Loading...
Verizon-LR 981228CONCRETE COMPREoSIVE STRENGTH TES Date of Service: 12/15/1998 Client No.: 08644025 Report No.: 9833696 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/15/1998 BATCHTIME: 5:02am PLANT: 41 TIME SAMPLED: 6:10am BY: Mike Odom SPECIFICATION REQUmEMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi @ 28 Days TEMPERATURE(~-AIR 36 F CONCRETE: 55 F SLUMm 6.0" Max TRUCKNO: 458 TICK~TNO: 1197964 AIR: 3-5% AIR CONTENT (%): 4.7 UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Paving slab-on-grade (parking) #3 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (i Aches) TESTED (days) I 1 6.75 12/22/1998 7 I 2 6.75 12/22/1998 7 I 3 6.75 01/12/1999 28 I 4 6.75 01/12/1999 28 I 5 6.75 02/09/1999 56 ACCUMULATIVE YARDS: 300 MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 80910 2860 82030 2900 Average 2880 FRACTURE TYPE Sample location: 40' North from Building Line 8 & 80' west from centerline weset fire lane. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 3 CONCRETE COMPRESSIVE STRENGTH TEST "8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/15/1998 08644025 Report No.: 9833696 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/15/1998 aATCH TIME: 6:36am PLANT: 41 TIME SAMPLED: 7:10am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F} - AIR 38 F CONCRETE: 57 -SLUMP: 6.0" Max TRUCK NO: 470 TICKET NO: 1198062 AIR: 3-5% AIR CONTENT (%): 4.8 UNIT WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 300 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 6.00 12/22/1998 7 98720 3490 2 2 6.00 12/22/1998 7 101010 3570 Average 3530 2 3 6.00 01/12/1999 28 2 4 6.00 01/12/1999 28 2 5 6.00 02/09/1999 56 Sample Location:Directly in Line W/Bldg Line E, 100' west from centerline west fire lane. FRACTURE TYPE 0ILL 4 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 3 coNCRETE COMPRESSIVE STRENGTH TEST '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/15/1998 08644025 Report No.: 9833696 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: 3-5% TZST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MARKED SET NO. PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/15/1998 aAYC}~ TIME: 7:45am TIME SAMPLED: 8:25am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F} - AIR TRUCK NO: 802 AIR CONTENT (%): 4.6 PLACEMENT LOCATION: See page I REPORT OF TESTS MEASURED SLUMP DATE AGE (inches) TESTED (days) 12/22/1998 7 12/22/1998 7 01/12/1999 28 01/12/1999 28 02/09/1999 56 3 I 6.50 3 2 6.50 3 3 6.50 3 4 6.50 Fair 40 F CONCRETE: 58 F TICKET NO: 1198189 UNIT WEIGHT (pcf~: N/A 3 5 6.50 MAXIMUM LOAD (Ibs.~rce) 80000 75840 Average ACCUMULATIVE YARDS: 330 COMPRESSIVE STRENGTH (psi) 2830 2680 2760 FRACYURE TYPE Sample location: (W) fire lane. Technician: Mike Odom Report Distribution: (1) The Beck Group ( l ) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Along centerline north side fire lane, 60' Started: 5:00am (I) Tile Beck Group (I) Dalcan, Inc. Finished: 9:30am west of centerline mCEn Eugen n-,rroour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3 IN-PLACE DENSITY TESTING ENGINEERING, INC. .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 12/16/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9833892 Project No.: 43-2333-98 Report Date 12/28/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Moisture % Maximum Density pcf Project Requirements Moisture Density 1 2 See below for description Lt gray sandy shaley clay w/red sand 12.5 18.5 116.5 107.0 - 1/+3 % 95 % -i/+3% 95% FIELD DENSITY TESTS TEST NO MfD MOISTURE TEST LOCATION No. (%) DRY DENSITY DENSITY (pcO (% max) North Parking Subgrade Bay 2, 50' N of N fire lane center line 1 15.0 Bay 2, 150' N of N fire lane, center line 1 13.7 Bay 3, 75' N of N fire lane, center line 2 17.9 Bay 3, 175' N of N fire lane, center line 1 13.9 Test results on this report meet project specification. 113.3 97 114.7 99 102.7 96 114.3 98 M/D No. 1 - Light brown and light gray silty sand with dark gray clay balls Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group (1) The Beck Group I'-I~. ~,Inc. Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TES'i 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 3'28am PLANT: 41 TIME SAMPLED: 4:00am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 62 F CONCRETE: 76 F SLUMP: 6.0" Max TRUCKNO: 456 TICKETNO: 1187703 AIR: N/A Am CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: SW & West parking area, slab-on-grade thru Line 3, placement #1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) I I 6.25 12/01/1998 7 90360 3200 1 2 6.25 12/01 / 1998 7 92280 3260 Average 3230 1 3 6.25 12/22/1998 28 112980 4000 I 4 6.25 12/22/1998 28 115130 4070 Average 4040 1 5 6.25 01/19/1999 56 FRACTURE TYPE Sample location: 20' West from centerline firelane inside first driveway, along centerline driveway. 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page ! of 5 2ONCRETE COMPRESSIVE STRENGTH TES'i .. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 4:55am eLANT: 41 TIME SAMPLED: 5:20am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 62 F CONCRETE: 77 SLUMP: 6.0" Max TRUCKNO: 456 TICKETNO: 1187779 AIR: N/A AIR CONTENT (%): 6.1 °/o UNIT WEIGHT (pcl): N/A TEST METilOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 4.75 12/01/1998 7 108360 3830 2 2 4.75 12/01 / 1998 7 108090 3820 Average 3830 2 3 4.75 12/22/1998 28 125000 4420 2 4 4.75 12/22/1998 28 123320 4360 Average 4390 2 5 4.75 01/19/1999 56 FRACTURE TYPE Sample location: Centerline southwest driveway limits, 175' northwest from centerline firelane. 0ILL This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TESt' .8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 aATCHTIME: 6:06am PLANT: 41 TIME SAMPLED: 6:30am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 62 F CONCRETE: 74 SLUMP: 6.0" Max TRUCK NO: 462 TICKET NO: 1187873 AIR: N/A AIR CONTENT (%): 5.6% UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 5.25 12/01/1998 7 106170 3 2 5.25 12/01/1998 7 104330 Average 3 3 5.25 12/22/1998 28 124720 3 4 5.25 12/22/1998 28 122110 Average 3 5 5.25 01/19/1999 56 ACCUMULATIVE YARDS: 550 COMPRESSIVE STRENGTH (psi) 3750 3690 3720 4410 4320 4370 FRACTURE TYPE Sample location: 40' South and 10' west from northeast corner paving placement #1. 0ILL This report is exclusively for thc use of the client indicated above aad shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 5 CONCRETE COMPRESSIVE STRENGTH TES i' .~901 Carpenter Frwy., Suite 0100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 7:3 lam PLANT: 4 i TIME SAMPLED: 8:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 62 F CONCRETE: 74 F SLUMP: 6.0" Max TRUCKNO: 453 TICKETNO: 1188049 AIR: N/A AIR CONTENT (%): 5.5% UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 4 1 4.25 12/01/1998 7 115130 4070 4 2 4.25 12/01/1998 7 113980 4030 Average 4050 4 3 4.25 12/22/1998 28 151660 5360 4 4 4.25 12/22/1998 28 152430 5390 Average 5380 4 5 4.25 01/19/1999 56 FRACTURE TYPE Sample location: N/S driveway bay area @ centerline, 30' south form north edge. This report is exclusively tbr thc usc &the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 5 'CONCRETE COMPRESSIVE STRENGTH TESf ENGINEERRXIG, INC. · . 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644O25 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 8:32am PLANT: 41 TIME SAMPLED: 9:lSam BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 70 F CONCRETE: 76+ F SLUMP: 6.0" Max TRUCKNO: 669 TICKET NO: 1188162 AIR: N/A A~R CONTENT (%): 5. I% UNIT WEIGItT (pc?: N/A TEST METtIOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 580 CYLINDER blEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 5 1 4.25 12/01/1998 7 89450 3160 5 2 4.25 12/01/1998 7 91560 3240 Average 3200 5 3 4.25 12/22/1998 28 132410 4680 5 4 4.25 12/22/1998 28 130090 4600 Average 4640 5 5 4.25 01/19/1999 56 FRACTURE TYPE Sample location: Parking area bay 2, 100' from west edge, along centerline. Technician: Mike Odom Report Distribution: ( I ) Thc Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: 2:30am (I) The Beck Group (1) Dalcan, Inc. Finished: 4:30pm H~ Engi~nc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 5 CONCRETE COMPRESSIVE STRENGTH TES' t ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831938 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 6.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along Line H, between 14-15 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 I 4.75 12/01/1998 1 2 4.75 12/01/1998 1 3 4.75 12/22/1998 1 4 4.75 12/22/1998 I 5 4.75 01/19/1999 PROJECT DATA CONCRETE CLASS: N/A PLACEMENT DATE: 11/24/1998 BATCH TIME: 2:39pm TIME SAMPLED: 3:20pm BY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F)- AIR 72 F CONCRETE: 80 F TRUCK NO: 814 TICKET NO: 1188847 AIR CONTENT (%): 1.4% UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: Grade beam along Line H between 13.5 & 18, along Line 18, between E.3-H REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 132050 7 135020 Average 28 176410 28 182020 Average 56 ACCUMULATIVE YARDS:35 COMPRESSIVE STRENGTH (psi) 4670 4770 4720 6240 6440 6340 FRACTURE TYPE Technician: Mike Odom Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (!) The Beck Group Started: N/A (1) The Beck Group (1) Dalcan, Inc. Finished: N/A ~ En~nc. Eug41~Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1 CONCRETE COMPRESSIVE STRENGTH TES I' · 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/24/1998 08644025 Report No.: 9831937 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: I 1/24/1998 BATCHTIME: 2:47pm PLA~rr: 41 TIME SAMPLED: 3:40pm aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F)-AIR 71 F CONCRETE: 73 F SLUMP: 6.0" Max TRUCK NO: 481 TICKET NO: I 188867 AIR: N/A AIR CONTENT (%): 1.5% UNIT WEIGHT (pc0.: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Column building area B, Level 1-2, N-9.7, 10-P-9.3, 9.7, H-13, M.5-9.3, east elev. ASTM C- 172 passenger walls, Area B ASTM C-39 SAMPLE LOCATION: Column P-9.3 sampled REPORT OF TESTS ACCUMULATIVE YARDS: 12.5 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.50 12/01 / 1998 7 138420 4900 1 2 6.50 12/01/1998 7 136710 4830 Average 4870 1 3 6.50 12/22/1998 28 185470 6560 1 4 6.50 12/22/1998 28 183100 6480 Average 6520 I 5 6.50 01/19/1999 56 Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: N/A (l) The Beck Group (1) Dalcan, Inc. Finished: N/A I-I~~, Inc. ne Harbour F:~_ne Harbour Vice President This report is exclusively £or the use of the client indicated above and shall not be reproduced except in full without the written approval of HDC Engineering, Inc. 0ILL Page I of 1 CONCRETE COMPRESSIVE STRENGTH TES'i' IBC 8.901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/23/1998 08644025 Report No.: 9831744 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 l SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: N-9 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/23/1998 aATCH TIME: 2:43pm TIME SAMeLED: 3:15pm aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 724 AIR CONTENT (%): 1 PLACEMENT LOCATION: Partly cloudy 72 F CONCRETE: 78 TICKET NO: i 187553 UNIT WEIGHT (pcf): N/A Building Area B Column Level 1-2, @ N-9, N-9.3, M-9.3, J-9.7 & 9.3, K-9.7 & 9.3 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 6.50 6.50 6.50 6.50 1 5 6.50 DATE TESTED REPORT OF TESTS ACCUMULATIVE YARDS: 17.5 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 11/30/1998 11/30/1998 12/21/1998 12/21/1998 01/18/1999 7 149510 5290 7 146620 5190 Average 5240 28 197610 6990 28 195990 6930 Average 6960 56 Technician time: See Technician: Mike Odom Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (l) The Beck Group Report #9831863 Started: (1) The Beck Group (1) Dalcan, Inc. Finished: ~ E ~g, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of 1 CONCRETE COMPRESSIVE STRENGTH TES'/ IBC 8.901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/15/1998 08644025 Report No.: 9833695 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Fair to partly cloudy STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 37 F CONCRETE: 57 F SLUMP: 6.0" Max TRUCKNO: 470 TICKETNO: 1197892 AIR: NA AIR CONTENT (%): 1.7 UNIT WEIGHT (pct):. N/A TEST METtIOD: ASTM C-143 PLACEMENT LOCATION: East wing building slab on grade (Level I) 15-18, E-H Lines ASTM C-172 ASTM C-39 SAMPLE LOCATION: G.5 @ 16 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 12/15/1998 ~ATCH TIME: 3:05am TIME SAMPLED: 3:40am DY: Mike Odom REPORT OF TESTS ACCUMULATIVE YARDS: 170 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I i 5.75 12/22/1998 7 924 ! 0 3270 1 2 5.75 12/22/1998 7 94380 3340 Average 3310 1 3 5.75 01/12/1999 28 i 4 5.75 01/12/1999 28 1 5 5.75 02/09/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. {tILL Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TES'-i Date of Service: 12/15/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 9833695 43-2333-98 IBC ENGINEERI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/28/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENaTH: 3000 psi @ 28 Days SLUMP: 6.0" Max AIR: NA TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 12/15/1998 BATCH TIME: 4:12am TIME SAMPLED: 4:40am BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (F)-AIR 38 F CONCRETE: 58 F TRUCK NO: 474 TICKET NO: 1197924 AIR CONTENT (%): N/A UNIT WEIGIIT (pcf).~ N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: E.5 @ 17.5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 2 1 6.25 2 2 6.25 2 3 6.25 2 4 6.25 REPORT OF TESTS DATE TESTED 12/22/1998 12/22/1998 01/12/1999 01/12/1999 AGE (days) 28 28 ACCUMULATIVE YARDS: 170 MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs, force) (psi) 92160 3260 92390 3270 Average 3270 FRACTURE TYPE 2 5 6.25 02/09/1999 56 Samples were taken from hopper. Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 2:00am (1) The Beck Group (1) Dalcan, Inc. Finished: 5:00pm ~ Engi~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST 6901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/27/1998 08644O25 Report No.: 9829176 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENTOATE: 10/27/1998 BATCHTIME: 6:43am PLANT: 41 TIME SAMPLED: 7:20am BY: Danny Neu SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTIt: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 62 F CONCRETE: 71 F SLUMP: 5.0" Max TRUCK NO: 456 TICr~T NO: 1167981 AIR: 3-5% AIR CONTENT (%): 4.2% UNIT WEIGHT (pef~: N/A TEST METtIOD: ASTM C- 143 PLACEMENT LOCATION: Paving from fire hydrant; 225' north & 10' west ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement locatioa REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 I 6.50 I 1/03/1998 7 89520 3170 1 2 6.50 11/03/1998 7 87370 3090 Average 3130 1 3 6.50 I i/24/1998 28 132300 4680 1 4 6.50 I 1/24/1998 28 125860 4450 Average 4570 I 5 6.50 12/22/1998 56 140240 4960 90 FRACTURE TYPE Note: Sample taken from truck. This report is exclusively for the usc of the client indicated above aad shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 4 CONCRETE COMPRESSIVE STRENGTH TEST · 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: Client: 10/27/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9829176 Project No.: 43-2333-98 Report Date 12/28/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/1998 BATCHTIME: 7:41am PLANT: 41 TIME SAMPLED: 8:07am BY: Danny Neu SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTIt: 3500 psi @ 28 Days TEMPERATURE (F) - AIR 64 F CONCRETE: 71 F SLUMe: 5.0" Max TRtJCK NO: 727 TICKET NO: 1168102 AIR: 3-5°~ AIR CONTENT (%): 4.1% UNIT WEIGHT (pcf).: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: ASTM C-172 Paving: Fire lane A, north side of building ASTM C-39 SAMPLE LOCATION: From fire hydrant, 75' N & 9' W REPORT OF TESTS ACCUMULATIVE YARDS: 230 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.75 11/03/1998 7 86170 3050 2 2 5.75 11/03/1998 7 89940 3180 Average 3120 2 3 5.75 11/24/1998 28 108110 3820 2 4 5.75 11/24/1998 28 107140 3790 Average 3810 2 5 5.75 12/22/1998 56 113840 4030 FRACTURE TYPE This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 0ILL Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TES I -.8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/27/1998 08644025 Report No.: 9829176 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTm 3500 psi ~ 28 Days SLUMP: 5.0" Max AIR: 3-5% TEST METItOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/27/1998 BATCH TIME: 8:29am TIME SAMPLED: 8:59am BY: Danny Neu WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 837 AIR CONTENT (%): 3.9% PLACEMENT LOCATION: Partly cloudy 65 F CONCRETE: 71 F TICKET NO: 1168205 UNIT WEIGHT (pc~): N/A Paving: Fire lane A, noah side of building SAMPLE LOCATION: From fire hydrant, 20' S & 7' W CYLIND ER MEASURED MARKED SLUMP SET NO. (inches) 3 I 6.00 3 2 6.00 6.00 6.00 6.00 3 3 3 4 3 5 REPORT OF TESTS DATE AGE TESTED (days) 11/03/1998 7 I i/03/1998 7 11/24/1998 28 11/24/1998 28 12/22/1998 56 MAXIMUM LOAD (lbs. force) 91840 89620 Average 135930 127780 Average 143640 ACCUMULATIVE YARDS: 320 COMPRESSIVE STRENGTH (psi) 3250 3170 3210 4810 4520 4670 5080 FRACTURE TYPE This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TES'I ..8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/27/1998 08644025 Report No.: 9829176 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 1 SPECIFICATION REQUIREMENTS STRENGTtI: 3500 psi ~ 28 Days SLUMP: 5.0" Max AIR: 3 -5o//0 TEST METllOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From fire hydrant; 40' S & 112' W CYL1NDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 I 6.00 11/03/1998 4 2 6.00 11/03/1998 4 3 6.00 11/24/1998 4 4 6.00 11/24/1998 4 5 6.00 12/22/1998 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/27/1998 BATCH TIME: 8:46am TIME SAMPLED: 9:22am BY: Danny Neu WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F)-AIR 65 ~' CONCRETE: 71 TRUCKNO: 726 TICKETNO: 1168246 AIR CONTENT (%): 4.1% UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: Paving: Fire lane A, north of building REPORT OF TESTS ACCUMULATIVE YARDS: 370 MAXIMUM COMPRESSIVE AG E LOAD STRENGTH (days) (lbs. force) (psi) 7 91430 3230 7 89620 3170 Average 3200 28 104220 3690 28 100360 3550 Average 3620 56 111580 3950 FRACTURE TYPE Technician: Danny Neu Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: 6:00am (1) The Beck Group (1) Dalcan, Inc. Finished: 1 l:00am H~ Engine. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0iLL Page 4 of 4 CONCRETE COMPRESSIVE STRENGTH TEST · ' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 10/27/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9829199 Project No.: 43-2333-98 Report Date 12/28/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/1998 BATCHTIME: 12:58pm PLANT: 41 TIME SAMPLED: 1:45pm BY: Brian Otis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cleadwarm STRENGTlI: 3000 psi ~ 28 Days TEMPERATURE (F) - AIR 78 F CONCRETE: 78 E SLUMP: 5.0" Max TRUCKNO: 728 TICKET NO: 1168789 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc.O: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers F-I ! REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 6.25 11/03/1998 7 93280 3300 1 2 6.25 11/03/1998 7 91030 3220 Average 3260 I 3 6.25 ! 1/24/1998 28 135950 4810 I 4 6.25 11/24/1998 28 133800 4730 Average 4770 I 5 6.25 12/22/1998 56 145080 5130 10 FRACTURE TYPE Technician time: See Report #9829198 Technician: Brian Otis Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: (1) The Beck Group (l) Dalcan, Inc. Finished: ~ Eng~qc. Eugene Harbour Vice President This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of ! CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 10/26/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 9829116 43-2333-98 IBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/28/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: T×I PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/26/1998 aATCH TIME: 10:55am TIME SAMPLED: 1 l:40am aY: Brian Otis WEATHER CONDITIONS: Clear & mild TEMPERATURE (F) - AIR 76 F CONCRETE: 78 F TRUCK NO: 472 TICKET NO: 1167220 AIR CONTENT (%): N/A UNIT WEIGHT (per):. N/A PLACEMENT LOCATION: Piers SAMPLE LOCATION: Piers- G-12 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXI~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 6.00 11/02/1998 7 101610 3590 1 2 6.00 11/02/1998 7 99230 35 i0 Average 3550 1 3 6.00 11/23/1998 28 131510 4650 1 4 6.00 11/23/1998 28 127640 45 l0 Average 4580 1 5 6.00 12/21/1998 56 138440 4900 10 FRACTURE TYPE Technician time: See Report #9829115, Sample taken from truck. Technician: Brian Otis Report Distribution: ( 1 ) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: (1) The Beck Group (1) Dalcan, [nc. Finished: I'"I~~]~i~' I nc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of I CONCRETE COMPRESSIVE STRENGTH TEST -. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/28/1998 08644025 Report No.: 9829318 Project No.: 43-2333-98 Report Date 12/28/1998 Client: The Beck Group Atto: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 ! SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max. AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Piers- J-9.3 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/28/1998 aATCI~ X~m: 10:07am TIME SAMPLED: ]. 1:00am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - Am TRUCK NO: 802 Am CONTENT (%): N/A PLACEMENT LOCATION: Piers Cloudy-mild 70 g CONCRETE: 78 g TICKET NO: 1169737 UNIT WEIGHT (pc~r): N/A CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 6.50 11/04/1998 1 2 6.50 11/04/1998 1 3 6.50 11/25/1998 1 4 6.50 11/25/1998 1 5 6.50 12/23/1998 REPORT OF TESTS ACCU1VIULATIVE YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lb~ force) (psi) 7 96240 3400 7 93080 3290 Average 3350 28 139160 4920 28 136570 4830 Average 4880 56 149480 5290 FRACTURE TYPE Technician time: See Report #9829317 Sample taken from truck, no water added. Technician: Brian Otis Report Distribution: (!) The Beck Group (!) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: (1) The Beck Group (I) Dalcan, Inc. Finished: Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1