Loading...
Verizon-LR 981105CONCRETE COMPRE .$IVE Date of Service: 10/27/1998 Client No.: THE BECK STRENGTH TES ' Report No.: 9829176 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report Date 11/05/1998 GTE Shared Services Coppell Road & Corpo'rate Drive Coppeli, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 I SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F)- AIR SLUMP: 5.0" Max 'FRUCKNO: 456 AIR: 3-5% AIR CONTENT (%): 4.2% "'"' ' METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 ASTM C-39 SAMPLE LOCA'FION: See placement location PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/27/1998 BATCH TIME: 6:43am TIME SAMPLED: 7:20am aY: Danny Neu Partly cloudy 62 E CONCRETE: 71 F TICKETNO: 1167981 UNIT WEIGHT (pcq: N/A Paving from fire hydrant; 225' north & 10' west REPORT OF TESTS ACCUMULATIVE YARDS: 90 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.50 11/03/1998 7 89520 3170 1 2 6.50 11/03/1998 7 87370 3090 Average 3130 I 3 6.50 I 1/24/1998 28 i 4 6.50 11/24/1998 28 ! 5 6.50 12/22/1998 56 Note: Sample taken from truck. This report is exclusively lbr the usc of the client indicated above and shall not be reproduced except in full without the written approval ofHBC En~nc. OILL Page I of 4 CONCRETE Date of Service: COMPR i SIVE STRENGTH TES 10/27/1998 Client No.: THE BECK Report No.: 9829176 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/05/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days SLUMP: 5.0" Max AIR: 3-5% A T METItOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8273 PLACEMENT DATE: 10/27/1998 BATCH TIME: 7:41 am TIME SAMPLED: 8:07am BY: Danny Neu WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F)- AIR 64 F CONCRETE: 71 F TRUCK NO: 727 TICKET NO: 1168102 Alii CONTENT (%): 4.1% UNIT WEIGHT (pcq: N/A PLACEMENT LOCATION: Paving: Fire lane A, north side of building SAMPLE LOCATION: From fire hydrant, 75' N & 9' W REPORT OF TESTS ACCUMULATIVE YARDS: 230 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.75 I 1/03/1998 7 86170 3050 2 2 5.75 11/03/1998 7 89940 3180 Average 3120 2 3 5.75 I 1/24/1998 28 2 4 5.75 I 1/24/1998 28 2 5 5.75 12/22/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 4 CONCRETE COMPRK._,SIVE STRENGTH TE&, ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/27/1998 THE BECK Report No.: 9829176 Project No.: 43-2333-98 Report Date 11/05/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TX1 PLACEMENT DATE: 10/27/1998 BATCHTIME: 8:29am PLANT: 41 T1ME SAMPLED: 8:59am BY: Danny Neu SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 71 F SLUMP: 5.0" Max TRUCK NO: 837 TICKET NO: 1168205 AIR: 3-5% AIR CONTENT (%): 3.9°/'o UNIT WEIGHT (pcl): N/A _A.~ METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving: Fire lane A, north side of building ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From fire hydrant. 20' S & 7' W REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 3 I 6.00 11/03/1998 7 3 2 6.00 I 1/03/1998 7 3 3 6.00 l 1/24/1998 28 3 4 6.00 11/24/1998 28 ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 91840 3250 89620 3170 Average 3210 3 5 6.00 12/22/1998 56 32O FRACTURE TYPE This report is exclusively tbr the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 4 CONCRETE COMPRE .SIVE STRENGTH TES Date of Service: 10/27/1998 Report No.: 9829176 Client No.: THE BECK Project No.: 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/05/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppeil, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/1998 BATCHTIME: 8:46am PLANT: 41 TIME SAMPLED: 9:22am aY: Danny Neu SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 71 F SLUMP: 5.0" Max TRUCK NO: 726 TICKET NO: 1168246 AIR: 3-5% AIR CONTENT (O/o): 4.1% UNIT WEIGHT (pc0,: N/A ~ A METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving: Fire lane A, north of building ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From fire hydrant; 40' S & 112' W REPORT OF TESTS ACCUMULATIVE YARDS: 370 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 4 1 6.00 11/03/1998 7 91430 3230 4 2 6.00 11/03/1998 7 89620 3170 Average 3200 4 3 6.00 11/24/1998 28 4 4 6.00 11/24/1998 28 FRACTURE TYPE 4 5 6.00 12/22/1998 56 Technician: Danny Neu Report Distribution: ( I ) The Beck Group (1) Gromatzky Dupree & Assoc. (l) Brockette Davis Drake, Inc 'a-~.-.The Beck Group Started: 6:00am (I) Brockettc Davis Drake, Inc. (1) Dalcan, Inc. ( I ) The Beck Group Finished: 1 l:00am ~ Enginee~ Eugene Har~6u r Vice President This report is exclusively tbr tim use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4 CONCRETE COMPRt SIVE Date of Service: 10/27/1998 Client No.: THE BECK STRENGTH TES? Report No.: 9829199 Project No.: 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/05/1998 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENaTH: 3000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A -'~'v METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Piers F-11 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 6.25 6.25 I 3 6.25 i 4 6.25 I 5 6.25 Technician time: See DATE TESTED 11/03/1998 11/03/1998 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/27/1998 BATCH TIME: 12:58pm TIME SAMPLED: l:45pm BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 728 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Clear/warm 78 F CONCRETE: 78 TICKETNO: 1168789 UNIT WEIGHT (pcf): N/A REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AG E LOAD STRENGTH (days) (lbs. force) (psi) 7 93280 3300 7 91030 3220 Average 3260 11/24/1998 ! 1/24/1998 12/22/1998 Report #9829198 28 10 FRACTURE TYPE 56 Technician: Brian Otis Report Distribution: (1) The Beck Group ~ Gromatzky Dupree & ,~soc. Brockette Davis Drake, Inc. (I) The Beck Group Started: (1) Brockettc Davis Drake, Inc. (I) Dalcan, Inc. (I) Thc Beck Group Finished: Eugefl~'Harbour Vi~e President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page ! ofl CONCRETE COMPRESSIVE STRENGTH TES ' Date of Service: 10/28/1998 Report No.: Client No.: THE BECK Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9829318 Report Date 11/05/1998 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TX1 PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP: 5.0" Max. AIR: N/A · -' ~ METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers- J-9.3 CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED I I 6.50 1 2 6.50 I 3 6.50 1 4 6.50 I 5 6.50 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/28/1998 BATCH TIME: 10:07am TIME SAMPLED: 11:00am BY: Brian Otis WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Cloudy-mild 70 F CONCRETE: 78 F TICKET NO: 1169737 [JNIT WEIGIIT (pcf): N/A REPORT OF TESTS 11/04/1998 11/04/1998 I 1/25/I 998 I 1/25/1998 AGE (days) 7 7 28 28 MAXIMUM LOAD (lbs. force) 96240 93080 Average ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3400 3290 3350 10 FRACTURE TYPE 12/23/1998 56 Technician time: Sample taken from Technician: Brian Otis Report Distribution: ( I ) The Beck Group A Gromatzky Dupree & ~soc. Brockette Davis Drake, Inc. ( 1 ) The Beck Group See Report %9829317 truck, no water added. Started: (1) Brockette Davis Drake, Inc. (I) Dalcan, Inc. (I) The Beck Group Finished: Vice President This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPRESSIVE STRENGTH TES, Date of Service: 10/26/1998 Client No.: TI~ BECK Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9829116 43-2333-98 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/05/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLLr~W: 5" Max AIR: N/A METHOD: ASTM C- 143 ASTM C-172 ASTM C~39 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 10/26/1998 BATCH TIME: 10:55am TIME SAMPLED: 11:40am BY: Brian Otis WEATHER CONDITIONS: Clear & mild TEMPERATURE (F) - AIR 76 g CONCRETE: 78 g TRUCKNO: 472 TICKET NO: 1167220 Am CONa'ENT (%): N/A uNrr WEIGHT (pc/): N/A PLACEMENT LOCATION: Piers SAMPLE LOCATION: Piers- G-12 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 6.00 11/02/1998 1 2 6.00 11/02/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 101610 3590 7 99230 3510 Average 3550 1 3 6.00 11/23/1998 28 1 4 6.00 11/23/1998 28 10 FRACTURE TYPE 1 5 6.00 12/21/1998 56 Technician time: See Report #9829115, Sample taken from truck. Technician: Brian Otis Report Distribution: '~-.whe Beck Group 'omatzky Dupree & Assoc. ~, ,, ,~rockette Davis Drake, Inc. (1) The Beck Group Started: (1) Brockette Davis Drake, Inc. (I) Dalcan, Inc. (l) The Beck Group Finished: Eugene Harbour Vice President This r~port is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1