Loading...
Coppell Industrial-LR010131 GEOTECHNICAI And r~ I~l E~ I I F= ENVIRONHENTal CONSULTANTS REPORT OF LABORATORY COMPACTION TEST Trade Point Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 13 c/o Champion Partners, Ltd. REPORT DATE: 01-31-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 SAMPLE DATE: 01-23-01 ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Curve Optimum Maximum No. Soil Classification Proctor Type Moisture, % Density, pcf 3 Brown & tan clay ASTM D-698 17.0 106.0 p 3.0 ~ 03.0 ~ 2.5 x ~ 13.0 15.0 17.0 19.0 21.0 23.0 13.0 18.0 23.0 Moisture Content (%) Moisture Content (%) Mall Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt JFP/cdl (1) Haynes Whayley Associates, Inc/ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEo'rEcHNICAL AND J~i R I-'1 I I ~ ENVlRON?IE',I-AL CONSULTANTS REPORT OF FIELD DENSITY TESTS Trade Point Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 11 c/o Champion Partners, Ltd. REPORT DATE: 01-31-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: M. Silva ATTN: Mr. Kerry Burden PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. Proctor ASTM I OptimumI Maximum No. Standard Description I Moisture, %1 Density, PCF 1 D-698 Dark brown clay 23.5 91.5 2 D-698 Brown & light brown clay 23.0 94.0 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID Level (%) 83 01-25-01 Storm Line B: STA 12+75 0.0 92.5 23.2 1 98.4 84 Storm Line B: STA 12+90 1.0 90.6 24.5 1 96.3 85 Storm Line A: STA 11+25 0.0 89.3 24.8 1 25.0 86 Storm Line A: STA 12+75 1.0 90.9 23.8 1 96.7 87 Storm Line A: STA 13+50 2.0 91.6 24.0 1 97.4 Comments: Where tested, materials were in compliance with project specifications. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Ronald F. Reed, P.E. Mr, David Meinhardt BW/cg (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR ., SUITE 400 · DALLAS. 'rx 75225 ,,, T.~- [214] 350 5600 "~,X [214] 350 0019 GEOTECHNICAL AND J~j F=IJ r--I U ~ ENVIRONIflENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradeP0int One Bethel Road and Royal Lane Goppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 18 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 01-31-01 Addison, Texas 75001 TECHNICIAN: P. Houston ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Strom drain wing walls: STA 0+00 6/6 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Hanson 9363 4000 Test Results Set I Cylinder I Age@ Total Load J CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 3327 02-07-01 7 183350 6490 3327 02-28-01 28 251390 8900 3327 02-28-01 28 241370 8540 8720 3327 Hold H Cylinder Data Set I Cylinder J Timeof I Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 3327 2.50 4:20PM 53 58 N/A 7327233 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 * T~'- [214] 350 5600 · FAX [214] 350 0019 GEOTECHNiC^L AND G F=~ I-'! I I p ENWRONHEN-ai CONSUL-ANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 18 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 01-31-01 Addison, Texas 75001 TECHNICIAN: P. Houston ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Strom drain wing walls: STA 0+00 6/6 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. I Hanson 9363 4000 Test Results Set CylinderI I Age~ I Tote, Load I Compress,va I Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 3327 02-07-01 7 183350 6490 3327 02-28-01 28 3327 02-28-01 28 3327 Hold H Cylinder Data ISet CYlinder I Timeof I IConcrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 3327 2.50 4:20PM 53 58 N/A 7327233 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) CD.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KENje (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR · SUITE 400 · DALLAS. TX 75235 · t~_ [214] 350 5600 · =.~X [214] 350 0019