Coppell Industrial-LR010817 GEOTEChNiCAL .-'ND ] I~ I=~ r-'l U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 173
c/o Champion Partners, Ltd. REG PROJECT NO. 7394
15601 Dallas Parkway, Suite 100 SAMPLE DATE: 08-17-01
Addison. Texas 75001 TECHNICIAN: R. Hollings
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 450'N, 100'W of S.W. building corner 20/160
2 Paving: 560'N, 130'W of S.W. building corner 120/160
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Potter 7752 4000
Test Results
Set I Cylinder Age@ Total Load I Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 2135 08-24-01 7 148350 5250
2135 09-14-01 28 162530 5750
2135 09-14-01 28 163350 5780 5770
2135 Hold H
2 2136 08-24-01 7 130940 4630
2136 09-14-01 28 155980 5520
2136 09-14-01 28 155020 5490 5510
2136 Hold H
Cylinder Data
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 2135 5.00 5:10AM 80 84 3.6 613886
2 2136 4.00 6:30AM 82 84 3.1 613896
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden
(1) C.D.Henderson, Inc./ REED ENGINEERING GROUP, INC.
Mr. Jason Nunley
(1) AECC. Inc./Mr. Fran Carter Original Signed By
(1) Haynes Whayley Associates, Inc./
Mr. Kent Penrod Keith Atkins
(1) City of Coppell/Mr. Larry Davis KEA/je
(1) City of Coppell/Mr. Lee Stone
(1) Potter Concrete/Mr. Brant Cox
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
~_424 STUTZ DP,. * SUITE 400 · DALLAS, TX 75235 · .---_ [214] 350 5600 · -'Ax [~.14] 350 0019
GEOTECHNICAL AND
ENVIRONHENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, ltd. REPORT NO. 173
c/o Champion Partners, Ltd. REG PROJECT NO. 7394
15601 Dallas Parkway, Suite 100 SAMPLE DATE: 08-17-01
Addison, Texas 75001 TECHNICIAN: FR. Hollings
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 450'N, 100'W of S.W. building corner 20/160
2 Paving: 560'N, 130'W of S.W. building corner 120/160
Design Information
J Source of Concrete J Mix Identification J Specified Strength p,s,i,
Potter 7752 4000
Test Results
Set CylinderI Age@ Total LoadI Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 2135 08-24-01 7 148350 5250
2135 09-14-01 28
2135 09-14-01 28
2135 Hold H
2 2136 08-24-01 7 130940 4630
2136 09-14-01 28
2136 09-14-01 28
2136 Hold H
Cylinder Data
Set Cylinder J Timeof I Concrete I Air I Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 2135 5.00 5:10AM 80 84 3.6 613886
2 2136 4.00 6:30AM 82 84 3.1 613896
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden
(1) C.D.Henderson, Inc./ REED ENGINEERING GROUP, INC.
Mr. Jason Nunley
(1) AECC, Inc./Mr. Fran Carter Original Signed By
(1) Haynes Whayley Associates, Inc./
Mr. Kent Penrod Keith Atkins
(1) City of Coppell/Mr. Larry Davis KENje
(1) City of Coppell/Mr. Lee Stone
(1) Potter Concrete/Mr. Brent Cox
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 * DALLAS. TX 75235 * -EL [214] 350 5600 · =AX [214] 350 0019