Loading...
Verizon-LR 981119IN-PLACE DENSITY I'v;STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/05/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9830045 Project No.: 43-2333-98 Report Date 11/19/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Dark reddish brown silty clayey sand with gravel 10.0 124.5 FIELD DENSITY TESTS -1/+3% 95% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pcf) (% max) 243 244 245 246 247 248 249 250 251 SW Paving, SW corner of W Wing 120' NW and 70' SW, Final Lift 120' N-W and 120' NW and 120' NW and 240' NW and 240' NW and 240' NW and 60' NE, Final Lift 180' NE, Final Lift 300' SW, Final Lift 60' NE, Final Lift 180' NE, Final Lift 270' NE, Final Lift 300' NW and 120' NE, Final Lift 300' N-W and 240' NE, Final Lift 1 10.9 121.9 98 1 10.7 122.5 98 1 11.0 122.1 98 1 10.7 122.0 98 1 10.8 122.5 98 1 11.2 121.9 98 1 10.9 122.3 98 1 11.0 122.0 98 1 11.2 122.4 98 Test results on this report meet project specification. Technician: Tex King Report Distribution: (1) Th~ Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group (1) Brockette Davis Drake, Inc. (1) Cooper Excavation (1) The Beck Group Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without ~ written approval of HBC Engineering, Inc.