Loading...
Verizon-LR 981125 (2)CONCRETE COMPRESSIVE STRENGTH TE Date of Service: 11/17/1998 Client No.: 08644025 Report No.: 9831222 Project No.: 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 Report Date 11/25/1998 Client: The Beck Group Project: AtT: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, ~erform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 ] SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A iT METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D/6.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.25 11/24/1998 I 2 5.25 11/24/1998 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/17/1998 BATCH TIME: 2:19pm TIME SAMPLED: 3:30pm gv: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) ~ AIR TRUCK NO: 802 AIR CONTENT (%): N/A PLACEMENT LOCATION: Grade beam, building #1, Colmnns: D Lines; 4.5 to 6.5 Cloudy 66 F CONCRETE: 71 TICKETNO: 1182565 UNIT WEIGHT(peO: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 9 MAXIMUM COMPRESSIVE ' AGE LOAD STRENGTH (days) (Ibs.~rce) (psi) 7 144180 5100 7 147290 5210 Average 5160 1 3 5.25 12/15/1998 1 4 5.25 12/15/1998 1 5 5.25 01/12/1999 28 28 FRACTURE TYPE 56 Technician time: See Report #9831209 Technician: Mike Shields Report Distribution: fl) The Beck Group } Gromatzky Dupree & Assoc. gl ) Brockette Davis Drake, Inc. (!) The Beck Group Started: (I) Brockette Davis Drake, inc. (I) Dalcan, inc. (1) The Beck Group Finished: , Ine Vice President This report is exclusively for the use of the client indicated abo~e and shall not be reproduced except in full without the written approval of HDC Engineering, Inc. 0ILL Page I of I CONCRETE COMPRESSIVE Date of Service: Client No.: Client: 11/16/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TESCs Report No.: 9831049 Project No.: 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 11/25/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A/7 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.50 1 2 5.50 I 3 5.50 I 4 5.50 1 5 5.50 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/16/1998 BATCH TIME: 1:52pm TIME SAMPLED: 2:45pm BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 669 AIR CONTE~r (%): N/A PLACEMENT LOCATION: Columns- Level I: A/7, B/7, C/7, & M/9 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/23/1998 11/23/1998 12/14/1998 12/14/1998 Sunny 62 F CONCRETE: 75 F TICKETNO: 1181603 UNIT WEIGHT(pc0: N/A 01/11/1999 7 128550 7 128020 Average 28 28 ACCUMULATIVE YARDS: 9.5 COMPRESSIVE STRENGTH (psi) 4550 4530 4540 FRACTURE TYPE 56 Technician: Mike Shields Report Distribution: (1) The Beck Group (i) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (!) The Beck Group Started: 1:00pm (1) Brockette Davis Drake, Inc. · (I) Dalcan, Inc. (I) The Beck Group Finished: 3:30pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I CONCRETE CO'MPRE SIVE STRENGTH TES? Date of Service: 11/17/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report No.: 9831209 Report Date 11/25/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRtNGTm 5000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METI~OD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/17/1998 BATCHTIME: l:58pm TIME SAMPLED: 2:35pm aY: Mike Shields WEATHER CONDITIONS: Cloudy TEMPERATURE (F)- AIR 66 e CONCRETE: 72 F TRUCK NO: 712 TICKET NO: 1182531 AIR CONTENT (%): N/A UNIT WEIGHT (pet'): N/A PLACEMENT LOCATION: Elevator pit walls Bldg 1 Lobby; Columns A/8, B/8, K/9, [29, [29.3, [29.7, L/10, G/12 & F/12 SAMPLE LOCATION: South wall of elevator pit CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.00 11/24/1998 1 2 5.00 11/24/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE AG E LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 7 157080 5560 7 149880 5300 Average 5430 1 3 5.00 12/15/1998 1 4 5.00 12/15/1998 28 28 1 5 5.00 01/12/1999 56 Locations furnished by contractor. Technician: Mike Shields Report Distribution: (i) The Beck Group (!) Gromatzky Dupree & Assoc. (!) Brockette Davis Drake, Inc. (1) The Beck Group Started: 1 :OOpm (1) Bmckette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Finished: 4:00pm I-~ Engin~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1 - ONCRETE COMPRESSIVE STRENGTH TES ' ENGINEERING, 1]xK3. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 10/27/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9829176 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Report Date 11/25/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/1998 BATCHTIME: 6:43am PLANT: 41 TIME SAMPLED: 7:20am BY: Danny Neu SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (E) - AIR 62 ~ CONCRETE: 71 SLUMP: 5.0" Max TRUCK NO: 456 TICKET NO: 1167981 AIR: 3-5% AIR CONTENT (%): 4.2% UNIT WEIGHT (pct'): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Paving from fire hydrant; 225' north & 10' west ASTM C- 172 4r ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 6.50 11/03/1998 7 89520 1 2 6.50 11/03/1998 7 87370 Average I 3 6.50 11/24/1998 28 132300 I 4 6.50 11/24/1998 28 125860 Average I 5 6.50 12/22/1998 56 ACCUMULATIVE YARDS: 90 COMPRESSIVE STRENGTH (psi) 3170 3090 3130 4680 4450 4570 FRACTURE TYPE Note: Sample taken from truck. This report is exclusively for the use of the client indicated abov9 and shall not be reproduced except in full without the vaittcn approval of HBC Engineering, Inc. 0ILL ,,;; Page 1 of 4 : ,:~; :,:,~ -CONCRETE COMPRESSIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 10/27/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9829176 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Report Date 11/25/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days SLUMP: 5.0" Max AIR: 3-5% TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/27/1998 BATCH TIME: 7:41am TIME SAMPLED: 8:07am BY: Danny Neu WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F)- AIR 64 F CONCRETE: 71 E TRUCKNO: 727 TICKETNO: 1168102 AIR CONTENT (%): 4.1% UNIT WEIGHT (pet): N/A PLACEMENT LOCATION: Paving: Fire lane A, north side of building SAMPLE LOCATION: From fire hydrant, 75' N & 9' W REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 5.75 11/03/1998 7 86170 2 2 5.75 11/03/1998 7 89940 Average 2 3 5.75 11/24/1998 28 108110 2 4 5.75 11/24/1998 28 107140 Average 2 5 5.75 12/22/1998 56 ACCUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH (psi) 3050 3180 3120 3820 3790 3810 FRACTURE TYPE This report is exclusively for the use of the client indicated abov9 and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 4 · CONCRETE COMPRLoSIVE STRENGTH TES ' Date of Service: Client No.: 10/27/1998 08644025 Report No.: 9829176 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/25/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 5.0" Max AIR: 3-5% TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/27/1998 BATCH TIME: 8:29am TIME SAMPLED: 8:59am BY: Danny Neu WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 837 AIR CONTENT (%): 3.9% PLACEMENT LOCATION: Partly cloudy 65 F CONCRETE: 71 TICKET NO: 1168205 UNIT WEIGHT (pcf): N/A Paving: Fire lane A, north side of building SAMPLE LOCATION: From fire hydrant, 20' S & 7' W REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUM P DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 6.00 11/03/1998 7 91840 3 2 6.00 11/03/1998 7 89620 Average 3 3 6.00 11/24/1998 28 135930 3 4 6.00 l 1/24/1998 28 127780 Average 3 5 6.00 12/22/1998 56 ACCUMULATIVE YARDS: 320 COMPRESSIVE STRENGTH (psi) 3250 3170 3210 4810 4520 4670 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the Written approval of HBC Engineering, Inc: 0ILL Page 3 of 4 ? ,,: · cONcRETE COMPR1LoSIVE STRENGTH TES ENGINEF_IU~, 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/27/1998 Client No.: 08644025 Report No.: 9829176 Project No.: 43-2333-98 Report Date 11/25/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/1998 BATCHTIME: 8:46am PLANT: 41 TIME SAMPLED: 9:22am BY: Danny Neu SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi ~ 28 Days TEMPEaATUREff)-AIR 65 ~ CONCRETE: 71 SLUMP: 5.0" Max TRUCKNO: 726 TICKET NO: 1168246 AIR: 3-5% AIR CONTENT (%): 4.1% UNIT WmG~T (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving: Fire lane A, north of building ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From fire hydrant; 40' S & I 12' W CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 1 4 2 4 3 4 4 REPORT OF TESTS ACCUMULATIVE VA}mS: 370 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 6.00 11/03/1998 7 91430 3230 6.00 11/03/1998 7 89620 3170 Average 3200 6.00 11/24/1998 28 104220 3690 6.00 11/24/1998 28 100360 3550 Average 3620 4 5 6.00 12/22/1998 56 F~U~ ~PE Technician: Danny Neu Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: 6:00am Finished: ll:00am (I) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Eugene-l-Iarbour Vice President This report is exclusively for the use of the client indicated abov9 and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 4 CONCRETE COMPRE:SSIVE STRENGTH TE 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/27/1998 Client No.: 08644025 Report No.: 9829199 Project No.: 43-2333-98 Report Date 11/25/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppetl Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTaACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTm 3000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers F-I 1 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 6.25 11/03/1998 1 2 6.25 11/03/1998 1 3 6.25 11/24/1998 1 4 6.25 l 1/24/1998 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENTDATE: 10/27/1998 BATCHTIME: 12:58pm TIME SAMPLED: l:45pm BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 728 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear/warm 78 ~ CONCRETE: 78 TICKET NO: 1168789 UNIT WEIGHT (pcO: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 10 MAX[MUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 93280 3300 7 91030 3220 Average 3260 28 135950 4810 28 133800 4730 Average 4770 1 5 6.25 12/22/1998 56 FRACTURE TYPE Technician time: See Report #9829198 Technician: Brian Otis Report Distribution: (I) The Beck Group (1) Gromatzky Duprec & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: Finished: (I) Brockette Davis Drake, Inc. (I) Dalcan, Inc. (I) The Beck Group Eugene Harbour Vice President This report is exclusively for thc usc of the client indicated abov.e and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.. Page I of 1 r : CONCRETE COMPRL 4SIVE STRENGTH TES ' ENGINEERING, INC. $901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/26/1998 08644025 Report No.: 9829116 Project No.: 43-2333-98 Report Date 11/25/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast COlnpressive strength salnples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi (~ 28 Days SLUMP: 5" Max Aim N/A TEST METltOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers- G-12 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 6.00 I 2 6.00 I 3 6.00 ! 4 6.00 I 5 6.00 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/26/1998 BATCH TIME: 10:55am TIME SAMPLED: I l:40am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 472 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/02/1998 7 101610 11/02/1998 7 99230 Average 11/23/1998 28 131510 11/23/1998 28 127640 Average Clear & mild 76 F CONCRETE: 78 F TICKET NO: 1167220 UNIT WEIGHT (pet): N/A 12/21/1998 56 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3590 3510 3550 4650 4510 4580 10 FRACTURE TYPE Technician time: Technician: Brian Otis Report Distribution: (1) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Bmckette Davis Drake, Inc. (l) The Beck Group See Report %9829115, Sample taken from truck. Started: Finished: (1) Brockcttc Davis Drake, Inc. (1) Dalcan, Inc. (1) The B.eck Group Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. 01LL Page 1 of I