Loading...
Verizon-LR 981231 CONCRETE COMPR JSSIVE STRENGTH f Date of Service: I1/24/1998 Client No.: 08644025 Report No.: 9831863 Project No.: 43-2333-98 ENGINEERING, INC. .. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/31/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 3:28am PLANT: 4 ! TIME SAMPLED: 4:00am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE(FI-AIR 62 F CONCRETE: 76 SLUMP: 6.0" Max TRUCKNO: 456 TICKETNO: 1187703 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 sw & West parking area, slab-on-grade thru Line 3, placement # 1 ASTM C-39 SAMPLE LOCATION: Sec below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 I 6.25 12/01/1998 7 90360 3200 1 2 6.25 12/01/I 998 7 92280 3260 Average 3230 I 3 6.25 ! 2/22/1998 28 l 12980 4000 I 4 6.25 12/22/I 998 28 115130 4070 Average 4040 i 5 6.25 01/19/1999 56 55O FRACTURE TYPE Sample location: 20' West from centerline firelane inside first driveway, along centerline driveway. This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of 5 CONCRETE COMPRLoSIVE STRENGTH TESi' ENGINEERING, INC. ..8901 Carpenter Frwy., Shire #100 Dallas, Texas 75247 Date of Service: 11/24/1998 Client No.: 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/31/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 ~ATCHTIME: 4:55am PLANT: 41 TIME SAMPLED: 5:20am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (I*) - AIR 62 F CONCRETE: 77 F SLUM}': 6.0" Max TRUCKNO: 456 TICKETNO: 1187779 AIR: N/A Am CONTENT (%): 6.1% UNIT WEIGHT (pc0: N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (iaches) TESTED (days) (lbs. force) (psi) 2 I 4.75 12/01/1998 7 108360 3830 2 2 4.75 ! 2/01 / 1998 7 108090 3820 Average 3830 2 3 4.75 12/22/1998 28 125000 4420 2 4 4.75 12/22/1998 28 123320 4360 Average 4390 2 5 4.75 01/19/1999 56 550 FRACTURE TYPE Sample location: Centerline southwest driveway limits, 175' northwest from centerline firelane. This report is exclusively tbr the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, INC. .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/24/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9831863 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Report Date 12/31/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TX1 PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTlI: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/24/1998 BATCH TIME: 6:06am TIME SAMPLED: 6:30am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 462 AIR CONTENT (%): 5.6% PLACEMENT LOCATION: See page I Partly cloudy 62 v CONCRETE: 74 TICKET NO: I 187873 UNIT WEIGHT (pc0.: N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 1 5.25 12/01/1998 7 106170 3750 3 2 5.25 12/01/I 998 7 104330 3690 Average 3720 3 3 5.25 12/22/1998 28 124720 4410 3 4 5.25 12/22/1998 28 122110 4320 Average 4370 3 5 5.25 01/19/1999 56 55O FRACTURE TYPE Sample location: 40' South and 10' west from northeast corner paving placement #1. This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 5 CONCRETE COMPREoSI STRENGTH TES i' Date of Service: 11/24/1998 Client No.: 08644025 Report No.: 9831863 Project No.: 43-2333-98 .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/31/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/24/1998 BATCH TIME: 7:31am TIME SAMPLED: 8:00am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 453 AIR CONTENT (%): 5.5°~o PLACEMENT LOCATION: See page I Cloudy 62 F CONCRETE: 74 F TICKETNO: 1188049 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 4 I 4.25 12/01/1998 7 115130 4070 4 2 4.25 12/01/1998 7 113980 4030 Average 4050 4 3 4.25 12/22/1998 28 151660 5360 4 4 4.25 12/22/1998 28 152430 5390 Average 5380 4 5 4.25 01/19/1999 56 FRACTURE TYPE Sample location: N/S driveway bay area @ centerline, 30' south form north edge. This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 5 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, INC. -8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/31/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 RATCtt TIME: 8:32am PLANT: 41 TIME SAMPLED: 9:15am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 70 F CONCRETE: 76+ F SLUMP: 6.0" Max TRUCK NO: 669 TICKET NO: 1188162 AIR: N/A AIR CONTENT (%): 5.1 o~ UNIT WEIGHT (pelt: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 580 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 5 1 4.25 12/01/I 998 7 89450 3160 5 2 4.25 12/01/I 998 7 91560 3240 Average 3200 5 3 4.25 12/22/1998 28 132410 4680 5 4 4.25 12/22/1998 28 130090 4600 Average 4640 5 5 4.25 01/19/1999 56 FRACTURE TYPE Sample location: Parking area bay 2, 100' from west edge, along centerline. Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (l) Thc Beck Group Started: 2:30am (1) The Beck Group (1) Dalcan, Inc. Finished: 4:30pm ~ Eng~~l~ Eugene Flarbour Vice President This reporl is exclusively tbr the usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page $ of 5 IN-PLACE DENSITY ESTING Date of Service: Client No.: Client: 11/17/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9831232 Project No.: 43-2333-98 Report Date 12/31/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density 1 2 See below for description See below for description 10.0 124.5 13.0 115.0 FIELD DENSITY TESTS -1/+3% 95% - I/+3% 95% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) Grade Beam Backfill 262 Outside, Line 8/A.5, 1st lift 263 Outside, Line J/9.5, 2nd lift 264 Outside, Line 11/E.8, 3rd lift 265 Inside, Line 11/E.3, 1st lift 266 Inside, Line 11/E.5, 3rd lift 1 13.0 118.3 95 2 14.5 115.0 100 1 12.9 118.6 95 1 12.8 119.2 96 2 13.3 111.8 97 Test results on this report meet project specification. M/D No. 1 - Dark reddish brown silty clayey sand w/gravel M/D No. 2 - Medium to light brown silty sand w/some sandstone Technician: Roy Montgomery Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group (1) The Beck Group Eugene Harbour Vice President This report is exclusively for the use &the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page I of 1 IN-PLACE DENSITY Tr STING Date of Service: Client No.: Client: 11/18/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENG--, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9831376 Report Date 12/31/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 MOISTURE DENSITY RELATIONS: M/D No. Field Test Method: ASTM D-2922 ASTM D-3017 Maximum Project Requirements Description Moisture % Density pcf Moisture Density I Dk reddish brown silty clayey 10.0 124.5 -1/+3% 95% 2 sand w/gravel 0.0 0.0 FIELD DENSITY TESTS TEST MfD MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) Grade Beam Backfill 267 Inside, Line A.8/2, 1st lift 1 13.0 118.6 268 Inside, Line A.5/3, 2nd lift ! 13.0 118.2 269 Inside, Line A.6/2, 3rd lift 1 13.0 118.6 270 Inside, Line C.4/2, 2nd lift i 11.8 121.4 An asterisk (*) appears next to test results which do NOT meet the project specifications. 95 95' 95 98 Technician: Roy Montgomery Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group (1) The Beck Group ~ Engineerin I Euge~' Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 1