Loading...
Coppell Industrial-LR010503 GEOTr:CH NICAL AND J~ ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 42 c/o Champion Partners, Ltd. REPORT DATE: 05-03-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 PAGE: 1 of 1 ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. AREA REPRESENTED: Pad from Lines A to N: Between rows 9 to 13. Boring Number/Pocket Pen Date Sample I Depth 04-10-01 0.0- 1.5 4.5+ 1.00 1.30 1.30 1.20 1.30 2.30 1.5- 3.0 4.5+ 1.00 1.80 2.50 1.00 3.00 1.80 3.0- 4.5 4.5++ 2.70 2.80 4.00 1.80 3.00 4.5+ 4.5- 6.0 N/A 4.5+ 4.5++ 3.50 2.00 4.5+ 4.5+ 6.0- 7.5 N/A 2.50 4.5++ 4.5+ 2.30 4.5++ 4.5+ Boring Number/Pocket Pen Date J Depth J Sampled (feet) W-38 W-39 W-40 04-10-01 0.0- 1.0 4.5+ 2.20 2.80 1.0- 2.0 2.30 1.50 4.5+ 2.0- 3.0 4.00 4.5++ 3.00 3.0- 4.0 4.5++ 4.5++ 3.50 4.0- 5.0 N/A 4.5++ 4.5+ 5.0- 6.0 N/A N/A 4.30 6.0- 7.0 N/A N/A 4.30 Comments: Borings obtained after three injection passes. Based on the test results, an additional pass was not considered necessary. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt KA/cg (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · -EL [il4] 350 5600 · =AX [214] 350 0019 I~1 !~: ~'" 'r-~ , I~ I'--'1 I:~ I r'"l ~" I~: I~1 I I'-! i~ GEOTECHNICALAND J J~J J~J r"l i I J~J ENVIRONMENTAL CONSULTANTS J CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 59 cio Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 05-03-01 Addison, Texas 75001 TECHNICIAN: S. Holliday ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 20'S, 275'E of N.E. building corner 60/300 2 Paving: 105'S, 270'E of N.E. building corner 130/300 3 Paving: 200'S, 285'E of N.E. building corner 220/300 Design Information Source of Concrete J Mix Identification J Specified Strength p.s.i. J Hanson 7752 4000 I Test Results No. ID Dat~ T~st~d T~st lbs. Strength p.s.i. Strength p.s.i. 1 7143 05-10-01 7 Damaged In Field 7143 05-31-01 28 Damaged In Field 7143 05-31-01 28 Damaged In Field 7143 Hold H 2 7144 05-10-01 7 90760 3210 7144 05-31-01 28 115540 4090 7144 05-31-01 28 115120 4070 4080 7144 Hold H 3 7145 05-10-01 7 116770 4130 7145 05-31-01 28 122320 4330 7145 05-31-01 28 132790 4700 4520 7145 Hold H -- I 2424 STUTZ DR. · SUITE 400 ,, DALLAS. TX 75235 ,, T'_-L [214] 350 5600" F~,X [214] 350 0019 Cylinder Data Set I CylinderI TimeofI I Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 7143 4.00 4:35AM 68 78 N/A 879872 2 7144 5.25 6:10AM 69 74 N/A 879886 3 7145 5.00 8:00AM 70 76 N/A 698526 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & QuJntana/ KeJth Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox