Loading...
Coppell Industrial-LR010327 · GEOTECHNICAL AND G J:==J I'-1 I I J:== ENVI~.ONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 31 c/o Champion Partners, Ltd. REPORT DATE: 03-27-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: C. Johnson ATTN: Mr. Kerry Burden PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth I Injection Spacing Injection Pressure Injection Intervals (ft) J (ft) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes J Length of Probes Probe Spacing Rigs (ea) J (ft) (ft) 2, 4 4 12.6 5 Date J Area Injected (sq ft) J Average Pressure (psi) Pass No. 03-16-01 27.600 150 1st. 2nd 03-17-01 27.000 150 2nd Surfactant added at regular intervals: Yes Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps. P.E. Mr. David Meinhardt BW/myw (1) Haynes Whayley Associates Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · -:-L [214] -~50 5600 · =-'× [214] 350 00!9 · GEOTECHNICAL AN~ [~i J:::;J I'--1 I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial. Ltd. REPORT NO. 29 cio Champion Partners. Ltd. REPORT DATE: 03-27-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison. Texas 75001 TECHNICIAN: C. Johnson ATTN: Mr. Kerry Burden PAGE: 1 of 1 On these dates a representative of Reed Engineering Group. Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (ft) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes I Length of Probes Probe Spacing Rigs (ea) ! (fi) (ft) 3 4 12.6 5 Date I Area Injected (sq ft) !,Average Pressure (psi) Pass No. 03-12-01 9.200 150 1 st 03-13-01 18.400 150 1 st 03-14-01 4,600 130 1st 03-15-01 13,800 130 1st Surfactant added at regular intervals: Yes Mail Submitted by: Distribution: (1) Champion Partners. Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson. Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt BW/myw (1) Haynes Whayley Associates Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · -c_ [214] 350 5600 o r-'~ [214] 350 0019