Verizon-LR 990107REPORT OF REINFORCING STEEL INSPECTION
ENGINEERING, INC.
8901 Cat~n~' Frwy., Suit~ #100
Dallas, Texas 75247
Date of Service: 01/07/99
Client No.: 08644025
Client: The Beck Group
1700 Pacific Ave, Suite 3800
Dallas, Texas 752014619
Report No.: 9901421
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized:
Locations/Items Inspected:
On-site
Bay 7, north to south limits
Test Method:
Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT TEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT
Placing Drawings Approved X 3ar Length and Shape X Column Tied Propedy
Bar Size X ~ropar Bar Placement X Ties and Spaces
Bar Grade X ~ropedy Tied X Stin"up Spacing/Type
Rebar Clea~ X Iowel Bars in Place X Welded Splices
Form Clean X ~roper Bar Supports X Mechanical Splices
Nu.~ o~ Bets X .~p~,~ sp,~ces X Propar Cover X
Discrepancies/Comments:
Reinforcing bar size, numbers and spacing were as per specifications. Also, dowels
were in place.
Technician: M. Odom Started: 1:30 pm Stopped: 2:00 pm
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
(1) The Beck Group
H~Engineering, Inc.
Eug~
Vice President
309SS This report is exclusively for the use of the ctienl indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.