Loading...
Coppell Industrial-LR010913 GEOTECHNICAL AND ~ J~ I'-1 I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 187 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 09-13-01 Addison, Texas 75001 TECHNICIAN: J. Gray ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample I Set Number I Location I Quantity Represented 1 Paving: 85'N, 45'E of S.E. building corner 10/100 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. I Potter 7752 4000 I Test Results Set Cylinder I Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 3002 09-20-01 7 127640 4520 3002 10-11-01 28 3002 10-11-01 28 3002 Hold H Cylinder Data Set I Cylinder Time of Concrete Air I Ticket No. I ID Slump Sample AirTemp. Temp. EntrainmentI Number 1 302 4.75 8:08AM 80 85 N/A 614323 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. ,, SUITE 400 · DALLAS. TX 75235 ,, -EL [214] 350 5600 ,, =,,,x [214] 350 0019