Loading...
Verizon-LR 981112IN-PLACE DENSITY IESTING Date of Service: Client No.: Client: 11/03/1998 THE BECK The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9829856 Project No.: 43-2333-98 Report Date 11/12/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Maximum Description Moisture % Density pcf Project Requirements Moisture Density 1 Dark reddish brown sitly 10.0 124.5 clayey sand with gravel FIELD DENSITY TESTS -1/+3% 95% TEST MID MOISTURE NO TEST LOCATION No. (%) DRY DENSITY DENSITY (pc0 (% max) Paving, Placement C, Firelane 237 SE approach, 120'N of centerline, Final Lift 1 11.6 238 SE approach, 300'NE left of centerline, Final Lift 1 11.4 239 SE approach,240'NW right of centerline, Final Lift 1 11.7 West Wing Footing 240 at 8.0-A.5, Final Lift 1 10.9 241 at 1.0-A.5, Final Lift 1 11.0 242 at 1.0-C.6, Final Lift 1 10.8 Test results on this report meet project specification. 120.4 97 120.1 97 120.6 97 121.8 98 121.9 98 121.6 98 Technician: Tex King Report Distribution: :'~'.') The Beck Group "::~:::: ,~ Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (!) The Beck Group (!) Brockette Davis Drake, Inc. (!) Cooper Excavation (1) The Beck Group ~ En Inc. Eug~ Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBO Engineering, Inc. 07TMP Page 1 of I . . ,, .