Verizon-LR 981103CONCRETE COMPRE2$IVE STRENGTH TES
Date of Service:
Client No.:
Client:
10/24/1998
THE BECK
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 752014619
Report No.:
Project No.:
Project:
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9828983 Report Date
11/03/1998
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 31
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
SLUMP: 5.0" Max
AIR: N/A
METHOD: ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Pier-F- 18
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 6.25 10/31/1998
1 2 6.25 10/31/1998
1 3 6.25 11/21/1998
1 4 6.25 11/21/1998
1 5 6.25 12/19/1998
Technician time: See Report #9828982
PROJECT DATA
CONCRETE CLASS: 9506
PLACEMENT DATE: 10/24/1998 BATC}t TUrin: 9:28am
TIME SAMPLED: 10:35am BY: Brian Otis
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 36~
Am cowricNT (%): N/A
PLACEMENT LOCATION:
Piers
Clear/mild
70 F CONCRETe.: 62 F
TICKET NO: 1166392
UNIT WEIGHT (pcf}: N/A
REPORT OF TESTS ACCUMULATIVE YARDS:
MAX]MUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 90370 3200
7 91747 3240
Average 3220
28
28
56
Sample taken from truck
10
FRACTURE
TYPE
Technician: Brian Otis
Report Distribution:
;..~The Beck Group
romatzky Dupree & A~oc.
x-, Brockette Davis Drake, Inc.
(1) The Beck Group
Started:
(1) Brockette Davis Drake, Inc.
(1) Dalcau, Inc.
(1) The Beck Group
Finished:
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
REPORT OF DRILLEL IER INSPECTION
ENGINEERII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
10/28/1998
THE BECK
Report No.: 9829317
Project No.: 43-2333-98
Report Date
11/03/1998
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC Engineering
jobsite as scheduled for drilled
recorded data.
technician arrived at the above referenced
pier inspection. See attached sheets for
Technician Time: 6:00 am to 7:00 pm
Technician: Brian Otis
R~eport Distribution:
Re Beck Group
3romatzky Dupree & Assoc.
(1) Bmckette Davis Drake, Inc.
(1) The Beck Group
(1) Brockette Davis Drake, Inc.
(I) N.L. Schutte Foundation Drilling
(1) The Beck Group
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TMP Page 1 of 1
REPORT OF DRILLEL IER INSPECTION
ENGRqEERRqG, ~C.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
10/27/1998
THE BECK
Report No.: 9829198
Project No.: 43-2333-98
Report Date
11/03/1998
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC
jobsite as scheduled
recorded data.
Engineering technician arrived at
for drilled pier inspection. See
the above referenced
attached sheet for
Technician Time: 6:00 am to 5:30 pm
Technician: Brian Otis
Report Distribution:
~"rhe Beck Group
,romatzky Dupree & Assoc.
Ct) Brockette Davis Drake, Inc.
(1) The Beck Group
(1) Brockette Davis Drake, Inc.
(1) N.L. Schutte Foundation Drilling
(1) The Beck Group
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TMP Page 1 of I
LL!