Loading...
Coppell Industrial-LR010724 GEOTECHNICAL AND ~ J~J r-'l I I F~ ENVIRONHENTAL CONSULTANTS REPORT OF PIER OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 121 c/o Champion Partners, Ltd. REPORT DATE: 07-24-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: W. Eberhardt ATTN: Mr. Kerry Burden PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. Pier Bell Depth Before Final Depth of Diameter Diameter Bell Pier Date Pier No. (inches) (inches) (feet) (feet) 07-09-01 Q-3 36 48 14.2 14.3 N~7.4 24 48 12.3 12.5 N-6.6 24 48 12.3 12.4 N-6.4 24 48 1 i .5 11.5 N-5.4 24 48 12.7 12.8 N-4.5 24 48 13.4 i 3.6 N-3.6 24 48 i 3.4 13.5 N-3.4 24 48 12.5 12.6 N-2.6 24 48 12.4 12.5 N ~2.4 24 48 13.1 13.1 M.9-2 30 54 12.8 12.8 L.5-1 24 60 15.2 15.2 B-1 24 48 16.0 i6.0 A.8-1 24 48 16.0 16.0 A-2.2 24 48 i4.0 14.1 A-2.6 24 48 14.0 14.3 A-3.4 24 48 14.4 14.8 A-3.6 24 48 13.0 13.0 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Uunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt KNmm (i) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone I 2424 STUTZ DR. ,. SUITE 400 · DALLAS. TX 75235 · ~-EL [214] 350 5600 · .~,x [214] 350 0019 GEOTECHNICAL AND E~ F~I I--! I I p ENvlRONPIENTAL CONSULTANTS REPORT OF PIER OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 109 cio Champion Partners, Ltd. REPORT DATE: 07-24-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: W. Eberhardt A'I-TN: Mr. Kerry Burden PAGE: 1 of 2 CONTRACTOR: C.D. Henderson, Inc. I I Pier Diameter Bell Diameter Depth Bef°re IFinal Depth °f Date Pier No. (inches) (inches) Bell (feet) Pier (feet) 06-21-01 A-7.5 24 48 12.4 12.7 A-8.4 24 48 13.0 13.3 A-8.7 24 48 11.4 12.0 A-9.5 24 48 12.7 13.3 A-10.4 24 48 11.8 12.0 a-11.4 24 48 13.6 14.0 A-8.1 30 66 13.0 13.0 A-8.9 30 66 12.9 13.0 A-9.3 30 54 12.3 13.6 A-9.7 30 66 12.6 13.0 A-10.2 30 66 12.8 13.3 A-10.8 30 54 12.0 12.0 A-11.1 30 66 13.4 13.5 A-11.9 30 66 13.6 13.6 A-12.4 30 54 13.0 13.5 A-12.6 24 48 13.0 13.5 A-12.9 30 66 12.6 13.0 A-13.2 30 66 12.7 13.2 A-13.9 30 66 12.3 12.9 A-14.4 30 54 12.6 13.3 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 10§ REPORT DATE: 07-24-01 REG PROJECT NO. 7394 PAGE: 1 of 2 I IPierDiameterl BellDiameter I Depth Before Final Depth of Date Pier No. (inches) (inches) Bell (feet) Pier (feet) 06-22-01 A-11.7 24 48 14.0 14.2 A-12.5 24 48 13.9 14.0 A-13.1 24 48 14.0 14.0 A-14.7 24 48 13.8 13.8 A-15.5 24 48 13.6 13.7 A-16.5 24 48 13.9 14.0 A-17.3 24 48 13.7 14.0 A-17.5 24 48 13.0 13.5 A-18.5 24 48 12.5 12.6 A-19.3 24 48 13.0 13.0 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt KNcg (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone GEOTECHNICAL AND ~ I::::1 r'"l I I p ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 160 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-24-01 Addison, Texas 75001 TECHNICIAN: A. Cervantes ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Panel # 37 10/350 2 Panel # 45 110/350 3 Panel # 4 210/350 4 Panel # 160 310/350 Design Information t Source of Concrete I Mix Identification J Specified Strength p.s.i. Potter 9337 3000 Test Results Set I CylinderI Age@ Total Load I Compressive Average No. ID Date Tested Test lbs. Strength p,s,i. Strength p.s,i. 1 0948 07-31-01 7 98450 3480 0948 08-21-01 28 118380 4190 0948 08-21-01 28 116030 4110 4150 0948 Hold H 2 0949 07-31-01 7 !06670 3770 0949 08-21-01 28 124110 4390 0949 08-21-01 28 ! 21110 4290 4340 0949 Hold H 3 0950 07-31-01 7 97400 3450 0950 08-21-01 28 113320 4010 0950 08-21-01 28 115510 4090 4050 0950 Hold H 4 0951 07-31-01 7 103780 3670 0951 08-21-01 28 119080 4210 0951 08-21-01 28 117920 4170 4190 0951 Hold H 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · -EL [214] 350 5600 · r^x [214] 350 0019 Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 0948 5.50 5:50AM 82 89 N/A 613228 2 0949 5.50 7:00AM 85 89 N/A 613245 3 0950 5.75 8:40AM 85 90 N/A 613264 4 0951 5.50 9:40AM 86 91 N/A 613279 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt