Verizon-LR 981229 CONCRETE COMPRESSIVE STRENGTH TES i' ENGINEP_Rnx~, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/30/1998 08644025 Report No.: 9829558 Project No.: 43-2333-98 Report Date 12/29/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/30/1998 BATCH TnViE: 6:13am PLANT: 41 TIME SAMPLED: 6:55am BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Mostly cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (~- Am 71 F CONCRETE: 79 F SLtnV~P: 5.0" Max TRUCK NO: 805 TICKET NO: 1171855 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc~: N/A TEST MEX~OO: ASTM C- 143 PLACEMENT LOCATION: Firelane running on W side of building #1 from N of building at Y-Split to SE comer of ASTM C- 172 Bldg 2 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 60 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 7.50 11/06/1998 7 94160 3330 1 2 7.50 11/06/1998 7 92040 3250 Average 3290 1 3 7.50 11/27/1998 28 125560 4440 I 4 7.50 11/27/1998 28 123810 4380 Average 4410 I 5 7.50 12/25/1998 56 137890 4880 Sample location: From NE corner of Bldg 1, west wing drawing Al.01, sampled 105' north and 30' east (by center island). 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 4 CONCRETE COMPRESSIVE' STRENGTH TEST ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/30/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 9829558 Report Date 12/29/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples., PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/30/1998 BATCHTIME: 8:09am PLANT: 41 TIME SAMPLED: 8:37am BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER COm)rrIoNs: Cloudy & windy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F)- AIR 74 F CONCRETE: 83 F SLUMP: 5.0" Max TRUCK NO: 457 TICKET NO: 1172062 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf):. N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 140 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.50 11/06/1998 7 93300 3300 2 2 5.50 11/06/1998 7 94650 3350 Average 3330 2 3 5.50 11/27/1998 28 126410 4470 2 4 5.50 11/27/1998 28 126220 4460 Average 4470 2 5 5.50 12/25/1998 56 139070 4920 FRACTURE TYPE Sample location: From NE corner of Bldg 1 west wing drawing Al.01, sampled 60' west and 10' north (by third island from north).Ten gallons of water added. 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 4 'CONCRETE COMPRESSIVE STRENGTH TESi' ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/30/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9829558 Report Date 12/29/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy & windy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (r) - AIR 74 F CONCRETE: 84 SLUMe: 5.0" Max TRUCK NO: 714 TICKET NO: 1172238 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pct):. N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/1998 ~ATCFt xnvm: 9:40am TIME SAMPLED: 10:09am ~¥: Dean Martin CYLINDER MARKED SET NO. REPORT OF TESTS ACCUMULATIVE YARDS: 200 MEASURED MAXI3IUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH (inches) TESTED (days) (lbs. force) (psi) 3 1 5.00 11/06/1998 7 101360 3580 3 2 5.00 11/06/1998 7 94420 3340 Average 3460 3 3 5.00 11/27/1998 28 129660 4590 3 4 5.00 11/27/1998 28 127790 4520 Average 4560 3 5 5.00 12/25/1998 56 142050 5020 FRACTURE TYPE Sample location: From NE corner of Bldg 1 west end drawing Al.01, sampled 125' west and 62' south (between 3rd & 4th island from north) .Five gallons of water added. This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TESi' Date of Service: 10/30/1998 Client No.: 08644025 Report No.: 9829558 Project No.: 43-2333-98 ENG[NF__ERIb~, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/29/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days SLtnm,: 5.0" Max AIR: N/A TEST M~THOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/1998 BATCH TIME: 1 l:36am TIME SAMPLED: 12:00pm BY: Dean Martin WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 714 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I (See attached sketch) Cloudy & windy 78 F CONCRETE: 85 F TICKET NO: 1172498 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: 15' S from 7th island from north CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 4.75 4 2 4.75 4 3 4.75 4 4 4.75 4 5 4.75 REPORT OF TESTS DATE TESTED 11/06/1998 11/06/1998 11/27/1998 11/27/1998 12/25/1998 AGE LOAD (days) (lbs. force) ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 7 102270 3620 7 101490 3590 Average 3610 28 130100 4600 28 129860 4590 Average 4600 56 139140 4920 300 FRACTURE TYPE Ten gallons of water added. Technician: Dean Martin Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. ( I ) The Beck Group Started: 5:00am (I) The Beck Group (I) Dalcan, Inc. Finished: 3:00pm ~ Engin~ Eugen~a~-bour Vice President This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4 ! ;; I: I: CoPP~ ROAD CONCRETE COMPRESSIVE' STRENGTH TES' t Date of Service: 12/17/1998 Client No.: 08644025 Report No.: 9833993 Project No.: 43-2333-98 ENGINF~RII~, INC. 89Ol Carpenter Frwy., SuRe #100 Dallas, Texas 75247 Report Date 12/29/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLtrM~: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/11/1998 BATCH TIME: 2:1 lpm TIME SAMPLED: 2:50pm BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (F). AIR 68 F CONCRETE: 68 TRUCK NO: 807 TICKET NO: 1200949 AIR CONTENT (%): N/A UNIX WEIGHT (per): N/A PLACEMENT LOCATION: Building columns Level 2 & 3 @ 9.3, P & L, 9-7, P & L CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 6.00 1 2 6.00 6.00 6.00 REPORT OF TESTS DATE AGE TESTED (days) 12/18/1998 7 12/18/1998 7 01/08/1999 28 01/08/1999 28 IVlAXIMUNI LOAD (lbs.~rc~ 139420 138950 Average ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 4930 4910 4920 FRACTURE TYPE 1 5 6.00 02/05/1999 56 Note: These four Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group (4) columns previously inspected (rebar). Started: 2:30pm (1) The Beck Group (1) Dalcan, Inc. Finished: 4:30pm Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRESSIVE 'STRENGTH TES I ENGINEERING, INC. 8.901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/29/1998 Report No.: 9829441 Report Date 12/29/1998 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTI{: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Piers L-9 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/29/1998 BATCH TEUE: 9: 10am TIME SAMPLED: 10:10am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 472 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear & mild 76 F CONCRETE: 78 TICKET NO: 117098 UNIT WEIGHT (pcf): N/A CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 i 6.50 11/05/1998 1 2 6.50 11/05/1998 1 3 6.50 11/26/1998 1 4 6.50 11/26/1998 1 5 6.50 12/24/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 20 MAXEVlldM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 92560 3270 7 89060 3150 Average 3210 28 99780 3530 28 101010 3570 Average 3550 56 116470 4120 FRACTURE TYPE Technician time: See Report #9829440 Technician: Brian Otis Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: (1) The Beck Group (I) Dalcan, Inc. Finished: I"~ ~, Inc. ~-u gene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of 1 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/18/1998 08644025 Report No.: 9834073 Project No.: 43-2333-98 Report Date 12/29/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive COppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COmm.~CTOR: BECK CONCm~TE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/18/1998 BATCH TIME: 3:07am PLANT: 41 TIME SAMPLED: 3:5am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 47 F CONCRETE: 67 F SLUM~: 6.0" Max TRUCK NO: 834 TICKET NO: 1201177 AIR: 3-5% AIR CONTENT (%): 4.6 UNIT WEIGHT (pcf):. N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: North paving quadrant slab-on-grade bay 2 & 3, 4 & 5 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) i 1 6.25 12/25/1998 7 78880 1 2 6.25 12/25/1998 7 79240 Average 1 3 6.25 01/15/1999 28 1 4 6.25 01/15/1999 28 1 5 6.25 02/12/1999 56 Sample location: bay 3, 50' south from centerline north driveway. ACCUMULATIVE YARDS: 600 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2790 2800 2800 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 7 CONCRETE COMPRESSIVE' STRENGTH TESqt' 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: Client: 12/18/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9834073 Project No.: 43-2333-98 Project: Report Date 12/29/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 47 F CONCRETE: 66 X~ SLUMP: 6.0" Max TRUCKNO: 463 TICI~TNO: 1201214 AIR: 3-5% AIR CONTENT (%): 4.5 UNIT WEIGHT (pcO~ N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/18/1998 BATCH TIME: 4:25am TIME SAMPLED: 4:45am BY: Mike Odom REPORT OF TESTS ACCUM~ATrVE Yams: 600 CYLINDER MEASURED MAXI3~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.75 12/25/1998 7 102400 3620 2 2 5.75 12/25/1998 7 99880 3530 Average 3580 2 3 5.75 01/15/1999 28 2 4 5.75 01/15/1999 28 FRACTURE TYPE 2 5 5.75 02/12/1999 56 Sample location: Bay 2, 35' south from centerline north driveway and 40' west form centerline bay 2. 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 7 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERIN3,1NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/18/1998 08644025 Report No.: 9834073 Project No.: 43-2333-98 Report Date 12/29/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DAT~: 12/18/1998 BATCH TrME: 5:38am PLANT: 41 TIME SAMPLED: 6:35am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 47 F CONCRETE: 63 V SLUMP: 6.0" Max TRUCK NO: 461 TICKET NO: ! 201267 AIR: 3-5% AIR CONTENT (%): 4.8 UNIT WEIGHT (pc0:. N/A T~ST M~THOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 600 CYLINDER MEASURED MAXI311JM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. farce) (psi) 3 i 6.50 12/25/1998 7 103080 3650 3 2 6.50 12/25/1998 7 101840 3600 Average 3630 3 3 6.50 01/15/1999 28 3 4 6.50 01/15/1999 28 FRACTURE TYPE 3 5 6.50 02/12/1999 56 Sample location: Bay 3- 15' West from east edge and 120' north from centerline north fire lane. This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 7 CONCRETE COMPRESSIVE STRENGTH TESi' ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/18/1998 Client No.: 08644025 Report No.: 9834073 Project No.: 43-2333-98 Report Date 12/29/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS S~U~NGTH: 4000 psi @ 28 Days SLtnv~P: 6.0" Max AIR: 3-5% TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/1811998 BATCH TnVIE: 7: 10am TIME SAMPLED: 7:40am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 462 AIR CONTENT (%): 4.9 PLACEMENT LOCATION: See page I Cloudy 48 ~' CONCRETE: 62 F TICKET NO: 1201364 UNIT WEIGHT (pcf)! N/A SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 4 1 6.00 12/25/1998 7 4 2 6.00 12/25/1998 7 4 3 6.00 01/15/1999 28 4 4 6.00 01/15/1999 28 ACCUMULATIVE YARDS: 750 MAXIMUM COMPRESSIVE LOAD STRENGTII (lbs. force) (psi) 103890 3670 99340 3510 Average 3590 FRACTURE TYPE 4 5 6.00 02112/1999 56 Sample location: Bay 3- 25' west from east edge and 100; north from centerline north fire lane. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 7 CONCRETE COMPRESSIVE STRENGTH TEST '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 12/18/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9834073 Project No.: 43-2333-98 Report Date 12/29/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/18/1998 BATCH TIME: 8:24am PLANT: 41 TIME SAMPLED: 8:50am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 50 F CONCRETE: 62 F SLtnvn,: 6.0" Max TRUCK NO: 466 TICKET NO.- 1201524 AIR: 3-5% AIR CONTENT (%): 4.4 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 5 1 5.50 12/25/1998 7 5 2 5.50 12/25/1998 7 5 3 5.50 01/15/1999 28 5 4 5.50 01/15/1999 28 ACCUMULATIVE YARDS: 750 MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 118790 4200 115140 4070 Average 4140 FRACTURE TYPE 5 5 5.50 02/12/1999 56 Sample location: Bay 3, 30' west from east edge and 55'north from centerline north fire lane. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 7 CONCRETE COMPRESSIVE sTRENGTH TESi? ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/18/1998 Report No.: 9834073 Report Date 12/2911998 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cor, rrRAcToa: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/18/1998 BATCI~ ThYmE: 10:08am PLANT: 41 TIME SAMPLED: 10:45am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 50 F CONCRETE: 68 F SLtnV~P: 6.0" Max TRUCK NO: 653 TICKET NO: 1201737 AIR: 3-5% AIR CONTENT (%): 4.7 UNIT WEIGHT (pcf):. N/A TEST M~THOO: ASTM C- 143 PLACEMENT LOCATION: See page - ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 750 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 5.75 12/25/1998 7 93940 3320 6 2 5.75 12/25/1998 7 102640 3630 Average 3480 6 3 5.75 01/15/1999 28 6 4 5.75 01/15/1999 28 6 5 5.75 02/12/1999 56 Sample location: Bay 4, 40' from north edge at centerline bay 4. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 6 of 7 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/18/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERIbI3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9834073 Report Date 12/29/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max AIR: 3-5% TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/18/1998 BATCH TIME: 11:30am TIME SAMPLED: 12:00pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 835 AIR CONTENT (%): 4.9 PLACEMENT LOCATION: See page I Drizzle, cloudy 51 F CONCRETE: 63 F TICKET NO: 1201877 UNIT WEIGHT (pc0:. N/A SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 7 1 6.25 12/25/1998 7 2 6.25 12/25/1998 MAXIMUM AGE LOAD (days) (lbs. force) ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 7 96340 3410 7 98120 3470 Average 3440 7 3 6.25 01/15/1999 28 7 4 6.25 01/15/1999 28 830 FRACTURE TYPE 7 5 6.25 02/12/1999 56 Sample location: Bay 5, 10' from east edge and 50' from north edge. Technician: Mike Odom Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 2:00am (1) The Beck Group (I) Dalcan, Inc. Finished: 12:30pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 7 of 7