Loading...
Coppell Industrial-LR010911 GEOTECHNICAL AND E:~ F:=I r-1 U ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 186 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 09-11-01 Addison, Texas 75001 TECHNICIAN: W. Eberhardt ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented I 1 Sidewalk: 40'E, 28'S of S.E. building corner 10/30 I Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. I Potter 9339 3000 I Test Results Set I CylinderI Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 2848 09-19-01 7 83350 2950 2848 10-10-01 28 2848 10-10-01 28 2848 Hold H Cylinder Data Set [ Cylinder I Time of I Concrote I Air I T,cket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 2848 6.50 8:15AM 78 80 7.50 614316 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KENje (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 (~EOTECHNICAL ~ND I~ ~ r'-i I I F~ ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial. Ltd. REPORT NO. 174 c/o Champion Partners, Ltd. REPORT DATE: 09-11-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: M. Silva ATTN: Mr. Kerry Burden PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. Proctor ASTM I Optimum Maximum No. Standard Description IMoisture, % Density, PCF 1 D-698 Dark brown clay 23.5 91.5 2 D-698 Brown & light brown clay 23.0 94.0 3 D-698 Brown and tan clay 17.0 106.0 4 D-698 Dark brown clay (lime-treated) 18.5 100.5 5 D-698 Light brown clay (lime-treated) 18.5 99.0 6 D-698 Brown clay (lime-treated) 19.5 99.0 Depth ~ Below Field Field Test Final S.G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID Level (%) 457 08-29-01 Leave-Out: 5'N, 300'W(1) 1.0 100.9 20.8 3 95.1 458 Leave-Out: 5'N. 75'W(1) 1.0 98.1 21.8 3 92.5 459 Leave-Out: 50'N, 2'W(1 ) 1.0 89.1 25.5 1 92.3 460 Leave-Out: 180'N, 2'W(1) 3.0 97.8 20.6 3 92.2 461 Leave-Out: 220'N, 2'W(1) 3.0 99.8 19.9 3 94.1 ~ Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from S.E. building corner. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson. Inc./ Mr. Jason Nunley Original Signed By (1) AECC. Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Ronald F. Reed. P.E. Mr. Kent Penrod BW/cg (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · ---L [214] 350 5600 · ~'',: [214] 350 0019