Coppell Industrial-LR010803 GEOTECHNICAL AND ~ F:~ I'-'1 I I F~
ENVIRONMENTAL CONSULTANTS
REPORT OF PIER OBSERVATION
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 127
c/o Champion Partners, Ltd. REPORT DATE: 08-03-01
15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394
Addison, Texas 75001 TECHNICIAN: W. Eberhardt
ATTN: Mr. Kerry Burden PAGE: 1 of 1
CONTRACTOR: C.D. Henderson, Inc.
Wing Wall
I I Pier Diameter Bell Diameter Depth Before Final Depth Concrete
Date Pier No. I (inches) (inches) Bell (feet) of Pier (feet) Length (feet)
07-10-01 U-3 36 48 13.0 13.0 10.7
T-3 36 48 13.6 13.6 11.0
S-3 36 48 13.8 13.8 11.1
R-3 36 48 13.0 13.0 11.5
Building
[ I Pier Diameter Bell Diameter Depth Bef°re IFinal Depth C°ncrete
Date Pier No. (inches) (inches) Bell (feet) of Pier (feet) Length (feet)
A-3 30 66 13.6 13.6 12.0
A.1-2 30 54 14.0 14.1 14.1
A-25 30 66 11.0 11.1 11.0
N-25 30 60 13.0 13.0 12.6
N-20.6 30 54 12.0 12.1 11.1
N-20.4 30 54 11.0 11.0 10.0
N-12.8 30 66 13.0 13.1 12.0
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden REED ENGINEERING GROUP, INC.
(1) C.D.Henderson, Inc./
Mr. Jason Nunley Original Signed By
(1) AECC, Inc./Mr. Fran Carter
(1) Haynes Whayley Associates, Inc./ James F. Phipps, P.E.
Mr. Kent Penrod KA/cg
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · ~*X [214] 350 0019