Loading...
ST9601-CS 981116SCAVA lid. Partnership November 16, 1998 Robert Caudill Tiseo Paving Company 419 E. Hwy. 80 Mesquite, TX 75150 RE: Wrangler Ddve City of Coppall Dear Robed, As you are aware, we have been shut down numerous times during our construction, due to problems with Southwestern Bell Telephone. As of today, only one conflict has been taken care of. This conflict required that the phone company lower their line at Beltline Road, however our crews were required to repair the road due to the phone company not using the proper compacfion or street repair matedais. Dudng the construction of this project, we have had fo skip all areas where we encountered conflicts with the telephone lines and keep progress on the job moving forward. Due to these conflicts we have had to make concrete collars at our expense in order to be able to complete these areas after the conflicts are cured. As of Fdday, November 13, 1998, we have pulled our crews from the job, until which time we can return and complete our work in the conflicted areas. Therefore any time delays associated with this contract in connection with our work should not be charged against us, since we have no responsibility in forcing Southwestern Bell Telephone to clear the conflicts. If you should need any fudher information, please contact me. Michael John~ Estimator I'.(). Box 270249 · Dallas, Texas 75227 · (214) 3294)045 ° Fax (2t4) 32.94)048