Loading...
Verizon-LR 981216CONCRETE COM! RIz SIVE. ST NGTH TES'T 8901 Carpenter Fr~vy,, Suite #I0~ Dallas, Texns 7524? Date of Service: Client No.: 11/17/1998 08644025 Report No.: 9831222 Project No.: 43-2333-98 Report Date 12/16/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619' GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: D/6.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 I 5.25 11/24/1998 1 2 5.25 11/24/1998 1 3 5.25 12/15/1998 I 4 5.25 12/15/1998 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/17/1998 BATCH TIME: 2:19pm TIME SAMPLED: 3:30pm BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR CONTENT (%): N/A PLACEMENT LOCATION: Grade beam, building # 1, Columns: D Lines; 4.5 to 6.5 Cloudy 66 F CONCRETE: 71 F TICKET NO: ! 182565 UNIT WEIGHT (pcf}~ N/A REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (Ibs.~rce) ~si) 7 144180 5100 7 147290 5210 Average 5160 28 191950 6790 28 193460 6840 Average 6820 1 5 5.25 01/12/1999 56 FRACTURE TYPE Technician time: See Report #9831209 Technician: Mike Shields Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: (1) The Beck Group (I) Dalcan, Inc. Finished: Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1 CONCRETE COMP1 E ,SIVE STRENGTH TESt Date of Service: 11/17/1998 Client No.: 08644025 Report No.: 9831209 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/16/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACrOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi (~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: South wall of elevator pit CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.00 1 2 5.00 1 3 5.00 1 4 5.00 1 5 5.00 DATE TESTED 11/24/1998 11/24/1998 12/15/1998 12/15/1998 PROJECT DATA CONCRETE CLASS: .8208 PLACEMENT DATE: 11/17/1998 BATCH TIME: 1:58pm TIME SAMPLED: 2:35pm BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 712 AIR CONTENT (%): N/A PLACEMENT LOCATION: Cloudy 66 F CONCRETE: 72 F TICKETNO: 1182531 UNITWEIGHT(peO; N/A Elevator pit walls Bldg I Lobby; Columns A/8, B/8, K/9, L/9, L/9.3, L/9.7, L/10, G/12 & F/12 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 157080 5560 7 149880 5300 Average 5430 28 197280 6980 28 199820 7070 Average 7030 01/12/1999 56 10 FRACTURE TYPE Locations furnished Technician: Mike Shields Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group by contractor. Started: 1:00pm (1) The Beck Group (1) Dalcan, Inc. Finished: 4:00pm Eugene Harbour Vice President This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of 1 'CONCRETE COMP'.:Ig SIVE STRENGTH TES'i' '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/04/1998 08644025 Report No.: 9832771 Project No.: 43-2333-98 Report Date 12/16/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/04/1998 BATCH TIME: 7:20am PLANT: 31 TIME SAMPLED: 8:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi ~ 28 Days TEMPERATURE (F)-AIR 72 ~: CONCRETE: 78 F SLUMP: 6.0" Max TRUCK NO: 418 TICKET NO: 1194100 AIR: N/A AIR CONTENT (e/o): 1.3 UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building slab-on-grade Level I, between A & D, C & D, E & H & between I-6, 6-15. ASTM C-172 ASTM C-39 SAMPLE LOCATION: 7.5 ~ C.5 REPORT OF TESTS ACCUMULATIVE YARDS: 330 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (i nches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.25 12/11/1998 7 104670 3700 ! 2 6.25 12/11/1998 7 106250 3760 Average 3730 1 3 6.25 01/01/1999 28 1 4 6.25 01/01/1999 28 1 5 6.25 01/29/1999 56 Samples obtained from hopper. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 3 CONCRETE COMPRESSIVE STRENGTH TEST '8901- Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/04/1998 08644025 Report No.: 9832771 Project No.: 43-2333-98 Report Date 12/16/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: K.5 ~ 9.3 CYLINDER MARKED SET NO. PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 12/04/1998 BATCH TIME: 9:20am TIME SAMPLED: 10:00am aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 835 AIR CONTENT (%): 1.5 PLACEMENT LOCATION: See page I Partly cloudy 73 g CONCRETE: 79 F TICKET NO: 1194155 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 360 MEASURED MAXIMUM COMPRESSIVE SLUM P DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 12/11/1998 7 97620 3450 2 2 6.00 12/11/1998 7 99240 3510 Average 3480 2 3 6.00 01/01/1999 2§ 2 4 6.00 01/01/1999 28 2 5 6.00 01/29/1999 56 0ILL This report is exclusively £or the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 3 'CONCRETE COMPi, tESSIVE STRENGTH TEST '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/04/1998 08644025 Report No.: 9832771 Project No.: 43-2333-98 Report Date 12/16/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 3 1 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 5.75 3 2 5.75 3 3 5.75 3 4 5.75 3 5 5.75 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 12/04/1998 BATCH TIME: 10:22am TIME SAMPLED: ll:30am BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (F)- AIR 76 F CONCRETE: 81 TRUCKNO: 827 TICKETNO: 1194226 AIR CONTENT (%): 1.4 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page I REPORT OF TESTS DATE TESTED 12/11/1998 12/11/1998 01/01/1999 01/01/1999 AGE (days) 28 28 ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs, force) (psi) 92290 3260 94430 3340 Average 3300 360 FRACTURE TYPE 01/29/1999 56 Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: 6:30am (I) The Beck Group (I) Dalcan, Inc. Finished: 1:30pm H~ Engin~~. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page3 of 3