Loading...
ST9601-CS 981203'~":' DEC-03-1998 17:43 ~.TEAGUE NALL AND PERKINS --- 8173362813 P.01/04 ..I I . s .....H' ....E IIII1" IIr I"' I' ' To: Michael Martin, P.E. :~.~:. Engineering Department :>.:' City of Coppell ,!. Fax No.: (972) 304-3570 Subject: Wrangler Drive Reconstruction Project (Project No. ST 96-01 ) Date: December 3, 1998 Pages: 4, including this cover sheet. COMMENTS: Please see the following letter regarding the proposed 12-inch water line relocation on Wrangler Drive. I have made the revisions which we discussed this morning. If you authorize this work, our total contract amount for this project will be $137,000 :. ($132,000 for Basic Services and $5,000 for Special Services). To-date we have !' billed the City for $129,360. Should you have any questions or need any additional ~, information, please let me know. ii::.~' Thanks. A hard copy of tills information ~1! be sent ~ ~e From the desk of. ,, Mitttall A. Jones, P.E. Principal TeagUe Nall and Perkins, Inc. 915 Florence Street Fort Worth, Texas 76102 (817) 336-5773 Fax: (817) 336-2813 Ernall:mjones~tnp-online.corn = DEC-03-199~ 17:~3 TEAGUE NALL AND PERK INS 0173~6281~ R. 0~/0~ TEAGUE NALL AND PERKINS ~NC ENGINEERS · SURlYORS t MUNDIPAL CONS~ TAN~ De~mber 03, 1998 Mr. Michael Martin, P.E. Engineering Department City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell. Texas 75019 Re: Wrangler Road Reconstruction Consulting Engineer's Contract Modification to the Scope of Services Dear Mike: The enclosed Modification to the Scope of Services for the referenced Contract has been prepared, per your request, in accordance with the applicable provisions of the Engineering Services Contract for the Wrangler Drive Reconstruction Project dated August 13, 1996. This modified scope of services deletes the proposed work under Special Services Item No. 3 on Attachment "B" of the contract and adds in lieu of that work the design of approximately 900 linear feet of 12-inch water line relocation and other related improvements along Wrangler Drive, adjacent to the Coppell Middle School West. A preliminary opinion of probable construction cost forthese additional improvements is also enclosed for your information. The subject Modification of the Scope of Services is based upon the following understanding: 1. The alignment for the proposed water line relocation/adjustment will be along the south side of Wrangler Drive, from approximately Sta. 8+25 to Sta. 18+00, save and except a portion of the existing water approximately 30 feet either side of the two (2) water meter vaults ~o the school. 2. The City will provide plans for the existing water, sanitary sewer, paving and drainage improvements within and/or adjacent to the project area. 3. The proposed improvements will be incorporated into the current construction contract with Tiseo Paving by Change Order and will not require the preparation of a separate set of bid documents, specifications or contract documents, gl~ FLO~N~* SII~ZKr (817) DEC-03-1998 17:43 TERGUE NALL AND PERKINS -.~ 8173362813 P.03/04 Mr. Michael Martin, P.E. - City of Coppell December 03, 1998 Page 2 i,. .~.,. Should you have any questions regarding the proposed Modifications to the Scope of !,;: :. ,.,, ~. Services, please give me a ceil. Sincerely, Michael A. Jones, P.E. ~ '. Enclosures ! ~ ':~'~,,', O;~l~oJ-r14~i)l g61B4~Xs~c;rrel%cOntrlctmeclirrjdlon, weter Ilrm equsl, lelter. lrevll4d).Wpd DEC-05-1998 17:44 TEAGUE NALL AND PERK INS 8175562815 P. 04/04 ..!, · ',:,i~.?. CITY OF COPPELL "~='!' Consulting Engineer's Contract Modification to the Scope. of Service_s (ATTACHMENT "B" - SPECIAL SERVICES) I. DELETED SCOPE OF SERVICES Delete work under Special Services Item No. 3 related to separation of construction project into two (2) sets of plans. ! I!. ADDITIONAL SCOPE OF SERVICES i" Design of approximately 900 linear feet of 12-inch water line relocation and other related improvements along Wrangler Drive, adjacent to the Coppell Middle School !- West. Information from the previous design surveys for Wrangler Drive will be used as the base for the proposed design, therefore no additional design surveys will be ~?..! pe~ormed. III. PROJECT SCHEDULE The additional design will be completed within 20 working days from receipt of written approval/authorization for the Modification to the Scope of Services from the City. IV. COMPENSATION The Engineer shall be paid the same fee for the above described Additional Scope of Services as originally provided for Special Services Item No. 3 in an amount not to exceed the lump sum of Five 'l'housand and no/100 Dollars ($5,0_00,00). This amount includes nothing for design surveys and $5,000 for special services. APPROVED: AGREED/ACCEPTED: P S INC THE CITY OF COPPELL Date: Date: Attest: Attest.(:~ ~ ~ TOTAL P.04