' To: Michael Martin, P.E.
:~.~:. Engineering Department
:>.:' City of Coppell
,!. Fax No.: (972) 304-3570
Subject: Wrangler Drive Reconstruction Project (Project No. ST 96-01 )
Date: December 3, 1998
Pages: 4, including this cover sheet.
COMMENTS:
Please see the following letter regarding the proposed 12-inch water line relocation
on Wrangler Drive. I have made the revisions which we discussed this morning.
If you authorize this work, our total contract amount for this project will be $137,000
:. ($132,000 for Basic Services and $5,000 for Special Services). To-date we have
!' billed the City for $129,360. Should you have any questions or need any additional
~, information, please let me know.
ii::.~' Thanks.
A hard copy of tills information ~1! be sent ~ ~e
From the desk of. ,,
Mitttall A. Jones, P.E.
Principal
TeagUe Nall and Perkins, Inc.
915 Florence Street
Fort Worth, Texas 76102
(817) 336-5773
Fax: (817) 336-2813
Ernall:mjones~tnp-online.corn
= DEC-03-199~ 17:~3 TEAGUE NALL AND PERK INS 0173~6281~ R. 0~/0~
TEAGUE NALL AND PERKINS
~NC ENGINEERS · SURlYORS t MUNDIPAL CONS~ TAN~
De~mber 03, 1998
Mr. Michael Martin, P.E.
Engineering Department
City of Coppell
255 Parkway Blvd.
P.O. Box 478
Coppell. Texas 75019
Re: Wrangler Road Reconstruction
Consulting Engineer's Contract
Modification to the Scope of Services
Dear Mike:
The enclosed Modification to the Scope of Services for the referenced Contract has been
prepared, per your request, in accordance with the applicable provisions of the Engineering
Services Contract for the Wrangler Drive Reconstruction Project dated August 13, 1996.
This modified scope of services deletes the proposed work under Special Services Item
No. 3 on Attachment "B" of the contract and adds in lieu of that work the design of
approximately 900 linear feet of 12-inch water line relocation and other related
improvements along Wrangler Drive, adjacent to the Coppell Middle School West. A
preliminary opinion of probable construction cost forthese additional improvements is also
enclosed for your information.
The subject Modification of the Scope of Services is based upon the following
understanding:
1. The alignment for the proposed water line relocation/adjustment will be along
the south side of Wrangler Drive, from approximately Sta. 8+25 to Sta.
18+00, save and except a portion of the existing water approximately 30 feet
either side of the two (2) water meter vaults ~o the school.
2. The City will provide plans for the existing water, sanitary sewer, paving and
drainage improvements within and/or adjacent to the project area.
3. The proposed improvements will be incorporated into the current
construction contract with Tiseo Paving by Change Order and will not require
the preparation of a separate set of bid documents, specifications or contract
documents,
gl~ FLO~N~* SII~ZKr
(817)
DEC-03-1998 17:43 TERGUE NALL AND PERKINS -.~ 8173362813 P.03/04
Mr. Michael Martin, P.E. - City of Coppell
December 03, 1998
Page 2
i,.
.~.,. Should you have any questions regarding the proposed Modifications to the Scope of
!,;: :.
,.,, ~. Services, please give me a ceil.
Sincerely,
Michael A. Jones, P.E.
~ '. Enclosures
! ~ ':~'~,,',
O;~l~oJ-r14~i)l g61B4~Xs~c;rrel%cOntrlctmeclirrjdlon, weter Ilrm equsl, lelter. lrevll4d).Wpd
DEC-05-1998 17:44 TEAGUE NALL AND PERK INS 8175562815 P. 04/04
..!,
· ',:,i~.?. CITY OF COPPELL
"~='!' Consulting Engineer's Contract
Modification to the Scope. of Service_s
(ATTACHMENT "B" - SPECIAL SERVICES)
I. DELETED SCOPE OF SERVICES
Delete work under Special Services Item No. 3 related to separation of construction
project into two (2) sets of plans.
! I!. ADDITIONAL SCOPE OF SERVICES
i" Design of approximately 900 linear feet of 12-inch water line relocation and other
related improvements along Wrangler Drive, adjacent to the Coppell Middle School
!- West. Information from the previous design surveys for Wrangler Drive will be used
as the base for the proposed design, therefore no additional design surveys will be
~?..! pe~ormed.
III. PROJECT SCHEDULE
The additional design will be completed within 20 working days from receipt of
written approval/authorization for the Modification to the Scope of Services from the
City.
IV. COMPENSATION
The Engineer shall be paid the same fee for the above described Additional Scope
of Services as originally provided for Special Services Item No. 3 in an amount not
to exceed the lump sum of Five 'l'housand and no/100 Dollars ($5,0_00,00).
This amount includes nothing for design surveys and $5,000 for special services.
APPROVED: AGREED/ACCEPTED:
P S INC
THE CITY OF COPPELL
Date: Date:
Attest: Attest.(:~ ~ ~