Loading...
Verizon-LR 981208CONCRETE COMPRY SI STRENGTH TES ' Date of Service: 11/09/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 · ,8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9830386 Report Date 12/08/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENaTm 4000 psi ~ 28 Days SLUM~: 4.5" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A.3-A.5 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 4.50 1 2 4.50 1 3 4.50 1 4 4.50 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/09/1998 BATCH TIME: l:34pm TIM~ SAMPLED: 2:20pm aY: Shaven Wood WEATHER CONDITIONS: TEMPERATURE (F) - AIR T~UCK NO: 632 Am CO~rr~N~ ('/.): N/A PLACEMENT LOCATION: Cloudy,warm 69 F CONCRETE: 73 F TICKET NO: 1178471 UNIT WEIGHT (pc.O: N/A Grade beam west wing C.5-1 to A-7.5 REPORT OF TESTS DATE AGE LOAD TESTED (days) Obs. force) 11/16/1998 7 137980 11/16/1998 7 135430 Average 12/07/1998 28 182690 12/07/1998 28 185000 Average ACCUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (psi) 4880 4790 4840 6460 6540 6500 TYPE Technician: Shawn Wood Report Distribution: (1) The Beck Group (I) Gromat~.ky Dupree & Assoc. (1) Brockette Davis Drake. Inc. (1) The Beck Group Started: l:00pm Finished: 6:00pm (1) Brockerte Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group ~ tn~ring, Inc. Eugene Harbour "~ Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of 1 CONCRETE COMPRLoSIVE STRENGTH TES. '18901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: 10/13/1998 08644025 Report No.: 9827372 Project No.: 43-2333-98 Report Date 12/08/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Pier D-I CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 1 2 5.50 5.50 5.50 5.50 5.50 1 3 1 4 I 5 Tehnician Time: See Report PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/13/1998 RATCH TIME: 10:16am TIME SAMPLED: 10:54am BY: Brian Otis WEATHER CONDITIONS: Clear and Warm TEMPERATURE (F)-AIR 86 g CONCRETE: 80 F TRUCKNO: 716 TICKETNO: 1158111 AIR CONTENT (%): N/A UNIT WEIGHT (pcO: N/A PLACEMENT LOCATION: Piers, see Report #9827371 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 10/20/1998 7 108280 3830 10/20/1998 7 106970 3780 Average 3810 11/10/1998 28 136370 4820 11/10/1998 28 130490 4610 Average 4720 12/08/1998 56 146800 5190 #9827371. 10 FRACTURE TYPE Technician: Brian Otis Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: Finished: (I) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group H~ ~'~ring, Inc. Eugene Harbour Vice President This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page I of I CONCRETE COMPREbSIVE STRENGTH TES' ~901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: 11/09/1998 08644025 Report No.: 9830433 Project No.: 43-2333-98 Report Date 12/08/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 5 AIR: TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/09/1998 BATCH TIME: 2:22 pm TIME SAMPLED: 3:15 pm BY: Shawn Wood WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 724 AIR CONTENT (%): N/A PLACEMENT LOCATION: Columns B-3, C-3, B-4, C-4 Cloudy and warm 70 F CONCRETE: 74 F TICKET NO: 1178495 UNIT WEIGHT (pcl): N/A SAMPLE LOCATION: Columns B-3, C-3, B-4, C-4 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.00 REPORT OF TESTS DATE TESTED MAXIMUM AGE LOAD (days) (lbs. force) ACCUMULATIVE YARDS: 9.5 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 11/11/1998 2 67920 2400 1 2 5.00 1 3 5.00 1 4 5.00 1 5 5.00 Start time: See Report Technician: Shawn Wood Report Distribution: (1) The Beck Group ( 1 ) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group 11/16/1998 11/16/1998 12/07/1998 12/07/1998 g9830386 7 119120 7 115210 Average 28 157200 28 155020 Average Started: Finished: (I) Brockette Davis Drake, lAC. (I) Dalcan, Inc. (1) The Beck Group 4210 4070 4140 5560 5480 5520 ~ ~ing, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01CR Page I of I CONCRETE COMPRESSIVE STRENGTH TEb £ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/05/1998 08644025 Report No.: 9830122 Project No.: 43-2333-98 Report Date 12/08/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 4-6" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: South wall CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 6.00 1 2 6.00 1 3 6.00 1 4 6.00 DATE TESTED 11/12/1998 11/12/1998 12/03/1998 12/03/1998 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/05/1998 BATCH TIME: 3:34pm TIME SAMPLED: 4:30pm aY: Keith Fowler WEATHER CONDITIONS: Cloudy, cool TEMPERATURE (F) - AIR 55 F CONCRETE: 70 F TRUCKNO: 534 TICKrrNO: 1176818 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Pit walls west wing Section "A" REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 123950 4380 7 119980 4240 Average 4310 28 192650 6810 28 194440 6880 Average 6850 FRACTURE TYPE Technician: Keith Fowler Report Distribution: (1) The Beck Group (1) Gromatzky Duprce & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 4:00pm (1) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Finished: 5:30pm I---BC ~ring, Inc. {r,. Eugene Harbour Vice President This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1