Loading...
Coppell Industrial-LR010221 GEOTECHNICAL AND ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 25 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 02-21-01 Addison, Texas 75001 TECHNICIAN: Contractor ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Manholes: STA 8+14.69 and 12+74.69 N/A Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. I N/A N/A 4000 Test Results Set I Cy,inder ] Age@ Tote, Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 4136 02-28-01 7 143190 5070 4136 03-21-01 28 148630 5260 4136 03-21-01 28 153400 5430 5350 4136 Hold H Cylinder Data Set I Cylinder I Timeof I Concrete I Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 4136 N/A N/A N/A N/A N/A N/A Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/cg (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 * T-=_ [214] 350 5600 ' FAX [214] 350 0019