Loading...
Verizon-LR 981106IN-PLACE DENSITY q_ v_;STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/26/1998 Client No.: THE BECK Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9829768 Project No.: 43-2333-98 Report Date 11/06/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: ~ No. Description Maximum Moisture % Density pcf Project R~quirements Moisture Density Dark reddish brown silty clayey sand w/gravel 10.0 124.5 FIELD DENSITY TESTS -1~3% 95% TEST NO TEST LOCATION MfD MOISTURE DRY DENSITY DENSITY No. (%) (pcO (% max) Storm Line B 166 At station 3+50, 3rd lift 167 At station 3+60, 2nd lift 168 At station 3+70, 1st lift 169 At station 5+10, 3rd lift 170 At station 5+20, 2nd lift 171 At station 5+30, 1st lift Storm Lateral B2 172 At station 0+75, 2nd lift 173 At station 0+80, 1st lift 174 At station 2+50, 2nd lift 175 At station 2+60, 1st lift 1 12.0 120.9 97 1 11.7 120.6 97 1 11.5 121.0 97 I 11.9 121.5 98 1 11.7 121.1 97 1 11.6 121.6 98 1 11.9 119.9 96 1 11.8 120.4 97 1 11.6 120.6 97 1 11.4 120.5 97 07DG This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering, Inc. Page 1 of 2 Report No.: 9829768 TEST ~o _/6 177 178 179 At station 0+60 180 At station 2+00 181 At station 2+10 182 At station 3+50 183 At station 3+60 184 At station 5+00 185 At station 5+10 186 At station 6+50 187 At station 6+60 188 At station 8+10 189 At station 8+20 TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pcf) (% max) At station 3+70, 2nd lift At station 3+80, 1st lift Storm Line C At station 0+50 2nd lift 1st lift 2nd lift 1st lift 2nd lift 1st lift 2nd lift 1st lift 2nd lift 1st lift 2nd lift 1st lift Paving Fire Lane, N Entrance 190 70'S of Coppell Rd, placement A 191 200'SE of Coppell Rd, placement A 192 350'SE of Coppell Rd, placement A 193 500'SE of Coppell Rd, placement A 194 650'E of Coppell Rd, placement A 1 11.6 120.4 97 1 11.5 120.1 97 i 11.3 120.4 97 1 11.2 120.6 97 1 11.6 120.9 97 i 11.3 120.0 96 1 11.7 120.3 97 1 11.5 120.9 97 1 11.4 121.1 97 1 11.1 120.4 97 1 12.0 120.6 97 1 11.7 119.6 96 1 11.9 119.6 96 1 11.6 119.9 96 10.7 121.5 98 10.9 121.9 98 10.9 122.1 98 11.7 121.9 98 10.8 122.3 98 Test results on this report meet project specification. Technician: Tex King Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. qrockette Davis Drake, Sac. the Beck Group (!) Brockette Davis Drake, Inc. (1) Cooper Excavation (1) The Beck Group H~ Engine~ Eugene Harbour Vice President ~ repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07DG Page 2 of 2