Loading...
Verizon-LR 981222IN'PLACE DENSITY I'ESTING Date of Service: Client No.: Client: 12/14/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 IBC ENGINEF_RII~, INC. ~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9833615 Project No.: 43-2333-98 Report Date 12/22/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density 1 2 See below for description Dk reddish brown silty clayey sand w/gravel 10.0 124.5 10.0 124.5 FIELD DENSITY TESTS -1/+3% 95% Opt. or above 97% TEST NO M/D MOISTURE TEST LOCATION No. (%) DRY DENSITY DENSITY (pcf) (% max) 312 313 314 315 316 Bidg, E Wing, Subgrade G at 16, Select fill grade 2 12.8 E.5 at 17, Select fill grade 2 13.1 Parking Area Subgrade See below for test location I 11.9 See below for test location 1 12.6 See below for test location 1 12.6 Test results on this report meet project specification. 121.4 98 121.2 97 122.7 99 118.9 96 118.4 95 M/D ~1 - Dark reddish brown silty clayey sand w/gravel. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 2 Rep~'$rt No.: 9833615 Test Locations for: #3 - For Placement #3 along building, line F, 100' west of center line fire lane. #4 - For Placement #3 along building, line E, 50' west of center line fire lane. #5 - For Placement #3 along center line, north fire lane, 30' west for center line west fire lane. Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. ( 1 ) Brockette Davis Drake, Inc. (|) The Beck Group (I) The Beck Group I-~ Engineerin . Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 2 of 2 CONCRETE COMPRESSIVE Date of Service: 12/08/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TES'i' -.8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9833080 Project No.: 43-2333-98 Report Date 12/22/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTtI: 5000 psi ~ 28 Days SLUMP: 6.0*' Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: HQ 18 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 5.75 1 2 5.75 1 3 5.75 I 4 5.75 I 5 5.75 DATE TESTED 12/15/1998 12/15/1998 01/05/1999 01/05/1999 02/02/1999 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/08/1998 BATCH TIME: 1:28pm TIME SAMPLED: 2: 10pm BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (F)-AIR 53 F CONCRETE: 71 F TRUCKNO: 450 TICKETNO: 1195682 AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A PLACEI~IENT LOCATION: East wing, Level I-2 Columns ~ E-16, 17, 18 & H-16, 17,18 REPORT OF TESTS AGE (days) 28 28 ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 146790 5190 146240 5170 Average 5180 16.5 FRACTURE TYPE 56 No visual AEA in mix. Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: 1:00pm (1) The Beck Group (1) Dalcan, Inc. Finished: 3:30pm Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I I ONCRETE COMPRESSIVE STRENGTH TES ENGINEERING, INC. · 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/09/1998 Client No.: 08644025 Client: The Beck Group At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9833168 Project No.: 43-2333-98 Report Date 12/22/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: t2/09/1998 BATCH TIME: 3:54am PLANT: 41 TIME SAMPLED: 4:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTm 5000 psi @ 28 Days TEMPERATURE (F) - AIR 37 F CONCRETE: 64 SLUMP: 6.0" Max TRUCKNO: 461 TIC~TNO: 1195830 AIR: N/A AIR CONTENT (%): 1.4 UNIT WEIGHT (pc0.: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building Area A (west wing), Level II, Line 1-5.7, A-D, slab ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 1.5 ~ B REPORT OF TESTS ACCUMULATIVE YARNS: 450 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 12/11/1998 2 92500 3270 I 2 5.50 12/12/1998 3 108910 3850 I 3 5.50 ! 2/16/1998 7 159240 5630 1 4 5.50 12/16/I 998 7 157 ! 10 5560 Average 5600 1 5 5.50 01/06/I 999 28 1 6 5.50 01/06/1999 28 0ILL This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 8 Report No.: 9833168 ' ~ CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 7 5.50 02/03/1999 56 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 8 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, 1NC. "8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/09/1998 08644025 Report No.: 9833168 Project No.: 43-2333-98 Report Date 12/22/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTIi: 5000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METIIOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 3.5 ~ C PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/09/1998 BATCH TIME: 5' 19am TIME SAMPLED: 6:00am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 834 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Fair 35 F CONCRETE: 63 F TICKET NO: 1195890 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 450 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.75 12/I 1/1998 2 93420 3300 2 2 5.75 12/12/1998 3 109050 3860 2 3 5.75 12/16/1998 7 162510 5750 2 4 5.75 12/16/1998 7 162120 5730 Average 5740 2 5 5.75 01/06/1999 28 2 6 5.75 01/06/1999 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011,L Page 3 of 8 Report No.: 9833168 H~ CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 7 5.75 02/03/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 8 CONCRETE COMPRL SIVE STRENGTH TES':a' ENGINF_Y_RII~, liNC. -'8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/09/1998 08644025 Report No.: 9833168 Project No.: 43-2333-98 Report Date 12/22/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/09/1998 BATCHTIME: 7:04am PLANT: 41 TIME SAMPLED: 7:40am BY: Mike Odom SPECIFICATION REQmREMENTS WEATHER CONDITIONS: Fair STRENGTH: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 38 F CONCRETE: 66 F SLUMP: 6.0" Max TRUCK NO: 835 TICKET NO: 1196017 AIR: N/A A1R CONTENT (%): 1.6 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: c.5 @ 4.5 REPORT OF TESTS ACCUMULATIVE YARDS: 450 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 I 5.25 12/11/1998 2 92330 3270 3 2 5.25 i 2/12/1998 3 108580 3840 3 3 5.25 12/16/1998 7 160280 5670 3 4 5.25 12/16/1998 7 161140 5700 Average 5690 3 5 5.25 01/06/1999 28 4 6 5.25 01/06/1999 28 FRACTURE TYPE This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 8 Report No.: 9833168 " H~ CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 7 5.25 02/03/1999 56 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 6 of 8 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEF_RIb~, INC. · ~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/09/1998 08644025 Report No.: 9833168 Project No.: 43-2333-98 Report Date 12/22/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TX[ PLACEMENT DATE: 12/09/1998 BATCH TIME: 8:39am PLANT: 41 TIME SAMPLED: 9:10am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTIt: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 42 F CONCRETE: 66 F SLUMP: 6.0" Max TRUCKNO: 541 TICKETNO: 119620111 AIR: N/A AIR CONTENT (°/o): N/A UNIT WEIGHT {pc0: N/A TEST METIlOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: C.7 ~ 5.7 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 4 1 6.25 12/11/1998 2 98260 4 2 6.25 12/12/1998 3 104270 4 3 6.25 12/16/1998 7 158930 4 4 6.25 12/16/1998 7 158170 Average 4 5 6.25 01/06/i 999 28 4 6 6.25 01/06/1999 28 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTI1 (psi) 3470 3690 5620 5590 5610 5O0 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL I'nge 7 of 8 Report No.: 9833168 CYLINDER MARKED SET NO. 4 7 MEASURED SLUMP (inches) 6.25 DATE TESTED 02/03/1999 AGE (days) 56 MAXIMUM LOAD (lbs. force) COMPRESSIVE STRENGTH (psi) FRACTURE TYPE Ail samples taken from hopper. Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (l) The Beck Group Started: 2:30am Finished: 1 l:00am I--BC Engineering, Inc. (1) The Beck Group (I) Dalcan, Inc, Eugene Harbour Vice President This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 8 of 8