Loading...
Coppell Industrial-LR010416 GEOTECHNiCAL Ah.~ ~ F:;I I-1 I I F~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial. Ltd. REPORT NO. 33 c/o Champion Partners. Ltd. REPORT DATE: 04-16-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: C. Johnson & ATTN: Mr. Kerry Burden K. Blaylock PAGE: 1 of 1 On these dates a representative of Reed Engineering Group. Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth (ft) I Injection Spacing (ft) I Injection Pressure (psi) Injection Intervals (in) 10 5 100-200 12-18 Equipment Number of Number of Probes I Length of Probes Probe Spacing Rigs (ea) i (ft) (ft) 4 4 12.6 2 Date I Area Injected (sq ft) I Average Pressure (psi) Pass No. 03-19-01 34.800 150 2 29.000 150 1 10.000 150 3 03-20-01 57,000 150 2 03-21-01 44,400 150 2 27,600 150 3 03-22-01 18,600 150 1 46,00O 150 3 03-23-01 36,800 150 3 29,400 150 1 Surfactant added at regular intervals: Yes Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./Mr. Jason Nunley (1) AECC. Inc./Mr. Fran Carter Original Signed By (1) Meinhardt & Quintana/ Mr. David Meinhardt James F. Phipps. P.E. (1) Haynes Whayley Associates Inc./ BW/cg Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone ?.424 STUTZ DR. · SUITE 400 o DALLAS. TX 75235 · TEL [2.14] 350 S600 · ~X [2.14] 350 0019