4 5.50
1 5 5.50
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/12/1998 BATCII TIME: 10:17am
TIME SAMPLED: I 1:20am BY: Mike Odom
WEATIlER CONDITIONS:
TEMPERATURE (F)- AIR
TRUCK NO: 450
AIR CONTENT (%): 1.3
PLACEMENT LOCATION:
Partly cloudy
48 F CONCRETE: 62 F
TICKET NO: I 197078
[INIT WEIGHT (pcO: N/A
Building columns (4) west wing Level lI-IIl, Line 5, A-D
DATE
TESTED
12/19/1998
12/19/1998
01/09/1999
01/09/1999
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 89240 3160
7 88620 3130
Average 3150
28 176130 6230
28 172350 6100
Average 6170
02/06/1999
56
10
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake. Inc.
(1) The Beck Group
Started: 1 l:00am
(1) The Beck Group
(I) Dalcan, Inc.
Finished: 1 l:30am
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above aod shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I ofl
COMPRESSIVE STRENGTH TE T
jf Service: 12/11/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
ENGINEERII~, INC.
8901 Carpenter Frwy., Suite 0100
Dallas, Texas 75247
Report No.: 9833418
Project No.: 43-2333-98
Report Date
01/11/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 31
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/11/1998 BATCH TIME: 1:40pm
TIME SAMPLED: 2:30pm BY: Mike Odom
WEATliER CONDITIONS:
TEMPERATURE (V) - Ail*,
TRUCK NO: 481
AIR CONTENT (%): 1.4
PLACEMENT LOCATION:
Cloudy
42 F CONCRETE: 58 F
TICKET NO: 1197033
UNIT WEIGHT(pcQ: N/A
Building columns Level II, III, west wing, A-D & 1-7 Lines
SAMPLE LOCATION: D ~ 4
REPORT OF TESTS ACCUMULATIVE YARDS: 38
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AG E LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
1 1 6.00 12/14/1998 3 65520 2320
1 2 6.00 12/14/1998 3 70300 2490
1 3 6.00 12/14/1998 3 56600 2000
Average 2270
1 4 6.00 12/18/1998 7 112800 3990
1 5 6.00 12/18/1998 7 115110 4070
Average 4030
1 6 6.00 01/08/1999 28 161980 5730
1 7 6.00 01/08/1999 28 148370 5250
Average 5490
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the va'itten approval of HBC Engineering, Inc.
0iLL Page 1 of 2
~ff~eport No.:
9833418
CYLINDER
MARKED
SET NO.
1 8
MEASURED
SLUMP
(inches)
6.00
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
02/05/1999 56
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 8:30am Finished: 4:30pm ~ Engineering, Inc.
(l) The Beck Group
(l) Dalcan, Inc. Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 2 of 2
CONCRETE COMPP SSIVE STRENGTH TF T
Date of Service: 12/08/1998
Client No.: 08644025
Report No.: 9833080
Project No.: 43-2333-98
ENGINF_.ERII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~,CTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METItOD: ASTM C- ! 43
ASTM C- ! 72
ASTM C-39
SAMPLE LOCATION: HQ 18
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.75
1 2 5.75
1 3 5.75
I 4 5.75
I 5 5.75
No visual AEA in mix.
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/08/1998 BATCH TIME: l:28pm
TIME SAMPLED: 2: 10pm BY: Mike Odom
WEATItER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 450
AIR CONTENT (%): N/A
I'LACEMENT LOCATION:
Fair
53 F CONCRETE: 71 F
TICKET NO: 1195682
[INIT WEIGItT (pcf): N/A
East wing, Level I-2 Columns (~ E-16, 17, 18 & H-16, 17,18
DATE
TESTED
12/15/1998
12/15/1998
01/05/1999
01/05/1999
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (Ibs.~rce) (psi)
7 146790 5190
7 146240 5170
Average 5180
28 202020 7140
28 192800 6820
Average 6980
02/02/1999
56
16.5
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 1:00pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 3:30pm
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page Iofl
CONCRETE COMPRESSIVE STRENGTH TEP'T
Date of Service: 12/30/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9835090 Report Date
01/11/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: D-5
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
1 2 6.00
1 3 6.00
1 4 6.00
I 5 6.00
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/30/1998 BATCit TIME: 1:55pm
TIME SAMPLED: 2:40pm BY: Mike Odom
WEATItER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 835
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Fair
54 F CONCRETE: 68 F
TICKET NO: 1205052
UNIT WEIGItT (pti'}: N/A
Five columns Level III-IV A-2, A, B, C, D ~ I Line
DATE
TESTED
01/06/1999
01/06/1999
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
AG E LOAD STRENGTH
(days) (lbs. force) (psi)
7 128020 4530
7 134050 4740
Average 4640
01/27/1999
01/27/I 999
28
28
12
FRACTURE
TYPE
02/24/1999
56
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 2:30am
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 4:00pm
Eugene Harbour
Vice President
This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of I
CONCRETE COMPRESSIVE STRENGTH TES t
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 11/12/1998
Client No.: 08644025
Report No.: 9830749
Project No.: 43-2333-98
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACrOR: BECK CONCRETE CLASS: 658
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/12/1998 BATCH TIME: 1:27pm
PLANT: 41 TIME SAMPLED: 3:20pm BY: Keith Fowler
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Light rain, cool
STRENGTtI: 5000 psi ~ 28 Days TEMPERATURE (F)- AIR 50 F CONCRETE: 66 F
SLUMP: 3-5" TRUCK NO: 455 TICKETNO: 1180977
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcq: N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
West wing, section "A", columns
ASTM C-172 ^l thru A6
ASTM C-39
SAMPLE LOCATION: A-3
REPORT OF TESTS ACCUMULATIVE YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
1 I 6.50 11/19/1998 7 120180 4250
I 2 6.50 11/19/1998 7 ! 15640 4090
Average 4170
1 3 6.50 12/10/1998 28 172340 6090
1 4 6.50 12/10/1998 28 170910 6040
Average 6070
1 5 6.50 01/07/1999 56 173130 6120
10
FRACTURE
TYPE
Technician: Keith Fowler
Report Distribution:
( 1 ) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 12:00pm
(1) The Beck Group
(I) Dalcan, Inc.
Finished: 5:30pm
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I of I
CONCRETE
COMPRESSIVE
Date of Service: 11/12/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
STRENGTH TES"
ENGINEERING, ~IC.
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9830806
Project No.: 43-2333-98
Report Date
01/11/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 3-5"
AIR: NA
TEST METHOD: ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 564
PLACEMENT DATE: 11/12/1998 BATCH TIME: 1:35pm
TIME SAMPLED: 3:00pm BY: Keith Fowler
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 463
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Light rain, cool
50 F CONCRETE: 60 F
TICKET NO: I 180982
UNIT WEIGHT (pcO.: N/A
West wing section "B", Grade beam A to C on 8 Line, K9 to 10, & 11E to G
SAMPLE LOCATION: K9 to l0
CYLINDER MEASURED
MARKED SLUM P
SET NO. (inches)
1 I 6.00
1 2 6.00
1 3 6.00
1 4 6.00
1 5 6.00
REPORT OF TESTS ACCUMULATIVE YARDS: 20
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
11/19/1998 7 117450 4150
11/19/1998 7 116470 4120
Average 4140
12/l 0/1998 28 186420 6590
12/10/1998 28 190270 6730
Average 6660
01/07/1999 56 193740 6850
FRACTURE
TYPE
Technician time: See
Technician: Keith Fowler
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Report ~9830749
Started:
(1) The Beck Group
(1) Dalcan, Inc.
Finished:
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page 1 of I
'CONCRETE COMPRESSIVE STRENGTH TESf
ENGINF~RII~, INC.
· '8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/08/1998
Client No.: 08644025
Report No.: 9833081
Project No.: 43-2333-98
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTIt: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/08/1998 BATCH TIME: 5:06am
TIME SAMPLED: 5:45am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 450
AIR CONTENT (%): 6.8
PLACEMENT LOCATION:
Cloudy
42 v CONCRETE: 67
TICKETNO: 1195035
[INIT WEIGHT(pc0: N/A
Paving slab-on-grade /t2, west side of quadrant
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days} (lbs. force)
1 1 4.25 12/15/1998 7 93460
1 2 4.25 12/15/1998 7 94090
Average
1 3 4.25 01/05/1999 28 117820
1 4 4.25 01/05/1999 28 106860
Average
1 5 4.25 02/02/1999 56
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3300
3330
3320
4170
3780
3980
55O
FRACTURE
TYPE
Sample location: 50' N & 20' E from NW corner paving placement %2.
This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL I'age I of 5
CONCRETE COMPRESSIVE STRENGTH
Date of Service: 12/08/1998
Client No.: 08644025
Report No.: 9833081
Project No.: 43-2333-98
ENGINEERING, INC.
-' 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/08/1998 BATCH TIME: 6:18am
PLANT: 41 TIME SAMPLED: 7:00am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy
STRENGTlt: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 43 V CONCRETE: 67 F
SLUMP: 6.0" Max TRUCKNO: 466 TICKETNO: 1195083
AIR: 3-5°//0 AIR CONTENT (%): 6.6 UNIT WEIGHT (pc0: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
ASTM C-172 See page 1
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTEI) (days) (lbs. force) (psi)
2 1 5.50 12/15/I 998 7 86470 3060
2 2 5.50 12/15/1998 7 87100 3080
Average 3070
2 3 5.50 01/05/1999 28 121370 4290
2 4 5.50 01/05/1999 28 116490 4120
Average 4210
2 5 5.50 02/02/I 999 56
Sample location: NW driveway, 80' E from NW corner paving placement ~1.
55O
FRACTURE
TYPE
This report is exclusively ibr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 5
CONCRETE 'COMPRESSIVE STRENGTH TEST
ENGINEErINg, INC.
"8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/08/1998
08644025
Report No.: 9833081
Project No.: 43-2333-98
Report Date
01/I 1/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: tXI
PLANT: 4 l
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/08/1998 BATCH TIME: 7:57am
TIME SAMPLED: 8:50am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 463
AIR CONTENT (%): 6.7
PLACEMENT LOCATION:
See page 1
Partly cloudy
43 F CONCRETE: 71 F
TICKET NO: 1195207
UNIT WEIGHT (pc0: N/A
REPORT OF TESTS ACCUMULATIVE YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
3 ! 6.00 12/l 5/1998 7 83310 2950
3 2 6.00 12/15/1998 7 82140 2900
Average 2930
3 3 6.00 01/05/1999 28 116620 4120
3 4 6.00 01/05/1999 28 109680 3880
Average 4000
3 5 6.00 02/02/1999 56
FRACTURE
TYPE
Sample location: Along Building Line 7, 175' W from centerline W fire lane.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 5
'CONCRETE COMPRESSIVE STRENGTH TEST
ENGINF__~FRING, INC.
"8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/08/1998
08644025
Report No.: 9833081
Project No.: 43-2333-98
Report Date
01/11/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 4 1
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 47 F CONCRETE: 71 F
SLUMP: 6.0" Max TRUCKNO: 454 TICKETNO: 1195296
AIR: 3-5% AIR CONTENT (%): 6.4 UNIT WEIGHT (pc0: $/m
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
ASTM C-172 See page 1
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/08/1998 BATCH TIME: 8:59am
TIME SAMPLED: 9:50am BY: Mike Odom
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
4 1 6.50 12/15/1998 7 70470 2490
4 2 6.50 12/15/1998 7 70150 2480
Average 2490
4 3 6.50 01/05/1999 28 100180 3540
4 4 6.50 01/05/1999 28 91290 3230
Average 3390
4 5 6.50 02/02/1999 56
Sample location: Along Building Line 6, 120' W from centerline W fire lane.
55O
FRACTURE
TYPE
0ILL
This report is exclusively tbr the use of the client iudicatcd above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 4 of 5
'CONCRETE COMPRESSIVE
Date of Service: 12/08/1998
Client No.: 08644025
STRENGTH TES'i'
Report No.: 9833081
Project No.: 43-2333-98
ENGINEERING, INC.
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report Date
01/11/1999
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/08/1998 BATCH TIME: 10:23am
TIME SAMPLED: 10:50am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCKNO: 461
AIR CONTENT (%): 6.5%
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 1 6.50 12/15/1998 7 71940
5 2 6.50 12/15/1998 7 73120
Average
5 3 6.50 01/05/1999 28 116300
5 4 6.50 01/05/1999 28 113080
Average
Fair
48 V CONCRETE: 76 V
TICKET NO: 1195435
UNIT WEIGHT (pcf}: N/A
5 5 6.50 02/02/1999 56
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
2540
2590
2570
4110
4000
4060
630
FRACTURE
TYPE
Sample location: Along Line 3, 50' W from centerline W fire lane.
ALL REPORTS CORRECTED FOR COMMENT ABOUT % AIR - % /~IR DOES COMPLY__
Technician: Mike Odom Started: 4:30am Finished: l:00pm
Report Distribution:
(I) The Beck Group (1) The Beck Group
(I) Gromatzky Dupree & Assoc. (1) Dalcan, IRc
(I) Brockette Davis Drake, Inc.
( I ) The Beck Group
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page 5 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
ENGINEERING, INC.
· '8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/09/1998
Client No.: 08644025
Report No.: 9833168
Project No.: 43-2333-98
Report Date
01/11/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TX[
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METItOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 1.5 ~ B
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/09/1998 BATCH TIME: 3:54am
TIME SAMPLED: 4:30am By: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 461
Alii CONTENT (%): 1.4
PLACEMENT LOCATION:
Fair
37 F CONCRETE: 64 F
TICKET NO: 1195830
UNIT WEIGHT (pc0: N/A
Building Area A (west wing), Level 11, Line I-5.7, A-D, stab
REPORT OF TESTS ACCUMULATIVE YARDS: 450
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AG E LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.50 12/11/1998 2 92500 3270
I 2 5.50 12/12/1998 3 108910 3850
1 3 5.50 12/16/1998 7 159240 5630
! 4 5.50 12/16/1998 7 157110 5560
Average 5600
I 5 5.50 01/06/1999 28 171570 6070
1 6 5.50 01/06/1999 28 178940 6330
Average 6200
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page I of 8
.Report No.: 9833168
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
! 7 5.50 02/03/I 999 56
This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval ofltBC Engineering, Inc.
0ILL Page 2 of 8
.CONCRETE' COMPRESSIVE STRENGTH TES f
ENGINF_Tr. RIb~, INC.
..8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/09/1998
Client No.: 08644025
Report No.: 9833168
Project No.: 43-2333-98
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TX[
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGT~i: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 3.5 @ C
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/09/1998 BATCH TIME: 5:19am
TIME SAMPLED: 6:00am BY: Mike Odom
WEATHER CONDITIONS: Fair
TEMPERATURE (F) - AIR 35 F CONCRETE: 63 ~
TRUCKNO: 834 TICKETNO: 1195890
A1R CONTENT (%): N/A UNIT WEIGHT (pcfJ: N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AG E LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 5.75 12/11/1998 2 93420 3300
2 2 5.75 12/12/1998 3 109050 3860
2 3 5.75 12/16/I 998 7 162510 5750
2 4 5.75 12/16/1998 7 162120 5730
Average 5740
2 5 5.75 01/06/1999 28 205430 7270
2 6 5.75 01/06/I 999 28 199860 7070
Average 7170
ACCUMULATIVE YARDS: 450
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
0ILL
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 8
· Report No.: 9833168 H~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 7 5.75 02/03/1999 56
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 8
CONCRETE COMPRE SIVE STRENGTH TES'£
ENGINEERING, 1NC.
· ' 89Ol Carpenter Frwy. Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/09/1998
08644025
Report No.: 9833168
Project No.: 43-2333-98
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: C.5 ~ 4.5
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/09/1998 aATCH TIME: 7:04am
TIME SAMPLED: 7:40am BY: Mike Odom
WEATHER CONDITIONS: Fair
TEMPERATURE (F)-AIR 38 F CONCRETE: 66 F
TRUCKNO: 835 TICKETNO: 1196017
.AIR CONTENT (%): 1.6 [INIT WEIGHT (pcf): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS ACCUMULATIVE YARDS: 450
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 I 5.25 12/11/1998 2 92330 3270
3 2 5.25 12/12/l 998 3 108580 3840
3 3 5.25 12/16/1998 7 160280 5670
3 4 5.25 12/16/1998 7 161140 5700
Average 5690
3 5 5.25 01/06/1999 28 216090 7640
3 6 5.25 01/06/1999 28 215580 7620
Average 7630
OILL
This report is exclusively lbr tile use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5 of 8
· Report No.: 9833168 ~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 7 5.25 02/03/1999 56
This report is exclusively lbr the use of the clieot indicaled above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 6 of 8
CONCRETE COMPR ,SSIVE
STRENGTH TEST
ENGINEERING, ~NC.
· ' 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/09/1998
Client No.: 08644025
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9833168
Project No.: 43-2333-98
Report Date
01/I 1/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TX1
PLANT: 4 I
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F) . AiR 42 F CONCRETE: 66 F
SLUMP: 6.0" Max TRUCK NO: 541 TICKET NO: 119620111
AIR: N/A AIR CONTENT (%): N/A [INIT WEIGtIT (pc.f): N/A
TEST METHOD: ASTM C~ 143 PLACEMENT LOCATION:
ASTM C- 172 See page I
ASTM C-39
SAMPLE LOCATION:
¢.7 @ 5.7
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/09/1998 BATCH TIME: 8:39am
TIME SAMPLED: 9:10am BY: Mike Odom
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
4 I 6.25 12/I 1/1998 2 98260 3470
4 2 6.25 12/12/1998 3 104270 3690
4 3 6.25 12/16/1998 7 158930 5620
4 4 6.25 12/16/1998 7 158170 5590
Average 5610
4 5 6.25 01/06/1999 28 205360 7260
4 6 6.25 01/06/1999 28 207500 7340
Average 7300
This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 7 of 8
,Report No.: 9833168
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
4 7 6.25
Ail samples taken from
DATE
TESTED
02/03/1999
hopper.
AGE
(days)
56
MAXIMUM
LOAD
(lbs. force)
COMPRESSIVE
STRENGTH
(psi)
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 2:30am
(1) The Beck Group
(I) Dalcao, Inc.
Finished: 1 l:00am
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval oFHBC Engineering, Inc.
0ILL Page 8 of 8
'CONCRETE COMPRF; SIVE STRENGTH TESf
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/29/1998
08644025
Report No.: 9834950
Project No.: 43-2333-98
Report Date
01/11/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/29/I 998 BATCH TIME: 2:34pm
PLANT: 41 TIME SAMPLED: 3:25pm BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
STRENGTH: 5000 psi @ 28 Days TEMPE~TURE(F)-AIR 63 F CONCRETE: 69 ~:
SLUMP: 6.0" Max TRUCK NO: 803 TICKET NO: 1204096
AIR: N/A AIR CONTENT {%): N/A UNIT WEIGIlT (pc0.: N/A
TEST METIlOD: ASTM C- 143 PLACEMENT LOCATION:
(I 5) Columns Level III-IV at A,B,C and Lines 2-5 = 15 (A-2 Column not 1)
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: D-4
REPORT OF TESTS ACCUMULATIVE YARDS: 35.5
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 6.50 12/31/1998 2 48570 1720
I 2 6.50 01/02/1999 4 116930 4140
I 3 6.50 01/05/1999 7 140670 4970
I 4 6.50 01/05/I 999 7 141350 5000
Average 4990
1 5 6.50 01/26/1999 28
1 6 6.50 01/26/1999 28
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in lull without the written approval of HBC Engineering, Inc.
Page I of 2
Report No.: 9834950
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I 7 6.50 02/23/1999
AGE
(days)
56
MAXIMUM
LOAD
(lbs. force)
COMPRESSIVE
STRE[NGTH
(psi)
FRACTURE
TYPE
Note: Entrapped air "not apparent"
Technician: Mike Odom
Report Distribution:
(l) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 12:30pm
(I) The Beck Group
( I ) Dalcan, Inc.
Finished: 5:00pm
Vice President
This report is exclusively l'or the use ol' the client iodicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 2
REPORT OF REINFORCING STEEL INSPECTION
890I Ca.'T-~nt~r Ftwy., Suite #100
Dallns, Texns 75247
Date of Service: 01/11/99
Report No.: 9901731
Client No.: 08644025
Project No.: 43-2333-98
Client: The Beck Group Project:
1700 Pacific Ave, Suite 3800
Dallas, Texas 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized:
Locations/Items Inspected:
On-site
Bay 6, slab-on-grade, south half, northeast quadrant
Test Method:
Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT TEMS INSPECTED CORRECT INCORRECT ITEMSINSPECTED CORRECT INCORRECT
Placing Drawings Ap~oved X 3ar Length and Shape X Column Tied Property
Bar Size X =roper Bar Placement X Ties and Spaces X
Bar Grade X =roperty Tied X Stirrup Spacing/Type
Rebar Clean X 3owel Ears in Place X Welded Splices
Form Clean X ~rober Bar Supports X Mechanical Splices
Number of Bars X .apped Splices X Proper Cover X
Discrepancies/Comments:
Dowels were in place. Reinforcing bar size, numbers and spacing were as per
specifications.
Technician: M. Odom Started: 10:30 am Stopped: 11:30 am
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
(1) The Beck Group
I'"~ Engineering, Inc.
Eugene Harbour
Vice President
309ss ~his repo~ is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering. Inc.
IN-PLACE DENSITY BESTING
IBC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Date of Service: 12/18/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9834075
Project No.: 43-2333-98
Report Date
01/11/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: In-place density testing.
CONTRACTOR: BECK
PROJECT DATA
Laboratory Test Method:
ASTM D-698
MOISTURE DENSITY RELATIONS:
M/D No.
Field Test Method:
Maximum
Description Moisture % Density pcf
ASTM D-2922
ASTM D-3017
Project Requirements
Moisture Density
Dk reddish brown silty clayey
safid with gravel
10.0 124.5
FIELD DENSITY TESTS
- 1/+3 % 95 %
TEST
NO
M/D MOISTURE
TEST LOCATION No. (%)
DRY DENSITY DENSITY
(pc0 (% nmx)
321
322
323
324
N. Quadrant Parking Subgrade
Bay 4, center line between N islands I 13.0
Bay 4, center line between middle islands 1 11.9
Bay 5, center line between N islands 1 12.7
Bay 5, center line between middle islands 1 12.7
Test results on this report meet project specification.
119.8 96
118.7 95
120.2 97
123.1 99
REVISED
"Test No." from 1, 2, 3 and 4 to 321, 322, 323 and 324,
respectively.
Technician: Mike Odom
Report Distribution:
( 1 ) The Beck Group
(1) Gromatzky Duprec & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
( I ) The Beck Group
~ Engineer',~,~. Inc
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriUen approval of HBC Engineering, Inc.
07SS Page 1 of 1