Loading...
Verizon-LR 981207CONCRETE COMPREbSIVE STRENGTH TES'x ENGINEERI~, INC. g901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/06/1998 08644025 Report No.: 9830224 Project No.: 43-2333-98 Report Date 12/07/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 42 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 4.0" Max AIR: N/A VEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 1 1/06/1998 BATCH TIME: 2:41pm TIME SAMPLED: 3:50pm BY: Shawn Wood WEATHER CONDITIONS: TEMPERATURE (F) - A1R TRUCK NO: 457 AIR CONTENT (%): N/A PLACEMENT LOCATION: Grade beam D-5 thru C-I Cloudy, cool 55 F CONCRETE: 63 TICKETNO: 1178021 UNIT WEIGHT(pcO: N/A SAMPLE LOCATION: Grade beam D2-D5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.00 1 2 4.00 1 3 4.00 1 4 4.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/13/1998 7 113190 11/13/1998 7 116940 Average 12/04/1998 28 162170 12/04/1998 28 160130 Average ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 4OOO 4140 4070 5740 5660 5700 10 FRACTURE TYPE Technician: Shawn Wood Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: 3:00pm Finished: 5:00pm m~ (1) Brockette Davis Drake, Inc. (I) Dalcan, Inc. (I) The Beck Group '~ing, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1