Loading...
Verizon-LR 981211CONCRETE COMPRLSSIVE STRENGTH TEc £ Date of Service: Client No.: Client: 11/11/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINF_ERING, INC. .. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9830691 Report Date 12/11/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 1st lift of column C/I PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/11/1998 BATCh{ TIME: 2:01pm TIME SAMPLED: 3: 15pm BY: Greg Dirnock WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 815 AIR CONTENT (%): N/A PLACEMENT LOCATION: Clear 64 F CONCRETE: 72 F TICKET NO: 1180006 UNIT WEIGHT (pcp: N/A Columns BI6, C/6, B/l, CJI, D/l, D/2, D/3, D/4 from ground to 2nd Floor REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 1 1 6.50 11/12/1998 1 MAXIMUM LOAD (lbs. force) 81230 ACCUMULATIVE YARDS: 10 COMPRF_~SIVE STRENGTH FRACTURE (psi) TYPE 2870 1 2 6.50 11/18/1998 7 158510 5610 1 3 6.50 12/09/1998 28 1 4 6.50 12/09/1998 28 1 5 6.50 01/06/1999 56 216180 214460 Average 7650 7580 762O Concrete was placed by bucket and sample was Technician: Greg Dimock Report Distribution: ( I ) The Beck Group ( I ) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: 2:30pm (1) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group obtained from Finished: 4:30pm concrete truck. Eugene Harbour Vice President This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 1 of I CONCRETE COMPRLoSIVE STRENGTH TEL .' Date of Service: 10/14/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 .. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9828001 Report Date 12/11/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTI-I: 3000 psi @ 28 Days SLUM?: 5" Him N/A TEST M~T~OO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier C- 1 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/14/1998 BATCH TIME: 10:19am TmmSHMPLED: ll:30am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 634 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, see Report//9828000 Clear, mild 83 v CONCRETE: 80 F TICKET NO: 1159322 UNIT WEIGHT (pcp: N/A CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.75 I 2 5.75 1 3 5.75 1 4 5.75 1 5 5.75 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 10/21/1998 10/21/1998 11/11/1998 1 i/11/1998 12/09/1998 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 7 100880 3570 7 99230 3510 Average 3540 28 121000 4280 28 112040 3960 Average 4120 56 129040 4560 10 FRACTURE TYPE Technician Time: Technician: Brian Otis Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group See Report #9828000 Started: Finished: (I) Brockette Davis Drake, Inc. (1) Dalcan, Inc. ( I ) The Beck Group Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 1 of I