Loading...
Verizon-LR 981116CONCRETE COMPRL SIVE Date of Service: 11/06/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TES ' ENGINEERIND, INC. 8901 Carpenter Frwy. Suite #I00 Dallas. Texas 75247 Report No.: 9830224 Project No.: 43-2333-98 Report Date 11/16/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppel I, Texas Ser~,ices: Obtain samples of fi'esh concrete at the placement locations, perform required field test and cast compressive strength salnples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 42 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 4.0" Max AIR: N/A '-*'ST METltOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/06/1998 BATCH TIME: 2:41 pm TIME SAMPLED: 3:50pm BY: Shawn Wood WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 457 AIR CONTENT (%): N/A PLACEMENT LOCATION: Grade beam D-5 thru C-1 Cloudy, cool 55 .F CONCRETE: 63 F TICKET NO: I 178021 [INIT WEIGltT (pc0: N/A SAMPLE LOCATION: Grade beam D2-D5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 I 4.00 I 2 4.00 I 3 4.00 1 4 4.00 REPORT OF TESTS DATE TESTED 11/13/1998 11/13/1998 12/04/1998 12/04/1998 AGE (days) 28 28 MAXIMUM LOAD (lbs. force) 113190 116940 Average ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 4000 4140 4070 10 FRACTURE TYPE Technician: Shawn Wood Report Distribution: (i) The Beck Group (I) Gromatzky Duprcc & Assoc. (I) Broekcttc Davis Drake, Inc. .. :.q ) Thc Beck Group Started: 3:00pm (I) Brockette Davis Drake, Inc. (1) Dalcan, inc. · ( l ) The Beck Group Finished: 5:00pm Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL : Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TES Date of Service: 11/05/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9830122 Report Date 11/16/1998 43-2333-98 GTE Shared Services Coppell Road & COrporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. co~,rrRAcToa: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECltrICATION REQUIREMENTS STRENGTm 4000 psi @ 28 Days SLCrM?: 4-6" Am: N/A XY~ST ~mT~tOO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: South wall CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 6.00 1 2 6.00 1 3 6.00 1 4 6.00 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/05/1998 BATCH TAYto: 3:34pm TIME SAMPLED: 4:30pm aY: Keith Fowler WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 534 AIR CONTENT (%): N/A PLACEMENT LOCATION: Cloudy, cool 55 F CONCRgTE: 70 F TICKET NO: 1176818 trmT WZmlrr ([~0: N/A Pit walls west wing Section "A" REPORT OF TESTS DATE TESTED 11/12/1998 11/12/1998 12/03/1998 12/03/1998 ACCUMULA~ YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 123950 4380 7 119980 4240 Average 4310 28 28 FRACTURE TYPE Technician: Keith Fowler Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: 4:00pm (1) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Finished: 5:30pm Vice President 01LL This report is exclusively for the use of the client indicated abov.e and shall not be reproduced except in full without the written approval of HBC Eagineering, Inc. , Page 1 of 1 CONCRETE COMPREoSIVE Date of Service: 10/16/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TESq' ENGINEERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report No.: 9828241 Report Date 11/16/1998 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACq'OR: BECK CONCRETE SUPPLIER: TXI PLANT: 42 SPECIFICATION REQUIREMENTS STRENGTIt: 3000 psi ~ 28 Days SLUMP: 5.0" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers- D-4 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I 1 6.0 I 2 6.0 1 3 6.0 I 4 6.0 I 5 6.0 DATE TESTED 10/23/1998 10/23/1998 I 1/13/1998 I 1/13/1998 PROJECT DATA CONCRETE CLASS: N/A PLACEMENT DATE: 10/16/1998 BATClt TIME: 9:14am TmESAMPLED: 10:lSam BY: Brian Otis WEATHER CONDITIONS: Clear/Mild TEMPERATURE (F)-AIR 74 F CONCRETE: 80 F TRUCK NO: 538 TICKET NO: 1162000 AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: Piers REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AG E LOAD STRENGTH (days) (lbs. force) (psi) 7 85200 3010 7 86730 3070 Average 3040 28 117160 4140 28 110290 3900 Average 4020 12/11/1998 56 10 FRACTURE TYPE Technician time: Technician: Brian Otis Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Breckette Davis Drake. Inc. (1) The Beck Group See Report ~9828240 Started: Finished: ( 1 ) Brockette Davis Drake. Inc. (I) Dalcan, Inc. (l) The Beck Group ~-ugene"Harbour Vice President This report is exclusively for the use of the client indicated abov. e and shall not be reproduced except in full without the written approval of HBC Engineering, · 0iLL, . ., .... .. .~.,. .. Pagelofl Date of Service: 10/15/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 1-13C ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dalla% Texas 75247 9828129 Report Date 11/16/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresSive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier A-7 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/15/1998 BATCH TIME: 10:18am TIME SAMPLED: ll:20am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 455 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear, mild 84 ~' CONCRETE: 81 TICKET NO: 1160658 UNIT WEIGHT (pc-O: N/A CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 5.50 5.50 5.50 5.50 1 5 5.50 Technician Time: See Technician: Brian Otis Report Distribution: (1) The Beck C_noup (1) Gromatzky Dupree & Assoc. (1) Breckette Davis Drake, Inc. (!) The Beck Group REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 10/22/1998 7 92450 3270 10/22/i998 7 87350 3090 Average 3180 11/12/1998 28 124260 4390 11/12/1998 28 114490 4050 Average 4220 12/10/1998 56 Report #9828128 Started: Finished: (1) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group 10 FRACTURE TYPE Eugene Harbour Vice President OISS This rep~ is exclusively for thc use of the client indicated abov~ and shall not be reproduced except in full without ~hc written approval of HBC Engineering, Inc. . , :,., , . Pagelofl ~,..,~!,