Verizon-LR 981124CONCRETE COMPREoSIVE
Date of Service: 10/24/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
STRENGTH TES
Report No.: 9828983
Project No.: 43-2333-98
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
11/24/1998
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 3 1
SPECIFICATION REQUIREMENTS
STRENGT}t: 3000 psi ~ 28 Days
SLUMP: 5.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Pier-F-I 8
PROJECT DATA
CONCRETE CLASS: 9506
PLACEMENT DATE: 10/24/1998 BATCH TIME: 9:28am
TIME SAMPLED: 10:35am BY: Brian Otis
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 364
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Piers
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE &GE
SET NO. (inches) TESTED (days)
1 1 6.25 10/31/1998 7
1 2 6.25 10/3 !/1998 7
1 3 6.25 11/21/t998 28
1 4 6.25 11/21/1998 28
Clear/mild
70 F CONCRETE: 62 F
TICKET NO: 1166392
UNIT WEIGHT (pc0: N/A
1 5 6.25 12/19/1998 56
MAXIMUM
LOAD
(lbs. force)
90370
91747
Average
133490
128560
Average
ACCUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH
(~i)
3200
3240
3220
4720
4550
4640
FRACTURE
TYPE
Technician time: See Report %9828982 Sample taken from truck
Technician: Brian Otis
Report Distribution:
(I) Thc Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockctte Davis Drake, Inc.
(1) The Beck Group
Started: Finished:
(!) Brockette Davis Drake, Inc.
(1) Dalean, Inc.
(1) Thc Beck Group
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduoed cxc~pt in full without the written approval of HDC Engineering, Inc.
0ILL
Page 1 of I : !:
CONCRETE COMPREoSIVE STRENGTH TES'[
Date of Service:
Client No.:
Client:
10/23/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 752014619
Report No.:
Project No.:
Project:
9828918
43-2333-98
IBC
ENGINEERII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
11/24/1998
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTaACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STREN(:TtI: 3000 psi @ 28 Days
SLUM~: 5.0" Max
Am: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Piers-G-16
PROJECT DATA
CONCRETE CLASS: 9506
PLACEMENT DATE: 10/23/1998 BATCH TIME: 10:0 lam
TIME SAMPLED: 10:49am BY: Brian Otis
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 725
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Piers
Clear/mild
58 F CONCRETE: 69 F
TICKET NO: 1165739
UNIT WEIGHT (pcf): N/A
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 5.00
1 2 5.00
1 3 5.00
1 4 5.00
1 5 5.00
DATE
TESTED
10/30/1998
10/30/1998
11/20/1998
11/20/1998
REPORT OF TESTS ACCUma TIW YARDS: 20
MAXIMUM COMPRF_~SIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 106790 3780
7 110340 3900
Average 3840
28 154350 5460
28 159480 5640
Average 5550
12/18/1998 56
Technician time:
Technidan: Brian Otis
Report Distribution:
(1) The Beck Group
(1) Gromamky Duprce & Assoc.
(1) Bro~kette Davis Drake, Inc.
(1) The Beck Group
See Report #9828918
Started: Finished:
(1) Brocl~te Davis Drake, Inc.
(1) Dalcath Inc.
(1) Thc Beck Group
Vice President
This repo~t is exclusively for the use of the client indicated abov.e and shall not be reproduced except in full without the written approval of HBC Eagineexing, Inc.
CONCRETE COMPR SSIVE
Date of Service: 10/22/1998
Client No.: 08644025
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
STRENGTH TEo f
ENGINEERING, INC.
8901 Carpen(er Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9828794
Project No.: 43-2333-98
Report Date
11/24/1998
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 9506
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/22/1998 BATCH TIME: 1:3 lpm
PLANT: 41 TIME SAMPLED: 2:42pm BY: Brian Otis
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear/mild
STRENGTH: 3000 psi @ 28 Days TEMPERATURE(D-AIR 79 F CONCRETE: 81 F
SLUMP: 5.0" Max. TRUCK NO: 483 TICKET NO: I 165034
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Piers
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Piers E-18
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 5.75 10/29/1998 7 80170
I 2 5.75 10/29/1998 7 84820
Average
1 3 5.75 11/19/1998 28 119630
1 4 5.75 11/19/1998 28 117890
Average
1 5 5.75 12/17/1998 56
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
2830
3000
2920
4230
4170
4200
100
FRACTURE
TYPE
Technician time:
Technician: Brian Otis
Report Distribution:
(!) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Broekette Davis Drake, Inc.
(1) The Beck Group
See Report #9828793
Started: Finished:
(1) Brockctte Davis Drake, Inc.
(1) Dalcan, Inc.
(1) The Beck Group
Vice President
01
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.