Loading...
Verizon-LR 981124CONCRETE COMPREoSIVE Date of Service: 10/24/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TES Report No.: 9828983 Project No.: 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/24/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 3 1 SPECIFICATION REQUIREMENTS STRENGT}t: 3000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Pier-F-I 8 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/24/1998 BATCH TIME: 9:28am TIME SAMPLED: 10:35am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 364 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE &GE SET NO. (inches) TESTED (days) 1 1 6.25 10/31/1998 7 1 2 6.25 10/3 !/1998 7 1 3 6.25 11/21/t998 28 1 4 6.25 11/21/1998 28 Clear/mild 70 F CONCRETE: 62 F TICKET NO: 1166392 UNIT WEIGHT (pc0: N/A 1 5 6.25 12/19/1998 56 MAXIMUM LOAD (lbs. force) 90370 91747 Average 133490 128560 Average ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (~i) 3200 3240 3220 4720 4550 4640 FRACTURE TYPE Technician time: See Report %9828982 Sample taken from truck Technician: Brian Otis Report Distribution: (I) Thc Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockctte Davis Drake, Inc. (1) The Beck Group Started: Finished: (!) Brockette Davis Drake, Inc. (1) Dalean, Inc. (1) Thc Beck Group Vice President This report is exclusively for the use of the client indicated above and shall not be reproduoed cxc~pt in full without the written approval of HDC Engineering, Inc. 0ILL Page 1 of I : !: CONCRETE COMPREoSIVE STRENGTH TES'[ Date of Service: Client No.: Client: 10/23/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 752014619 Report No.: Project No.: Project: 9828918 43-2333-98 IBC ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/24/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTaACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STREN(:TtI: 3000 psi @ 28 Days SLUM~: 5.0" Max Am: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Piers-G-16 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/23/1998 BATCH TIME: 10:0 lam TIME SAMPLED: 10:49am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 725 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear/mild 58 F CONCRETE: 69 F TICKET NO: 1165739 UNIT WEIGHT (pcf): N/A CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.00 1 2 5.00 1 3 5.00 1 4 5.00 1 5 5.00 DATE TESTED 10/30/1998 10/30/1998 11/20/1998 11/20/1998 REPORT OF TESTS ACCUma TIW YARDS: 20 MAXIMUM COMPRF_~SIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 106790 3780 7 110340 3900 Average 3840 28 154350 5460 28 159480 5640 Average 5550 12/18/1998 56 Technician time: Technidan: Brian Otis Report Distribution: (1) The Beck Group (1) Gromamky Duprce & Assoc. (1) Bro~kette Davis Drake, Inc. (1) The Beck Group See Report #9828918 Started: Finished: (1) Brocl~te Davis Drake, Inc. (1) Dalcath Inc. (1) Thc Beck Group Vice President This repo~t is exclusively for the use of the client indicated abov.e and shall not be reproduced except in full without the written approval of HBC Eagineexing, Inc. CONCRETE COMPR SSIVE Date of Service: 10/22/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TEo f ENGINEERING, INC. 8901 Carpen(er Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9828794 Project No.: 43-2333-98 Report Date 11/24/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/22/1998 BATCH TIME: 1:3 lpm PLANT: 41 TIME SAMPLED: 2:42pm BY: Brian Otis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear/mild STRENGTH: 3000 psi @ 28 Days TEMPERATURE(D-AIR 79 F CONCRETE: 81 F SLUMP: 5.0" Max. TRUCK NO: 483 TICKET NO: I 165034 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Piers ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers E-18 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.75 10/29/1998 7 80170 I 2 5.75 10/29/1998 7 84820 Average 1 3 5.75 11/19/1998 28 119630 1 4 5.75 11/19/1998 28 117890 Average 1 5 5.75 12/17/1998 56 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 2830 3000 2920 4230 4170 4200 100 FRACTURE TYPE Technician time: Technician: Brian Otis Report Distribution: (!) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Broekette Davis Drake, Inc. (1) The Beck Group See Report #9828793 Started: Finished: (1) Brockctte Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Vice President 01 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of I ·