Loading...
Verizon-LR 981217IN-PLACE DENSITY TESTING IBC 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 12/02/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9832970 Project No.: 43-2333-98 Report Date 12/17/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Re*quirements Moisture Density Dk reddish brown silty clayey sand w/gravel 10.0 124.5 FIELD DENSITY TESTS Opt. or above 97% TEST NO TEST LOCATION M/I) MOISTURE DRY DENSITY DENSITY No. (%) (pcf) (% max) Building Area B, Slab-on-Grade 297 At 10/E.5 at Select fill grade 298 At 12/F at Select fill grade Building Area C, Slab-on-Grade 299 At 13/G at Select fill grade 300 At 13/G.5 at Select fill grade 301 At 14/F at Select fill grade 302 At 14.5/G.5 at Select fill grade 303 At 14/E.5 at Select fill grade Building Area C 304 Grade beam backfill, line H at 14, 1st lift 305 Grade beam backfill, line H at 16, Final lift I 11.6 122.3 98 I 12.4 121.8 98 1 12.4 121.9 98 I 13.1 121.6 98 1 10.9 123.2 99 1 13.0 122.2 98 1 12.7 122.0 98 1 11.7 121.9 98 i 11.7 121.1 97 This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 07SS Page I of 2 ~Report No.: 9832970 Test results on this report meet project specification. Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (i) Brockette Davis Drake, Inc. (i) The Beck Group (1) The Beck Group H~ Engineering, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TES£ Date of Service: 11/18/1998 Client No.: 08644025 Report No.: 9831363 Project No.: 43-2333-98 · .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/17/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENa~: 4000 psi @ 28 Days SLUMP: 5.5" AIR: N/A T~ST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/18/1998 BATCH T~E: 2:17pm T~VmSAMPLED: 3:30pm BY: Del Ratliff WEATHER CONDITIONS: Warm partly cloudy light wind TEMPERATURE (F) - AIR 72 F CONCRETE: 77 F TRUCKNO: 815 TICKETNO: 1183873 AIR CONTENT (%): UNIT WEIGHT (pc/'): N PLACEMENT LOCATION: Grade beam on Line E 11.5 to 15.5 SAMPLE LOCATION: 10' S of Line 12/G CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.00 1 2 5.00 I 3 5.00 1 4 5.00 1 5 5.00 DATE TESTED 11/25/1998 11/25/1993 12/16/1998 12/16/1998 REPORT OF TESTS ACCUmmATIV . YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 120250 4250 7 122480 4330 Average 4290 28 173430 6130 28 166810 5900 Average 6020 01/13/1999 56 FRACTURE TYPE Technician time: Technician: Del Ratliff Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockettc Davis Drake, Inc. (!) The Beck Group See Report %9831290 Started: (1) Thc Beck Group (1) Dalcan, Inc. Finished: Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TES£ Date of Service: 11/18/1998 Client No.: 08644025 Report No.: 9831290 Project No.: 43-2333-98 -. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/17/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 5.5" AIR: MA TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Column L/9.7 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 7.00 1 2 7.00 1 3 7.00 1 4 7.00 1 5 7.00 DATE TESTED 11/25/1998 11/25/1998 12/16/1998 12/16/1998 PROJECT DATA CONCRETE CLASS: 9208 PLACEMENT DATE: 11/18/1998 BATCH TIME: 2:02pm TIME SAMPLED: 3:00pm BY: Del Ratliff WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 724 AIR CONTENT (%): N/A PLACEMENT LOCATION: Warm cloudy, light wind 73 F CONCRETE: 78 F TICKET NO: 1183856 UNIT WEIGHT (pc0: N/A Column grade level D/5, D/6, L/9.7, I_J9.3, L/10, F/12 REPORT OF TESTS ACCUMULATIVE YARDS: 7.50 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 7 149300 5280 7 148410 5250 Average 5270 28 180090 6370 28 169790 6000 Average 6190 01/13/1999 56 Technician: Del Ratliff Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 2:00pm (1) The Beck Group (1) Dalcan, Inc. Finished: 4:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1