Loading...
Verizon-LR 981221CONCRETE COMPRESSIVE STRENGTH TES'£ Date of Service: 10/23/1998 Client No.: 08644025 Report No.: 9828918 Project No.: 43-2333-98 ENGINEERING, INC. · ' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/21/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TX! PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST MET~IOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/23/1998 BATCH TIME: 10:01am TIME SAMPLED: 10:49am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 725 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear/mild 58 F CONCRETE: 69 V TICKET NO: 1165739 UNIT WEIGHT (pc.D: N/A SAMPLE LOCATION: Piers-G-16 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 I 5.00 1 2 5.00 1 3 5.00 1 4 5.00 1 5 5.00 REPORT OF TESTS ACCUMULATIVE YARDS: 20 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 10/30/1998 7 106790 3780 10/30/1998 7 110340 3900 Average 3840 11/20/1998 28 154350 5460 11/20/1998 28 159480 5640 Average 5550 12/18/1998 56 167000 5910 FRACTURE TYPE Technician time: See Technician: Brian Otis Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (!) The Beck Group Report #9828918 Started: (1) The Beck Group (I) Dalcan, Inc. Finished: ~ Engels Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TESt! Date of Service: 10/22/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9828794 Report Date 12/21/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max. AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/22/1998 BATCH TIME: l:31pm TIME SAMPLED: 2:42pm aY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRVCK NO: 483 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear/mild 79 F CONCRETE: 81 F TICKET NO: 1165034 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: Piers E-18 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.75 1 2 5.75 ! 3 5.75 1 4 5.75 1 5 5.75 REPORT OF TESTS DATE TESTED 10/29/1998 10/29/1998 11/19/1998 11/19/1998 12/17/1998 ACCUMULATIVE YARDS: 100 MAXIMUM COMPRESSIVE AGE LOAD STRENGTII (days) (lbs. force) (psi) 7 80170 2830 7 84820 3000 Average 2920 28 119630 4230 28 117890 4170 Average 4200 56 127060 4490 Technician time: See Technician: Brian Otis Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Report #9828793 Started: (1) The Beck Group (1) Dalcan, Inc. Finished: ~ E~~g, Inc. Eug~Harbour Vice President FRACTURE TYPE 01 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of I CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, INC. "8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831603 Project No.: 43-2333-98 Report Date 12/21/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 1 1/20/1998 BATCH TIME: 2:01pm TIME SAMPLEO: 2:35pm aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 474 AIR CONTENT (%): 1.4°~ PLACEMENT LOCATION: Cloudy 54 F CONCRETE: 79 F TICKET NO: 1186325 UNIT WEIGHT (pc0: N/A Grade beam G9, Gl0 & 12 between 9.3-10, & 10-13, grade beam Line E between 15.7-18 & Line 18 between E & E.3 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.75 1 2 5.75 1 3 5.75 i 4 5.75 1 5 5.75 DATE TESTED 11/27/1998 11/27/1998 12/18/1998 12/18/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 151560 5360 7 150020 5310 Average 5340 28 185000 6540 28 183140 6480 Average 6510 01/15/1999 56 30 FRACTURE TYPE Sample location: Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Line E, grade beam between 16.5, 17, Started: 2:00pm Finished: 3:00pm ( I ) The Beck Group ( I ) Dalcan, Inc. first lift. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TES'f · . 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/20/1998 Report No.: 9831595 Report Date 12/21/1998 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST M~IOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E @ 12 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.75 1 2 4.75 1 3 4.75 1 4 4.75 1 5 4.75 DATE TESTED 11/27/1998 11/27/1998 12/18/1998 12/18/1998 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/20/1998 BATCH TIME: 2:26pm TIME SAMPLED: 3:05pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR CONTENT (%): 1.2% PLACEMENT LOCATION: Cloudy 56 V CONCRETE: 69 F TICKET NO: 1186367 UNIT WEIGHT (pc.f): N/A Column Level I-2 @ E @ 12, 13, 14, 15 & F @ 15 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 187010 6610 7 188460 6660 Average 6640 28 223060 7890 28 224470 7940 Average 7920 01/15/1999 56 13.5 FRACTURE TYPE Technician: Mike Odom Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. (l) Brockette Davis Drake. Inc. (I) The Beck Group Started: 3:00pm (1) The Beck Group (1) Dalcan, Inc. Finished: 4:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TES'it 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/19/1998 Client No.: 08644025 Report No.: 9831410 Project No.: 43-2333-98 Report Date 12/21/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 1 SPECIFICATION REQUIREMENTS S~m~N~tH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: NA TEST M~T~OO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: F- 13 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 6.50 1 2 6.50 1 3 6.50 1 4 6.50 1 5 6.50 DATE TESTED 11/26/1998 11/26/1998 12/17/1998 12/17/1998 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/19/1998 BATCH TIME: 2:12pm TIME SAMPLED: 2:45pm BY: Mike Odom WEATHER CONDITIONS: Cloudy/breezy TEMPERATURE (F). AIR 76 ~* CONCRETE: 81 F TRUCK NO: 461 TICKET NO: 1185026 AIR CONTENT (%): 1.2°~ UNIT WEIGHT (pcf):. N/A PLACEMENT LOCATION: Level 1-2 columns @ Grid Lines E,F, G @ 11, M-10, F & C @ 13, 14 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 158590 5610 7 155520 5500 Average 5560 28 178030 6300 28 173010 6120 Average 6210 01/14/1999 56 18.5 FRACTURE TYPE Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: 10:30am (1) The Beck Group (I) Dalcan, Inc. Finished: 4:30pm ~ Engine~~nc. Eugene Harbour Vice President This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval or' HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TE$ ENGINEERING, 1NC. .. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/11/1998 08644025 Report No.: 9833418 Project No.: 43-2333-98 Report Date 12/21/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST lVmTHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: D @ 4 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/11/1998 BATCH TIME: l:40pm TIME SAMPLED: 2:30pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 481 AIR CONTENT (%): 1.4 PLACEMENT LOCATION: Cloudy 42 F CONCRETE: 58 F TICKET NO: 1197033 UNIT WEIGHT (p~cf): N/A Building columns Level 11, III, west wing, A-D & 1-7 Lines REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 ! 6.00 12/14/1998 3 65520 1 2 6.00 12/14/1998 3 70300 1 3 6.00 12/14/1998 3 56600 Average 1 4 6.00 12/18/1998 7 112800 1 5 6.00 12/18/1998 7 115110 Average 1 6 6.00 01/08/1999 28 1 7 6.00 01108/1999 28 ACCUMULATIVE YARDS: 38 COMPRESSIVE STRENGTH (psi) 2320 2490 2000 2270 3990 4070 4030 FRACTURE TYPE This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 2 Report No.: 9833418 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 8 6.00 DATE TESTED 02/05/1999 AGE (days) 56 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockettc Davis Drake, [nc. (1) The Beck Group Started: 8:30am (1) The Beck Group (1) Dalcan, Inc. Finished: 4:30pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac. 0ILL Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TE , £ ENGINEERIb~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831526 Project No.: 43-2333-98 Report Date 12/21/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along Line 1.5 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 11/20/1998 BATCH TIME: 3:3 lam TIME SAMPLED: 4:20am BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (F) - AIR 48 g CONCRETE: 68 F TRUCK NO: 802 TICKET NO: 1 185201 AIR CONTE~rr (%): 1.4% UNIT WEIG~rr (pc? N/A PLACEMENT LOCATION: Bldg slab-on-grade Area A-between Grid Lines A & D, I & 6 REPORT OF TESTS ACCUMULATIVE YARDS: 300 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) I I 6.50 11/27/1998 7 111980 3960 1 2 6.50 11/27/1998 7 109950 3890 Average 3930 1 3 6.50 12/18/1998 28 135300 4780 i 4 6.50 12/18/1998 28 132190 4670 Average 4730 1 5 6.50 01/15/1999 56 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 3 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831526 Project No.: 43-2333-98 Report Date 12/21/1998 Client: The Beck Group Project: Atto: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS S~NaTR: 3000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST MET}IOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A Lines 3 & B.5 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 11/20/1998 anxc}~ TreE: 5: 13am TIME SAMPLED: 5:55am aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 712 AIR CONTENT (%): 1.2% PLACEMENT LOCATION: See page I Partly cloudy 49 F CONCRETE: 65 F TICKET NO: 1185289 UNIT WEIGHT (p~:f): N/A REPORT OF TESTS ACCUMULATIVE YARDS: 300 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.75 ! 1/27/1998 7 103340 3650 2 2 6.75 11/27/1998 7 106670 3770 Average 3710 2 3 6.75 12/18/1998 28 119910 4240 2 4 6.75 12/18/1998 28 117820 4170 Average 4210 2 5 6.75 01/15/1999 56 0ILL This report is exclusively for ~he use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. Page 2 of 3 CONCRETE COMPRI ;SSIVE STRENGTHr 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831526 Project No.: 43-2333-98 Report Date 12/21/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COmn~CTOR: BECK CONCRETE C~_ASS: 9506 CONCRETE SUeeLmR: TXI PLACEMENT DnT~: 11/20/1998 BATCH TAYto: 6:35qm ~'Ln~rr: 41 TnUE Snrm'LED: 8:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER com)rrioNs: Partly cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (V) - AIR 50 g CONCRETE: 66 V SLtrMP: 6.0" Max TRUCK NO: 712 TICKET NO: 1185421 AIR: N/A Am CONTENT (%): 1.3% UNIT WEIGHT (?el): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 5.5 @ C.5 REPORT OF TESTS ACCUmJLAXIVE YARDS: 300 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 1 6.00 ! 1/27/1998 7 89190 3150 3 2 6.00 11/27/1998 7 901 I0 3190 Average 3170 3 3 6.00 12/18/1998 28 116190 4110 3 4 6.00 !2/18/1998 28 114990 4070 Average 4090 3 5 6.00 01/15/1999 56 FRACTURE TYPE Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: 2:30am (1) The Beck Group (1) Dalcan, Inc. Finished: 5:00pm ~ Eng~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3