Loading...
Verizon-LR 981111CONCRETE COMPRL3SIVE STRENGTH TEE ' Date of Service: I0/13/1998 Report No.: 9827372 Client No.: THE BECK Project No.: 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/11/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fi'esh concrete at tile placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 l SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP: 5" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 - SAMPLE LOCATION: Pier D-I CYLINDER MEASURED MARKED SLUMP DATE SET NO. (iuches) TESTED ! I 5.50 10/20/1998 1 2 5.50 10/20/1998 I 3 5.50 11/10/1998 1 4 5.50 11/10/1998 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/13/1998 BATCH TIME: 10:16am TIME SAMPLED: 10:54am nv: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 716 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, see Report #9827371 Clear and Warm 86 F CONCRETE: 80 F TICKET NO: 1158111 UNIT WEIGHT (pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AG E LOAD STRENGTH (days) (lbs. force) (psi) 7 108280 3830 7 106970 3780 Average 3810 28 136370 4820 28 130490 4610 Average 4720 1 5 5.50 12/08/1998 56 10 FRACTURE TYPE Tehnician Time: See Report #9827371. Technician: Brian Otis Report Distribution: (1) Thc Beck Group (I) Gromatzky Dupree & Assoc. (!) Brockette Davis Drake, Inc. (I) The Beck Group Started: Finished: (I) Brockctte Davis Drake, Inc. (I) Dalcan, lnG. (I) The Beck Group H~ Engin~~ Eugene Harbour Vice President This report is cxclusivcly for thc use of the client indicated above and shall not be reproduced except in full without thc written approval ofHBC Engin{wxing, lnG, 01TM Page 1 of I