Verizon-LR 981117CONCRETE'COMPRE ,SIVE STRENGTH TES? 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/09/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9830433 Report Date 11/17/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONT~CTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 5 AIR: TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 pt, nCEMENT DATm 11/09/1998 BATCFt TnVm: 2:22 pm TnVm SnMVLED: 3:15 pm BY: Shawn Wood WEATHER CONDITIONS: Cloudy and warm TEMPERATURE 0*)- Am 70 F CONCRETE: 74 TRUCKNO: 724 TICKET NO: 1178495 AIR CONTENT (%): N/A UNIT WEIGHT (pct'): N/A PLACEMENT LOCATION: Columns B-3, C-3, B-4, C4 SAMPLE LOCATION: CYLINDER MARKED SET NO. Colums B-3, C-3, B-4, C-4 MEASURED SLUMP DATE (inches) TESTED 1 1 5.00 1 2 5.00 1 3 5.00 1 4 5.00 1 5 5.00 11/11/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 9.5 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 2 67920 2400 11/16/1998 11/16/1998 12/07/1998 12/07/1998 7 119120 4210 7 115210 4070 Average 4140 28 28 Start time: See Report Technician: Shawn Wood Report Distribution: (l) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (i) The Beck Group #9830386 Started: Finished: (I) Brockette Davis Drake, Inc. (!) Dalcan, Inc. (1) The Beck Group ~ Eng~ Eugene Harbour Vice President 01CR This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1 CONCRETE' COMPR SIVE STRENGTH TES Date of Service: 11/09/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEF. Rll~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9830386 Report Date 11/17/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Submitted Cylinders. All information other than that related to compressive strength is submitted and assumed to be correct. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 4.5" AIR: N/A ~T METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A.3-A.5 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 4.50 1 2 4.50 1 3 4.50 1 4 4.50 DATE TESTED 11/16/1998 11/16/1998 12/07/1998 12/07/1998 PROJECT DATA CONCRETE CLASS: 9508 P~CEMENT DATE: 11/09/1998 BATC}~ TnVm: 1:34pm TnVmSAMPLED: 2:20pm BY: Shawn Wood WEATHER CONDITIONS: Cloudy,warm TEMPERATURE (F). AIR 69 g CONCREX~: 73 TRUCK NO: 632 TICKET NO: 117847 Am CONTENT (%): N/A uNrr WEIGHT (pcf): N/A PLACEMENT LOCATION: Grade beam west wing C.5-1 to A-7.5 REPORT OF TESTS AGE (days) 7 7 28 28 MAXIMUM LOAD (lbs. ~rce) 137980 135430 Average ACCUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH 4880 4790 4840 Technician: Shawn Wood Report Distribution: (1) The Beck Group (1) Oromatzky Dupree & ASSOC. (I) Brockette Davis Drake, Inc. ~,Tbe Beck Group Started: l:00pm (1) BrOCkette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Finished: 6:00pm Engi Eugene Harbour Vice President 01LL This report is exclusively for the use of the client indicated a~ove and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1 :, 'CONC RETE COMPRL-oSIVE STRENGTH TES ' Date of Service: 11/05/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9830120 Report Date 11/17/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SP~.Cn~ICATION REQUUIEM~NTS STRENGTH: 4000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCH Tram: 6:39am Tmm SAMPLED: 7:30am BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 416 AIR CONTENT (%): 4.0% PLACEMENT LOCATION: Nord~ side of corporate paving Cool and cloudy 58 F CONCRETE: 61 F TICKET NO: 1175956 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCtaCOLATIW YARDS: 90 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.50 11/12/1998 7 124400 4400 1 2 5.50 11/12/1998 7 122550 4330 Average 4370 1 3 5.50 12/03/1998 28 1 4 5.50 12/03/1998 28 FRACTURE TYPE Sample location: 130' feet north 180' west of southeast corner , first approach on Corporate. This report is exclusively for the use of~he client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 'CONCRETE COMPRE 'SIVE STRENGTH TES' ' Date of Service: Client No.: Client: 11/05/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallan, Texas 75247 Report No.: 9830120 Report Date 11/17/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT OA~: 11/05/1998 BATCH TAYto: 7: 15am PLANT: 31 TIME SAMeLEO: 8:30am BY: Terry L. Smith SPECWICATION REQUIREMENTS WEATHER CONDITIONS: Cool and cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATtnRE (F)- AIR 58 F CONCRETE: 60 F SLUMP: 5.0" Max TRUCK NO: 724 TICKET NO: 1176056 AIR: N/A AIR CONTENT (%): 4.3% UNIT WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.00 11/12/1998 7 122870 4350 2 2 5.00 11/12/1998 7 127020 4490 Average 4420 2 3 5.00 12/03/1998 28 2 4 5.00 12/03/1998 28 150 FRACTURE TYPE Sample Location:130' N, 120' west of southeast corner of first approach This report is exclusively for Ibc use of li~e client indicated above and shall not be reproduoed except in full without lhe written approval of HBC Engineering, Inc. 01LL , Page 2 of 6 · 'CONCRETE COMPRI 'oSIVE STRENGTH TE ' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/05/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9830120 Report Date 11/17/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTP. ACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy and cool STRENGTH: 4000 psi @ 28 Days TEMPERATtr~ (F) - AIR 56 F CONCRETE: 60 SLUMP: 5.0" Max TRUCK NO: 816 TICKET NO: 1176151 AIR: N/A AIR CONTENT (%): 5.0% UNIT WEIGHT (per): N/A TEST M~IOO: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCH TIM~: 8:12am TnVmSAMPLED: 9:30am BY: Terry L. Smith REPORT OF TESTS ACCUma YARDS: 230 CvL ) R MEASUREo MSXnam coMpa .ssr MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 1 5.50 11/12/1998 7 116320 4110 3 2 5.50 11/12/1998 7 112020 3960 Average 4040 3 3 5.50 12/03/1998 28 3 4 5.50 12/03/t998 28 Sample location: 100 feet north, 30 feet west of southeast of first approach on Corporate. 0ILL This report is exclusively for the use of the client indicated abov~ and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 6 'CONCRETE COMPRL 'SIVE STRENGTH TES ' Date of Service: 11/05/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9830120 Report Date 11/17/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRAcxoa: BECK CONCRETE SUPPLIER: TXI eLnwr: 31 SPECIFICATION REQUIREMENTS ST~NaTH: 4000 psi @ 28 Days SlXnVm: 5.0" Max Am: N/A TEST ME~IOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCh Tram: 10:08am TnVmSAMeLED: ll:20am BY: TerryL. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TaUCK NO: 366 Am CONTENT (~): 5.1% PLACEMENT LOCATION: See page 1 mild and cool 39 F CONCRETE: 63 g TICKET NO: 1176362 UNIT WEIGHT (pcf): N/A REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 4 1 5.00 11/12/1998 7 4 2 5.00 11/12/1998 7 4 3 5.00 12/03/1998 28 4 4 5.00 12/03/1998 28 ACCUMULATIVE YARDS: 70 MAXIMUM COMPRESSIVE LOAD STRENGTH Obs. force) (psi) 108390 3830 106240 3760 Average 3800 FRACTURE TYPE Sample location: 40' North, 15' east of southeast corner of first approach on Corporate. 01LL This report is exclusively for the ~ of flze client indicated above and shah not be reproduced except in full without the written approval of HBC Eagineering, Inc. Page 4 of 6 CONCRETE COMPRL 'SIVE STRENGTH TES ' Date of Service: 11/05/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9830120 Report Date 11/17/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION RF~UIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 1 1/05/1998 BATCH TIME: 1 1:43am TIME SAMPLED: l:00pm BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 905 AIR CONTENT (%): 5.1% PLACEMENT LOCATION: See page 1 Cloudy and mild 63 F CONCRETE: 61 F TICKET NO: 1176521 UNIT WEIGHT (pc0: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. REPORT OF TESTS acct, Mt nXlW YARDS: 150 MEAStamD mxnatn coMPa, ssiw. SL~P DA~ AGE ~AD S~G~ F~ (~) TES~D (~ys) 0~. force) (psi) ~E 5 1 5.00 11/12/1998 7 104830 3710 5 2 5.00 11/12/1998 7 99510 3520 Average 3620 5 3 5.00 12/03/1998 28 5 4 5.00 12/03/1998 28 Sample location: 300' North, 75' east of southwest corner of first approach on Corporate. This report is exclusively for the use of the client indicated abov~ and shall not be reproduced except in full without the written approval of HBC Eagineering, Inc. 01LL Page 5 of 6 'CONCRETE COMPRE 'SIVE STRENGTH TESTi' Date of Service: 11/05/1998 Client No.: 08644025 Report No.: 9830120 Project No.: 43-2333-98 ENGINEERI]~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/17/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 752014619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS S~m~NGTH: 4000 psi @ 28 Days SLtriv~: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 11/05/1998 BATCH Tram: 12:32pm TnVm SAMPLED: 2:00pm BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 480 Am conteNT (%): 5.3% PLACEMENT LOCATION: See page 1 Cool and cloudy 64 ~' CONCRETE: 60 g TICKET NO: 1176599 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: 60' E, 30' s of SE corner of bldg. CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 6 1 6.00 6 2 6.00 6 3 6.00 6 4 6.00 DATE TESTED 11/12/1998 11/12/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 230 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 104470 3690 7 111040 3930 Average 3810 12/03/1998 12/03/1998 28 28 Technician: Terry L. Smith Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: 6:00am (1) Brockette Davis Drake, Inc. (1) Dalcan, [ne. (i) The Beck Group Finished: 4:00pm I-Ir Eugene Harbour Vice President This report is exclusively for the use of ~he client indicated above, and shall not bc reproduced except in full without the written approval of HBC Pa~nccring, Inc. 0ILL Page 6 of 6 CONCRETE COMPRESSIVE STRENGTH TES Date of Service: 10/19/1998 Client No.: 08644025 Report No.: 9828426 Project No.: 43-2333-98 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 11/17/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/1998 BATCI~ TIME: 8:24am PLANT: 4 1 TIME SAMPLED: 9:10am BY: Brian Otis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy/Mild STRENGTm 3000 psi @ 28 Days TEMPERATURE 03-AIR 58 F CONCRETE: 74 F SLUMP: 5" TRUCK NO: 669 TICI~T NO: 1162963 Am: N/A Am CONTENT (%): N/A uNn' WEIGHT (pct'): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier D-6 REPORT OF TESTS ACCUMULAT YARDS: 20 CYLINDER MEASURED MAXIMUM ~ COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.50 10/26/1998 7 101410 3590 1 2 5.50 10/26/1998 7 100370 3550 1 3 5.50 10/26/1998 7 98300 3480 Average 3540 1 4 5.50 11/16/1998 28 143530 5080 1 5 5.50 12/14/1998 56 Technician time: Technician: Brian Otis Report Distribution: (l) The Beck Croup (l) C-romatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group See Report #9828425 S~r~ed: (1) Brockette Davis Drake, Inc. ( 1 ) Dalcan, Inc. (I) The Beck Group Finished: ~ Engl~ Eugene Harbour Vice President This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engheaing, Inc.