Loading...
Verizon-LR 981109CONCRETE COMPR TSSIVE STRENGTH TE f Date of Service: 10/29/1998 Report No.: Client No.: THE BECK Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINFY_RI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9829441 Report Date 11/09/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at tl~e placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BEC K CONCRETE SUPPLIER: TX[ PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers L-9 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I 1 6.50 11/05/1998 1 2 6.50 11/05/1998 i 3 6.50 11/26/1998 I 4 6.50 11/26/1998 I 5 6.50 12/24/1998 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/29/1998 BATCH TIME: 9:10am TIME SAMPLED: 10:10am By: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 472 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear & mild 76 F CONCRETE: 78 F TICKET NO: 1170981 UNIT WEIGHT (pcl): m/m REPORT OF TESTS AGE (days) 28 28 MAXIMUM LOAD (lbs. force) 92560 89060 Average ACCUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (psi) 3270 3150 3210 FRACTURE TYPE 56 Technician time: See Report %9829440 Technician: Brian Otis Report Distribution: (I} Thc Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1} The Beck Group Started: Finished: (I) Brockette Davis Drake, Inc. (1) Dalcan, Inc. (1) The Beck Group Eugene Harbour Vice President This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc written approval' of HDC Engineering Inc. ,'CONCRETE COMPRI, oSIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/30/1998 Client No.: THE BECK Report No.: 9829558 Project No.: 43-2333-98 Report Date 11/09/I 998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/30/1998 BATCH TIME: 6: 13am PLANT: 4 1 TIME SAMPLED: 6:55am BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Mostly cloudy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F)- AIR 71 F CONCRETE: 79 F SLUMP: 5.0" Max TRUCKNO: 805 TICKETNO: 1171855 AIR: N/A Air< CONTENT (%): N/A UNIT WEIGHT (pcf}: N/A TEST METItOD: ASTM C- 143 PLACEMENT LOCATION: Firelane running on W side of building #1 from N of building at Y-Split to SE comer of ASTM C- 172 Bldg 2 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 60 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 7.50 11/06/1998 7 94160 3330 I 2 7.50 11/06/1998 7 92040 3250 Average 3290 1 3 7.50 11/27/1998 28 I 4 7.50 11/27/1998 28 I 5 7.50 12/25/1998 56 Sample location: From NE corner of Bldg 1, west wing drawing Al.01, sampled @ 105' north and 30' east (by center island). OILL This report is cxclusivcly for thc usc of thc clicnt indicated abovc and shall not be reproduced cxcept in full without thc written approval of HBC Engineering, lnc; · CONCRETE' COMPREoSIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 Date of Service: 10/30/1998 Client No.: THE BECK Report No.: 9829558 Project No.: 43-2333-98 Report Date 11/09/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONT~a~CTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TX1 PLACEMENT DATE: 10/30/1998 BATCH TIME: 8:09am PLANT: 41 TIME SAMPLED: 8:37am m': Dean Martin SPECIFICATION REQUIREMENTS %VEATHER CONDITIONS: Cloudy & windy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F)o AIR 74 F CONCRETE: 83 SLUMP: 5.0" Max TRUCK NO: ' 457 TICKET NO: 1172062 AIR: N/A Am CONTENT (%): N/A UNIT WEIGItT (pcf): N/A TEST METItOD: ASTM C- 143 I'LACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.50 11/06/1998 7 93300 3300 2 2 5.50 11/06/1998 7 94650 3350 Average 3330 2 3 5.50 11/27/1998 28 2 4 5.50 11/27/1998 28 2 5 5.50 12/25/1998 56 140 FRACTURE TYPE Sample location: From NE corner of Bldg 1 west wing drawing Al.01, sampled 60' west and 10' north (by third island from north).Ten gallons of water added. This repoR is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page2of5 .,: . .'CONCRETE COMPRLoSIVE STRENGTH TE ' ENGINEERING, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/30/1998 Client No.: THE BECK Report No.: 9829558 Project No.: 43-2333-98 Report Date 11/09/1998 Client: The Beck Group Project: Attu: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/t998 BATCH TIME: 9:40am TIME SAMPLED: 10:09am BY: Dean Martin W EATH ER COND[TIONS: TEMPERATURE (F) - AIR TRUCK NO: 714 Alii CONTENT (%): N/A PLACEMENT LOCATION: See page l Cloudy&windy 74 F CONCRETE: 84 F TICKETNO: 1172238 UNIT WEIGltT(pc0: N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULAT[VEYARDS: 200 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 I 5.00 11/06/1998 7 101360 3580 3 2 5.00 11/06/1998 7 94420 3340 Average 3460 3 3 5.00 11/27/1998 28 3 4 5.00 11/27/1998 28 FRACTURE TYPE 3 5 5.00 12/25/1998 56 Sample location: From NE corner of Bldg 1 west end drawing Al.01, sampled 125' west and 62' south (between 3rd & 4th island from north).Five gallons of water This report is exclusively for the use o£the client indicated aboye and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. , 0ILL Page3of5 i · ~ ' i,: . Report No.: 9829558 ,~ H~C added. This report is exclusively for the usc of thc client indicated above and sball not be reproduced except in full without the written approval of HBC Engineering, Inc. Ol LL , Page 4 of 5 . .CONCRETE COMPRLoSIVE Date of Service: Client No.: Client: 10/30/1998 THE BECK The Beck Group Attn: Giltett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TES,,k ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9829558 Project No.: 43-2333-98 Report Date 11/09/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fi'esh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 l SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/30/1998 BATCH TIME: I l:36am TIME SAMPLED: 12:00pm aY: Dean Martin WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 714 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 (See attached sketch) Cloudy&windy 78 F CONCRETE: 85 F TICKETNO: 1172498 [INIT WEIGHT(pcO: N/A SAMPLE LOCATION: 15' S from 7th island from north CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 I 4.75 4 2 4.75 4 3 4.75 4 4 4.75 REPORT OF TESTS MAXIMUM DATE TESTED 11/06/1998 11/06/1998 11/27/1998 11/27/1998 AGE LOAD (days) (Ibs. brce) 7 102270 7 101490 Average 28 28 ACCUMULATIVE YARDS: 300 COMPRESSIVE STRENGTH 3620 3590 3610 FRACTURE TYPE 4 5 4.75 12/25/I 998 56 Ten gallons of water Technician: Dean Martin Report Distribution: (l) The Beck Group (l) Gromatzky Dupree & Assoc. (!) Bmckette Davis Drake, Inc. (1) The Beck Group added. Started: 5:00am (I) Brockctte Davis Drake, Inc. (I) Dalcan, Inc. (I) The Beck Group Finished: 3:00pm %~engin~ Vice President This report is exclusively for thc usc of tile client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 5 ·i~'q ~ ~ ~ ~ "'~ : ~ ~ ~ ~'-~_ . . '-.~x ROAD