Loading...
Verizon-LR 981113CONCRETE COMPRLSSIVE STRENGTH TE ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/14/1998 Client No.: THE BECK Report No.: 9828001 Project No.: 43-2333-98 Report Date 11/13/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXi PLANT: 4 1 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5" AIR: N/A 'rEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Pier C-I CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED ! I 5.75 10/21/1998 I 2 5.75 10/21/1998 I 3 5.75 1 l/11/1998 I 4 5.75 I 1/1 1/1998 I 5 5.75 12/09/1998 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENTDATE: 10/14/1998 BATCHTIME: 10:19am T'MESAMPLED: 1 l:30am aY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 634 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, see Report #9828000 Clear, mild 83 F CONCRETE: 80 F TICKET NO: 1159322 UNIT WEIGHT {pc0: N/A REPORT OF TESTS MAXIMUM AG E LOAD (days) (lbs. force) ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 7 100880 3570 7 99230 3510 Average 3540 28 121000 4280 28 112040 3960 Average 4120 56 10 FRACTURE TYPE Technician Time: See Report ~9828000 Technician: Brian Otis Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: Finished: (I) Brockette Davis Drake, Inc. (I) Dalcan, luc. (I) The Beck Group ng, Inc. Eugene Harbour Vice President This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. ;:, 01SS Page I ofl . .