Loading...
Verizon-LR 981118 (2)IN-PLACE DENSITY I' STING Date of Service: 11/02/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9830041 Project No.: 43-2333-98 Project: GTE Shared Services 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/18/1998 Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: MfD No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Dk reddish brown silty clayey sand w/gravel 10.0 124.5 -1/+3 95% FIELD DENSITY TESTS TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) Telephone Trench Backfill 231 W of W Wing, 30' NW of S end, 3rd lift 232 W of W Wing, 40' NW of S end, 2nd lift 233 W of W Wing, 60' NW of S end, 1st lift 234 W of W Wing, 130' NW of S end, 3rd lift 235 W of W Wing, 140' NW of S end, 2nd lift 236 W of W Wing, 150' NW of S end, 1st lift 1 11.9 119.1 96 1 11.0 120.6 97 1 10.7 120.9 97 1 12.2 118.9 96 1 11.1 120.5 97 1 10.6 120.6 97 Test results on this report meet project specification, Technician: Tex King Report Distribution: (1) The Beck Group (1) Gromatzky Duprce & Assoc. '~ Brockette Davis Drake, Inc. · liThe Beck Group (1) Brockette Davis Drake, Inc. (1) Cooper Excavation (I) The Beck Group EUgene Harbour Vice President This ~port is exclusively for Ihe use of Ihe client indicated above.and shall not be reproduced except in full without the written approval of HBC Engineering, lac. O/SS , 5 !~: Page lofl , , ;.'* ~,; .... CONCRETE COMPR ASIVE Date of Service: 10/29/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TE T'£ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9829477 Project No.: 43-2333-98 Report Date 11/18/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Submitted Cylinders. Ali information other than that related to compressive strength is submitted and assumed to be correct. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 5" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETECLASS: PLACEMENT DATE: TIME SAMPLED: N/A 1 10/20/1998 BATCH TIME: N/A BY: Contractor Made WEATHER CONDITIONS: N/A TEMPERATURE (F) - AIR N/A F CONCRETE: N/A F TRUCK NO: N/A TICKET NO: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: Meter vaults at Corporate Drive and Highway 121 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) I 1 DATE TESTED REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) N/A 10/27/1998 7 149140 5270 FRACTURE TYPE 1 2 N/A 11/17/1998 28 1 3 N/A 11/17/1998 28 1 4 N/A 11/17/1998 28 t 5 N/A 11/17/1998 28 Note: Mark 3, 2 where sampled from vault at 121 vault at Corporate Drive. Technician: Greg Dimock Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group & , mark Started: Finished: (1) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (!) The Beck Group 131190 4640 128940 4560 146570 5180 141070 4990 Average 4840 1,4,5, were sampled from Eug~e Harbour Vice President 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. Page 1 of I CONCRETE COMPRI _,SIVE STRENGTH TEAC? ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/10/1998 Client No.: 08644025 Report No.: 9830515 Project No.: 43-2333-98 Report Date 11/18/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 1 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 3-5 AIR: N/A ~.~rST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/10/1998 BATCH TIME: 1:26 pm TIME SAMPLED: 2:50 pm BY: Mario Villanueva WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 66 F CONCRETE: 75 F TRUCKNO: 669 TICKETNO: 1179097 AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: 1st Level Columns 2/B, 2/C, 3/B, 3/C, 5/B, 5/C SAMPLE LOCATION: Columns 2/B, 2/C, 5/B CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/12/1998 2 64550 ACCUMULATIVE YARDS: 9 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2280 1 2 5.00 1 3 5.00 1 4 5.00 1 5 5.00 11/17/1998 7 141140 11/17/1998 7 141220 Average 12/08/1998 28 12/08/1998 28 4990 4990 4990 Technician: Mario Villanueva Report Distribution: (1) The Beck Group "'" ) Gromatzky Dupree & Assoc. ) Brockette Davis Drake, Inc. (1) The Beck Group Started: 2:00 pm Finished: 4:00 pm (1) Brockettc Davis Drake, Inc. (1) Dalcan, Inc. (I) The Beck Group H~ Eng~~]~lc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01CR Page I of I