Verizon-LR 981202CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831595 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 12/02/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, TeXas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E ~ 12 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.75 I 2 4.75 1 3 4.75 1 4 4.75 I 5 4.75 DATE TESTED 11/27/1998 11/27/1998 12/18/1998 12/18/1998 01/15/1999 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/20/1998 aATCH TIME: 2:26pm TIME SAMPLED: 3:05pm BY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F)- AIR 56 F CONCRETE: 69 F TRUCKNO: 802 TICKETNO: 1186367 AIR CONTENT (%): 1.2% UNIT WEIGHT (pc.f)': N/A PLACEMENT LOCATION: Column Level I-2 ~ E ~ 12, 13, 14, 15 & F (~ 15 REPORT OF TESTS ACCUMULATIVE YARDS: 13.5 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 187010 6610 7 188460 6660 Average 6640 28 28 56 FRACTURE TYPE Technician: Mike Odom Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 3:00pm (I) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Finished: 4:00pm Euger~'Harbour Vice President This report is exclusively for the use ot' the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831603 Project No.: 43-2333-98 Report Date 12/02/1998 Client: The Beck Group Project: At-m: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 I 5.75 1 2 5.75 1 3 5.75 1 4 5.75 I 5 5.75 Sample location: Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/20/1998 BATCH TIME: 2:0 lpm TIME SAMPLED: 2:35pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 474 AIR CONTENT (%): 1.4% PLACEMENT LOCATION: DATE TESTED Cloudy 54 e CONCRETE: 79 F TICKET NO: 1186325 UNIT WEIGHT (pcl~ N/A. Grade beam G9, Gl0 & 12 between 9.3-10, & I0-13, grade beam Linc E between 15.7-18 & Line 18 between E & E.3 11/27/1998 7 11/27/1998 7 REPORT OF TESTS ACCUMULATIVE YARDS: 30 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 151560 5360 150020 5310 Average 5340 12/18/1998 28 12/18/1998 28 01/15/1999 56 Line E, grade beam between 16.5, 17, first Started: 2:00pm Finished: 3:00pm (I) Brockctte Davis Drake, Inc. (I) Dalcan, Inc. (1) The Beck Group lift. Eugene Harbour Vice President This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011.l. PaRe I ofl CONCRETE COMPRESSIVE STRENGTH TES'i Date of Service: Client No.: 10/30/1998 08644025 Report No.: 9829558 Project No.: 43-2333-98 ENGINEERING, INC. 8901 Ca rpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 12/02/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/30/1998. BATCH TIME: 6:13am PLANT: 41 TIME SAMPLED: 6:55am BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Mostly cloudy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F)-AIR 71 V CONCRETE: 79 F SLUMP: 5.0" Max TRUCK NO: 805 TICKET NO: 1171855 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT {pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Firelane running on W side of building tt I from N of building at Y-Split to SE comer of ASTM C- 172 mdg 2 ASTM Co39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 60 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 7.50 11/06/1998 7 94160 3330 1 2 7.50 11/06/1998 7 92040 3250 Average 3290 1 3 7.50 11/27/I 998 28 125560 4440 1 4 7.50 11/27/1998 28 123810 4380 Average 4410 I 5 7.50 12/25/1998 56 Sample location: From NE corner of Bldg 1, west wing drawing Al.01, sampled @ 105' north and 30' east (by center island). This report is exclusively [Br the use of the client iudicated above and shall not be [eproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 5 CONCRETE COMPRE ,$IVE STRENGTH TES,- ENGINF. P_,RING, 1NC. 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/30/1998 08644025 Report No.: 9829558 Project No.: 43-2333-98 Report Date 12/02/1998 Client: The Beck Group Project: Attn: Giilett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STREN(;Tm 3500 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/1998 BATCH TIME: 8:09am TIME SAMPLED: 8:37am BY: Dean Martin WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 457 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Cloudy & windy 74 F CONCRETE: 83 F TICKETNO: 1172062 UN1T WEIGHT(pc0: N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.50 11/06/1998 7 93300 3300 2 2 5.50 11/06/1998 7 94650 3350 Average 3330 2 3 5.50 11/27/1998 28 126410 4470 2 4 5.50 11/27/1998 28 126220 4460 Average 4470 2 5 5.50 12/25/1998 56 Sample location: From NE corner of Btdg 1 west wing drawing Al.01, sampled 60' west and 10' north (by third island from nor~h).Ten gallons of water added. 140 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 5 CONCRETE COMPRg SIVE STRENGTH TES'r 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/30/1998 08644025 Report No.: 9829558 Project No.: 43-2333-98 Report Date 12/02/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppeli, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METtIOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/1998 BATCH TIME: 9:40am TIME SAMPLED: 10:09am BY: Dean Martin WEATHER CONDITIONS: TRUCK NO: 714 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 Cloudy & windy 74 F CONCRETE: 84 TICKET NO: 117223 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 200 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 I 5.00 11/06/1998 7 101360 3580 3 2 5.00 t 1/06/1998 7 94420 3340 Average 3460 3 3 5.00 11/27/1998 28 129660 4590 3 4 5.00 1 !/27/! 998 28 127790 4520 Average 4560 3 5 5.00 12/25/1998 56 FRACTURE TYPE Sample location: From NE corner of Bldg 1 west end drawing Al.01, sampled 125' west and 62' south (between 3rd & 4th island from north).Five gallons of water This report is exclusively for the use of thc client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 5 ..CONCRETE COMPR[, $IVE Date of Service: Client No.: Client: 10/30/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TES ENGINEERING, liNC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report No.: 9829558 Project No.: 43-2333-98 Report Date 12/02/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/1998 BATCH TIME: 11:36am TIME SAMPLED: 12:00pm BY: Dean Martin WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 714 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page ! (See attached sketch) Cloudy & windy 78 F CONCRETE: 85 F TICKET NO: 1172498 UNIT WEIGHT (pet}: N/A SAMPLE LOCATION: 15' S t¥om 7th island from north CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 4.75 4 2 4.75 4 3 4.75 4 4 4.75 4 5 4.75 DATE TESTED 11/06/1998 11/06/1998 11/27/1998 11/27/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 102270 3620 7 101490 3590 Average 3610 28 130100 4600 28 129860 4590 Average 4600 12/25/1998 56 3O0 FRACTURE TYPE Ten gallons of water Technician: Dean Martin Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Bmckette Davis Drake, Inc. (I) The Beck Group added. Started: 5:00am (1) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Finished: 3:00pm H~C Engin~,~. Eugene Frarbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 5 I; ROAD CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 11/20/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 9831526 43-2333-98 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 12/02/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: PLANT: 41 SPEClnCATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along Line 1.5 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 11/20/1998 BATCH TIME: 3:31am TIME SAMPLED: 4:20am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR CONTENT (%): 1.4% PLACEMENT LOCATION: Fair 48 v CONCRETE: 68 F TICKET NO: 1185201 UNIT WEIGHT (pc0:' ' N/A Bide slab-on-grade Area A-between Grid Lines A & D, 1 & 6 REPORT OF TESTS ACCUMULATIVE YARDS: 300 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.50 11/27/1998 7 ! ! 1980 3960 1 2 6.50 11/27/1998 7 109950 3890 Average 3930 ' I 3 6.50 12/18/1998 28 I 4 6.50 12/18/1998 28 1 5 6.50 01/15/1999 56 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of 3 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/20/1998 08644025 Report No.: 9831526 Project No.: 43-2333-98 Report Date 12/02/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRAC'TFO R: BECK CONCRETE CLASS: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/20/1998 BATCHTIME: 5:13am PLANT: 41 TIME SAMPLED: 5:55am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3000 psi ~ 28 Days TEMPERATURE(~)-AIR 49 F CONCRETE: 65 F SLUMP: 6.0" Max TRUCKNO: 712 TICKETNO: 1185289 AIR: N/A AIR CONTENT (%): 1.2°/o UNIT WEIGHT (pcO.: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A Lines 3 & B.5 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXhMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 6.75 11/27/1998 7 103340 3650 2 2 6.75 11/27/1998 7 106670 3770 Average 3710 2 3 6.75 12/18/1998 28 2 4 6.75 12/18/1998 28 2 5 6.75 01/15/1999 56 300 FRACTURE TYPE This report is exclusively for the usc of the client indicated above and shall not be reproduced except in lull without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 11/20/1998 Client No.: 08644025 Report No.: 9831526 Project No.: 43-2333-98 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 12/02/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 l SPECIFICATION REQUIREMENTS STR£NGTH: 3000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 5.s @ c.5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 6.00 3 2 6.00 3 3 6.00 3 4 6.00 3 5 6.00 Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 11/20/1998 BATCH TIME: 6:35qm TIME SAMPLED: 8:00am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 712 AIR CONTENT (%): 1.3% PLACEMENT LOCATION: See page I Partly cloudy 50 F CONCRETE: 66 TICKET NO: 118542 UNIT WEIGHT (pet~ N/A REPORT OF TESTS DATE TESTED 11/27/1998 11/27/1998 12/18/1998 12/18/1998 AGE (days) 28 28 MAXIMUM LOAD (lbs. force) 89190 90110 Average ACCUMULATIVE YARDS: 300 COMPRESSIVE STRENGTH (psi) 3150 3190 3170 FRACTURE TYPE 01/15/1999 56 Started: 2:30am (I) Brockette Davis Drake, Inc. ( I ) Dalcan, Inc. ( 1 ) The Beck Group Finished: 5:00pm H~ Engi In'g, c. Eugene Harbour Vice President This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 oi'3