Loading...
Verizon-LR 981209IN'PLACE DENSITY T STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/01/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9832454 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. cot,rrgncxoR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/l) No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Dark reddish brown silty clayey sand with gravel 10.0 124.5 FIELD DENSITY TESTS Opt. or above 97% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) Area A Building Slab-on-Grade 293 At A.5/6.5, Select fill grade 294 At B/7.5, Select fill grade 295 At C.5/7.0, Select fill grade Area B Grade Beam Backfill 296 Line P between 9.3 and 9.7, 1st lift 297 Line P between 9.3 and 9.7, Final lift 1 12.7 122.3 98 I 13.2 121.7 98 1 12.9 123.4 99 1 13.0 123.1 99 I 13.1 121.4 98 Test results on this report meet project specification. NOTE: Densities #293 through #295 were reconfirmation tests after rain. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 2 Report No.: 9832454 Area of grade beam backfill tested had first lift taken out and replaced correctly with more suitable material for proper moisture content. Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. ( I ) The Beck Group (I) Brockette Davis Drake, Inc. (I) Cooper Excavation (I) The Beck Group ~ E~ng, Inc. Eugene Harbour ,~ Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 2 of 2 IN-PLACE DENSITY IESTING Date of Service: Client No.: Client: 11/27/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9832296 Project No.: 43-2333-98 Project: GTE Shared Services ENGINEERR~, INC. · .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/09/1998 Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Md) No. Maximum Description Moisture % Density pcf Project R~quirements Moisture Density 1 See below for description 10.0 124.5 2 See below for description 12.5 116.5 FIELD DENSITY TESTS Opt. or above 97% Opt. or above 97% TEST MfD MOISTURE NO TEST LOCATION No. (%) DRY DENSITY DENSITY (pc0 (% max) Area B/East Passenger Elevator 289 Wall backfill, east, 6' below top 1 13.9 290 Wall backfill, west, 4' below top 1 12.9 291 Wall backfill, east, 2' below top 2 14.7 292 Wall backfill, west, Final lift 1 13.2 Test results on this report meet project specification. 121.9 98 122.4 98 113.9 98 122.7 99 M/D No. 1 - Dark reddish brown silty clayey sand with gravel M/D No. 2 - Light brown & light gray silty sand with dark gray clay balls Technician: Mike Odom Report Distribution: ( 1 ) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group (I) Brockette Davis Drake, Inc. (1) Cooper Excavation (1) The Beck Group H~ ~ng, Inc. Eugene Harbour ~'~ Vice President This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 07SS Page 1 of 1 IN-PLACE DENSITY I't STING Date of Service: 11/24/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 IBC ENG~.R~, ~C. · '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9831935 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Maximum Description Moisture % Density pcf Project R[quirements Moisture Density 1 Dark reddish brown silty 10.0 124.5 clayey sand w/gravel FIELD DENSITY TESTS Opt. or above 97% TEST M/D MOISTURE NO TEST LOCATION No. (%) DRY DENSITY DENSITY (pct') (% max) Area B 276 Building slab subgrade, A.5 at 7.5 1 10.1 277 Building slab subgrade, B at 6.5 1 10.2 Passenger Elev. Pit Sugrade 278 E side, Bldg Area B, center area, 7' below top 1 11.9 279 W side, Bldg Area B, center W side, 2' below top 1 11.7 280 W side, Bldg Area B, center E side, 1' below top 1 12.0 281 W side, Bldg Area B, center NW side, Final lift I 12.0 282 E side, Bldg Area B, center area, 5'/Final Lift 1 12.2 Test results on this report meet project specification. 123.7 99 123.7 99 123.0 99 121.2 97 122.1 98 121.7 98 121.5 98 Elev. = Elevator Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) Thc Beck Group (I) Brockette Davis Drake, Inc. (I) Cooper Excavation (I) The Beck Group H~ E~:~ng, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 1 IN-PLACE DENSITY TI STING IBC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/23/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9831742 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 MOISTURE DENSITY RELATIONS: M/D No. Field Test Method: Maximum Description Moisture % Density pcf ASTM D-2922 ASTM D-3017 Project Re~luirements Moisture Density 1 See below for description 13.0 115.0 2 See below for description 10.0 124.5 FIELD DENSITY TESTS Opt. or above 97% Opt. or above 97% TEST M/D MOISTURE NO TEST LOCATION No. (%) DRY DENSITY DENSITY (pcf) (% max) Area C, East Side 273 W passenger elevator wall, 6' below top 1 14.9 Area C 274 W passenger elevator wall, 4' below top 2 12.4 Area C, West Side 275 w passenger elevator wall, 4' below top 2 11.6 Test results on this report meet project specification. 111.9 97 120.9 97 121.7 98 M/D No. 1 - Med to it brown silty sand w/some sandstone M/D No. 2 - Dk reddish brown silty clayey sand w/gravel Technician: Mike Odom Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (!) The Beck Group (I) Brockette Davis Drake, Inc. (I) Cooper Excavation (1) The Beck Group ~ E~ring, Inc. Eugene Harbour ~ Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 1 IN-PLACE DENSITY TESTING Date of Service: Client No.: Client: 11/12/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9830819 43-2333-98 IBC ENGINEERING, INC. 8901CarpenterFrwy.,S~te#100 D~las, Tex~75247 Report Date 12/09/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Moisture % Maximum Density pcf Project Re4uirements Moisture Density 1 Dk reddish bm si sa w/gravel 10.0 2 Medium to light brown silty 13.0 sand with some sandstone 124.5 115.0 -1/+3% 95% -1/+3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE NO TEST LOCATION No. (%) DRY DENSITY DENSITY (pc0 (% max) Grade Beam Backfill, Inside 258 Line A, 30' W, Line 8, 3rd Lift 1 11.3 259 Line A, 45'E of Line 1, 1st Lift 2 15.1 260 Line A, 70' E of Line 1, 2nd Lift 1 11.3 Footing 261 At Line E.5-11, Final lift 1 11.4 Test results on this report meet project specification. 118.3 95 110.8 96 118.6 95 118.8 95 Technician: Roy Montgomery Report Distribution: (1) The Beck Group (i) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group (1) Thc Beck Group H~ Eng~nc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07CR Page 1 of 1 IN-PLACE DENSITY TESTING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/11/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9830708 Report Date 12/09/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Maximum Description Moisture % Density pcf Project Requirements Moisture Density Dark reddish brown silty clayey sand 10.0 124.5 FIELD DENSITY TESTS -1/+3% 95% TEST NO M/I} blOISTURE TEST LOCATION No. (%) DRY DENSITY DENSITY (pc0 (% max) 256 257 West Wing Elevator pit wall backfill, 3' S of wall, 1st lift I 12.8 Elevator pit slab, 3' N of S, 5' W of E, 1st lift 1 11.6 Test results on this report meet project specification. 119.8 96 120.4 97 Technician: Roy Montgomery Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group (1) Brockette Davis Drake, Inc. (1) Cooper Excavation (I) The Beck Group ~ E~ring, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07CR Page 1 of 1 IN-PLACE DENSITY TESTING · 8~01 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/10/1998 Report No.: 9830561 Report Date 12/09/1998 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: MID No. Description 1 Medium to light brown silty sand w/some sandstone Max~um Moisture % Density pcf 13.0 115.0 FIELD DENSITY TESTS Project Requirements Moisture Density -1/+3% 95% TEST M/D MOISTURE NO TEST LOCATION No. (%) DRY DENSITY DENSITY (pc0 (% max) W Wing Backfill At Grade Beam 252 35' E of W, 2' outside Line D, 1st lift ! 14.2 253 50' E of W, 2' outside Line D, 2nd lift 1 14.0 W Wing Backfill At Elevator 254 Pit wall, 3' E of E wall, 1st Lift I 15.5 255 Pit wall, 3'S of S wall, 1st Lift 1 14.8 Test results on this report meet project specification. 111.6 97 110.3 96 111.5 97 112.7 98 Technician: Roy Montgomery Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (!) Brockctte Davis Drake, inc. (1) The Beck Group (1) Brockette Davis Drake, Inc. (1) Cooper Excavation (1) The Beck Group I-BC E~ing, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07CR Page 1 of I IN-PLACE DENSITY TESTING Date of Service: Client No.: Client: 11/25/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9832057 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: MID No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Dark reddish brown silty clayey sand with gravel 10.0 124.5 FIELD DENSITY TESTS Opt. or above 97% TEST NO TEST LOCATION Md) MOISTURE DRY DENSITY DENSITY No. (%) (peO (% max) Grade Beam Backfill 283 Line E at line 17, 1st lift 28'4 Line E at line 15, 1st lift 285 Line E at line 13, 1st lift 286 Line E at line 16, 2nd/Final lift 287 Line E at line 14, 2nd/Final lift 288 Line E at line 12, 2nd/Final lift I 13.0 121.7 98 I 11.1 123.1 99 1 12.1 122.0 98 I 12.9 122.0 98 I 12.9 121.8 98 1 13.2 121.8 98 Test results on this report meet project specification. Technician: Mike Odom Report Distribution: (1) The Beck Group (l) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group (I) Brockette Davis Drake, Inc. (1) Cooper Excavation (1) The Beck Group ~ E~ring, Inc. Eugene Harbour ,~ Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 1 CO ICRETE COMPRESSIVE 'STRENGTH TES"]t '~1901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/05/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9830120 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and east compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/05/1998 BATCHTIME: 6:39am PLANT: 31 TIME SAMPLED: 7:30am BY: Terry L. Smith SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool and cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 58 F CONCRETE: 61 SLUMP: 5.0" Max TRUCKNO: 416 TIOrETNO: 1175956 AIR: N/A AIR CONTENT (%): 4.0% UNIT WEIGHT (peg): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: North side of corporate paving ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 90 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 11 / 12/1998 7 124400 4400 1 2 5.50 11/12/1998 7 122550 4330 Average 4370 1 3 5.50 12/03/1998 28 154920 5480 1 4 5.50 12/03/1998 28 156790 5540 Average 5510 Sample location: 130' feet north 180' west of southeast corner , first approach on Corporate. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc. 0iLL Page I of 6 CONCRETE COMPRE sSiVE 'STRENGTH TES'a Date of Service: 11/05/1998 Client No.: 08644025 Report No.: 9830120 Project No.: 43-2333-98 '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/09/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800. Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Sec below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCH TIME: 7:15am TIME SAMPLED: 8:30am BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 724 AIR CONTENT (%): 4.3% PLACEMENT LOCATION: See page I Cool and cloudy 58 F CONCRETE: 60 F TICKET NO: 1176056 UNIT WEIGHT (pcf): N/A REPORT OF TESTS ACCUMULATIVE YARDS: 150 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 11/12/1998 7 122870 4350 2 2 5.00 11/! 2/1998 7 127020 4490 Average 4420 2 3 5.00 12/03/1998 28 160430 5670 2 4 5.00 12/03/1998 28 164480 5820 Average 5750 Sample Location:130' N, 120' west of southeast corner of first approach This report is exclusively for thc use of the client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 6 CONCRETE COMPRESSIVE STRENGTH TESri Date of Service: 11/05/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9830120 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/05/1998 BATCH TIME: 8:12am PLANT: 31 TIME SAMPLED: 9:30am BY: Terry L. Smith SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy and cool STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F}- AIR 56 F CONCRETE: 60 V SLUMP: 5.0" Max TRUCKNO: 816 TICKETNO: 1176151 AIR: N/A AIR CONTENT (%): 5.0% UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.50 11/12/1998 3 2 5.50 11/12/1998 3 3 5.50 12/03/1998 3 4 5.50 12/03/1998 Sample location: 100 feet north, 30 Corporate. REPORT OF TESTS ACCUMULATIVEYAROS: 230 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (Ibs. brce) (psi) TYPE 7 119460 4220 7 123800 4380 Average 4300 28 149410 5280 28 152270 5380 Average 5330 feet west of southeast of first approach on This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 6 CONCRETE COMPRESSIVE STRENGTH TES'it Date of Service: 11/05/1998 Report No.: 9830120 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 '~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/09/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: tXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCHTIME: 10:08am TIME SAMPLED: ll:20am BY: TerryL. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 366 AIR CONTENT (%): 5.1% PLACEMENT LOCATION: See page I mild and cool 39 F CONCRETE: 63 F TICKET NO: 1176362 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE V^R~S: 70 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.00 11/12/1998 7 108390 3830 4 2 5.00 11/12/1998 7 106240 3760 Average 3800 4 3 5.00 12/03/1998 28 143840 5090 4 4 5.00 12/03/1998 28 142130 5030 Average 5060 Sample location: 40' North, 15' east of southeast corner of first approach on Corporate. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 6 CONCRETE COMPRESSIVE STRENGTH TES"/ Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/05/1998 08644025 The Beck Group At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9830120 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCH TIME: 11:43am TIME SAMPLED: 1:00pm BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 905 AIR CONTENT (%): 5.1% PLACEMENT LOCATION: See page I Cloudy and mild 63 F CONCRETE: 61 TICKETNO: 1176521 UNIT WEIGHT (pc0: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. 5 1 5.00 5 2 5.00 5 3 5.00 5 4 5.00 REPORT OF TESTS ACCUMULATIVE YARDS: 150 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) (lbs. force) (psi) TYPE 11/12/1998 7 104830 3710 11/12/1998 7 99510 3520 Average 3620 12/03/1998 28 137190 4850 12/03/1998 28 128070 4530 Average 4690 North, 75' east of southwest corner of first approach on Sample location: 300' Corporate. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 6 CONCRETE COMPRESSIVE STRENGTH TES'I' Date of Service: Client No.: 11/05/1998 08644025 Report No.: 9830120 Project No.: 43-2333-98 '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/09/! 998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCH TIME: 12:32pm TIME SAMPLED: 2:00pm BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (11) - AIR TRUCK NO: 480 AIR CONTENT (%): 5.3% PLACEMENT LOCATION: See page 1 Cool and cloudy 64 F CONCRETE: 60 F TICKET NO: 1176599 UNIT WEIGHT (pcf}: N/A SAMPLE LOCATION: 60' E, 30' s of SE corner of bldg. CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 6 1 6.OO 6 2 6.00 6 3 6.00 6 4 6.00 DATE TESTED 11/12/1998 11/12/1998 12/03/1998 12/03/1998 REPORT OF TESTS ACCUMULATIVE YARNS: 230 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 104470 3690 7 111040 3930 Average 3810 28 156100 5520 28 ! 54400 5460 Average 5490 FRACTURE TYPE Technician: Terry L. Smith Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 6:00am (1) Brockette Davis Drake, inc. (1) Dalcan, Inc. (I) The Beck Group Finished: 4:00pm Eugene Harbour Vice President This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 6 of 6 'CONCRETE COMPRESSIVE STRENGTH TES'i '~901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 11/24/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/24/1998 CATCH TIME: 3:28am TIME SAMPLED: 4:00am BY: Mike Odom WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F)-AIR 62 F CONCRETE: 76 TRUCKNO: 456 TICKETNO: 1187703 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: SW & West parking area, slab-on-grade thru Line 3, placement #1 REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.25 12/01 / 1998 7 90360 3200 1 2 6.25 12/01/1998 7 92280 3260 Average 3230 1 3 6.25 12/22/1998 28 1 4 6.25 12/22/1998 28 I 5 6.25 01/19/1999 56 Sample location: 20' West from centerline firelane inside first driveway, along centerline driveway. This report is exclusively for the use of the client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc. 0ILL Page I of 5 'CONCRETE COMPRESSIVE STRENGTH TESi' "8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 11/24/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 4:55am PLANT: 41 TIME SAMPLED: 5:20am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE(F)-A1R 62 F CONCRETE: 77 F SLUMP: 6.0" Max TRUCK NO: 456 TICKETNO: 1187779 AIR: N/A AIR CONTENT (%): 6.1°/o UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YA~S: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 4.75 12/01/1998 7 108360 3830 2 2 4.75 12/01/1998 7 108090 3820 Average 3830 2 3 4.75 12/22/1998 28 2 4 4.75 12/22/1998 28 FRACTURE TYPE 2 5 4.75 01/19/1999 56 Sample location: Centerline southwest driveway limits, 175' northwest from centerline firelane. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TES'i '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/24/1998 Client No.: 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/09/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Sec below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/24/1998 BATCH TIME: 6:06am TIME SAMPLED: 6:30am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 462 AIR CONTENT (%): 5.6% PLACEMENT LOCATION: See page I Partly cloudy 62 ~: CONCRETE: 74 F TICKET NO: 1187873 UNIT WEIGHT (pct): N/A REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 1 5.25 12/01/1998 7 106170 3750 3 2 5.25 12/01/1998 7 104330 3690 Average 3720 3 3 5.25 12/22/1998 28 3 4 5.25 12/22/1998 28 3 5 5.25 01/19/1999 56 550 FRACTURE TYPE Sample location: 40' South and 10' west from northeast corner paving placement #1. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page3 of 5 'CONCRETE COMPRESSIVE'STRENGTH TES' '8901 Carpenter Fl'wy., Suite gl(N} Dallas, Texas 75247 Date of Service: 11/24/1998 Client No.: 08644025 Report No.: 9831863 Project No.: 43-2333-98 Report Date 12/09/1998 Client: The Beck Group Project: At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCHTIME: 7:31am PLANT: 41 TIME SAMPLED: 8:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (l*)- AIR 62 F CONCRETE: 74 F SLUMP: 6.0" Max TRUCK NO: 453 TICKETNO: 1188049 AIR: N/A AIR CONTENT (%): 5.5°/o UNIT WEIGHT (pet): N/A T~ METHOD: AST1V[ C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.25 12/01/1998 7 115130 4070 4 2 4.25 12/01/1998 7 113980 4030 Average 4050 4 3 4.25 12/22/1998 28 4 4 4.25 12/22/1998 28 4 5 4.25 01/19/1999 56 Sample location: N/S driveway bay area @ centerline, 30' south form north edge. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page4 of 5 CONCRETE COMPRESSIVE 'STRENGTH TESri Date of Service: 11/24/1998 Client No.: 08644025 Report No.: 9831863 Project No.: 43-2333-98 ~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/09/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/24/1998 BATCH TIME: 8:32am TIME SAMPLED: 9:15am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 669 AIR CONTENT (%): 5.1% PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 5 1 4.25 12/01/1998 7 5 2 4.25 12/01/1998 7 5 3 4.25 12/22/1998 28 5 4 4.25 12/22/1998 28 Cloudy 70 F CONCRETE: 76+ F TICKETNO: 1188162 UNITWEIGHT(pe~ N/A 5 5 4.25 01/19/1999 56 MAXIMUM LOAD (lbs. ~rce) 89450 91560 Average ACCUMULATIVE YARDS: 580 COMPRESSIVE STRENGTH (psi) 3160 3240 3200 FRACTURE TYPE Sample location: Parking area bay 2, 100' from west edge, along centerline. Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Duprce & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: 2:30am (1) Brockette Davis Drake, lnc. (1) Dalcan, Inc. (I) The Beck Group Finished: 4:30pm ~ ~-"~ing, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 5 of 5 CONCRETE COMPRESSIVE STRENGTH TES i ii901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/10/1998 08644025 Report No.: 9830515 Project No.: 43-2333-98 Report Date 12/09/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 3-5 AIR: N/A TEST METHOD: ASTM C-143 ASTM C- ! 72 ASTM C-39 SAMPLE LOCATION: Columns 2/B, 2/C, 5/B CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.00 1 2 5.00 1 3 5.00 I 4 5.00 1 5 5.00 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/10/1998 BATCH TIME: 1:26 pm TIME SAMPLED: 2:50 pm BY: Marlo Villanueva WEATHER CONDITIONS: TEMPERATURE (F} - AIR TRUCK NO: 669 AIR CONTENT (%): N/A PLACEMENT LOCATION: Clear 66 F CONCRETE: 75 TICKET NO: 1179097 UNIT WEIGHT (pc0: N/A Ist Level Columns 2/B, 2/C, 3/13, 3/C, 5/[1, 5/C REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/12/1998 2 64550 11/17/1998 7 141140 11/17/1998 7 141220 Average 12/08/1998 28 222260 12/08/1998 28 220010 Average ACCUMULATIVE YARDS: 9 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2280 4990 4990 4990 7860 7780 7820 Technician: Marlo Villanueva Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: 2:00 pm Finished: 4:00 pm (1) Brockette Davis Drake, Inc. (I) Dalcan, Inc. (I) The Beck Group H~ ~ring, Inc. r/r_Eugene Harbour Vice President o This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01CR Page I of 1