Loading...
ST9601-CS 981022 TEAGUE NALL AND PERKINS CONSULTING ENGINEERS DATE: 10/22/98 MEMORANDUM TO: Larry Davis, City of Coppell FROM: Mike Jones RE: Wrangler Drive Project (Project No. ST 96-01 ) Pay Estimate No. 4 From Tiseo Paving Company Per your request, we have reviewed Pay Estimate No. 4 from Tiseo Paving Company for their work on the Wrangler Drive project through 09/30/98. It appears that the work completed during this last period (09/01/98 to 09/30/98) includes the installation of the concrete pavers at Freeport Parkway (Item I-8), the adjustment of several existing water valve boxes to grade (Item I1-18), the construction of approximately 178 feet of 6' x 3' box culvert (Item 11-42) and the adjustment/lowering of existing water mains at four (4) locations (Items 11-54, 11-55, 11-58 & 11-61 ). From our discussion yesterday it appears that the only question would be the amount of 6' x 3' box culvert that was complete as of 09/30/98. The 178 feet that Tiseo has requested would have put them about 100 feet west of the first driveway on the south side of Wrangler Ddve. I will defer to yourjudgement since you are much more in touch with the daily progress, but the 178 feet does seem fairly reasonable, based upon my recollection. In light of the above, the pay request appears to be in order. Should have any additional questions, please do not hesitate to give me a call. Thanks. Mike file:',q:~proj-r14~'p196164~ocs~o~Tes~memo,davis,payestimate,no4,w1:xl 915 FLORENCE STREET 2001 W. IRVING BLVD. FORT WORTH, TEXAS 76102 IRVING, TEXAS 75061 817/336-5773 214/254-1765 PAGE 1