Loading...
Verizon-LR 981218REPORT OF REINFORCING STEEL INSPECTION IBC ENGINEERII'~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/18/98 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas, TX 75201-4619 9834076 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. DRAWINGS UTILIZED: LOCATION/ITEMS INSPECTED: TEST METHOD: PROJECT DATA North quadrant driveway (left) at main entrance; Bay 2 and 3 and 4 and 5; paving slab-on-grade; and Level 2 to 3, Columns A/7, B/7, C/7, A/8, B/8, K/9, L/9, M/9, N/9, K/9.3, L/9.3, M/9.3 and N/9.3. Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT I ITEMS INSPECTED CORRECT INCORRECT Pi,ci~ Dra~.~s ~ep~ed X Ba, Le~ ~ S~ X c~u~ r~ed P~.y X Bar Size X Proper Bar Placement X Ties and Spaces X Bar Grade X Propedy Tied X Stirrup Spacing/Type X Rebar Clean X Dowel Bars in Place X Welded Splices Fo~m Clean X Proper Bar Supports X Mechanical Splices Nun~3er of Elam X Lapped Splices X ;'roper Cover X DISCREPANCIES/COMMENTS: No discrepancies noted at the time of inspection. Number, size and spacing as per specifications. Dowel's size and spacing per specifications. Subgrade elevation provides proper thickness at top of concrete. Technician: M. edom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 12:30 pm (1) The Beck Group Stopped: 2:30 pm Engineering, Inc. Eugene Harbour Vice President 309ss This report is exclusively lot the use of tho client indicated above and shall not be reproduced except in full withc~t tho wdtten approval of HBC Engineering, Inc. IN-PLACE DENSITY TESTING- ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/03/1998 Report No.: 9832971 Report Date 12/18/1998 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: In-place density testing. PROJECT DATA CONTRACTOR: BECK Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Re~luirements M/D No. Description Moisture % Density pcf Moisture Density 1 See below 10.0 124.5 Opt. or above 97% 2 See below 10.0 124.5 -1/+3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) Grade Beam Backfill 306 H at 17.5, 1st Lift 1 13.0 121.7 98 307 G.5 at 18.0, 1st Lift 1 12.8 122.0 98 308 E.5 at 18.0, Final Lift 1 12.7 122.4 98 309 G at 18.0, Final Lift 1 12.9 122.0 98 West Parking Area, Subgrade 310 Along Line 5, 175' W from Center Line, W Fire Lane 2 10.4 118.7 95 311 Along Line 5, 75 'W from Center Line, W Fire Lane 2 11.6 121.1 97 Test results on this report meet project specification. M/D No. 1 - Dark reddish brown silty clayey sand w/gravel M/D No. 2 Dark reddish brown silty clayey sand w/gravel Technician: Mike Odom I-'BC En~ Report Distribution: (I) The Beck Group (I) The Beck Group (1) Gromatzky Dupree & Assoc. Eugene~Varbour (i) Brockette Davis Drake, Inc. Vice President (1) The Beck Group This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07CR Page I of 1