Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Coppell Industrial-LR010717
GEOTECHNICAL AND r~ F::J i'-1 I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 112 c/o Champion Partners, Ltd. REPORT DATE: 07-17-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 DATE OBSERVED: 06-26-01 ATTN: Mr. Kerry Burden TECHNICIAN: H. Johnson PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. I Items Observed: I Floor slab from E to G between 11 and 19. J Reference Plans or Notes Used: J Sheet S2.0 J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (i) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt JB/mm (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. ,* SUITE 400 ,J DALLAS. TX 75235 ,J -EL [214] 350 5600 ,, FAX [214] 350 0019 (~EOTECHNICALAI,,;D ~ J:::JJ I'--1 J J F ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 113 c/o Champion Partners, Ltd. REPORT DATE: 07-17-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 DATE OBSERVED: 06-27-01 ATTN: Mr. Kerry Burden TECHNICIAN: H. Johnson PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. I Items Observed: I Floor slab from A to E between 9 and 10. J Reference Plans or Notes Used: J Sheet S2.0 J x JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt JB/mm (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · t-'-L [214] 350 5600 · ;AX [214] 350 0019 GEOTECHNICAL AND ~ R r'"l LJ J~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 111 c/o Champion Partners, Ltd. REPORT DATE: 07-17-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: W. Eberhardt ATTN: Mr. Kerry Burden PAGE: 1 of 2 CONTRACTOR: C.D. Henderson, Inc. [PierDiameterlBellDiameter Depth BeforeI FinalDepth Concrete Date Pier No. (inches) (inches) Bell (feet) of Pier (feet) Length (feet) 06-28-01 N-19.9 30 66 13.0 13.0 11.7 N-19.6 24 48 12.0 12.3 10.6 N-19.4 24 48 12.7 12.7 11.3 N-19.1 30 66 12.8 12,8 11,4 N-18.8 30 54 11.8 11.8 10.2 N-18.5 24 48 12.0 12.0 10.4 N-18.2 30 66 13.9 13.9 12.3 N-17.8 30 66 13.3 13.3 12.0 N-17.6 24 48 12.7 12.7 11.3 N-17.4 24 48 11.5 12.0 1 !.0 N-17 30 66 12.7 12.7 11.2 N-16.7 24 48 13.8 13.8 12.0 N-16.4 24 48 12.5 12.5 10.9 N-16.1 30 66 14.0 14.0 12.2 N-15.8 30 54 12.6 12.7 11.5 N-15.2 30 54 13.3 13.6 12.0 N-14.9 30 66 14.3 14.3 13.0 N-14.4 30 54 14.0 14.0 12.2 N-13.9 30 66 13.8 13.8 12.2 N-13.1 30 66 13.7 14.0 13.0 N-12.4 32 54 13.0 13.0 12.0 N-11.9 30 66 13.0 13.0 12.3 N-11.1 30 66 12.8 13.0 12.2 N-10.8 30 54 12.7 13.0 12.3 N-10.2 30 66 12.7 13.0 12.4 2424 STUTZ DR. ,, SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 111 REPORT DATE: 07-17-01 REG PROJECT NO. 7394 PAGE: 2of2 [ IPier Diameter Bell Diameterl Depth Bef°re Final Depth C°ncrete Date _ Pier No. (inches) (inches) Bell (feet) of Pier (feet) ILength (feet) 06-29-01 N-~15.5 24 48 12.0 12.2 10.7 N-14.6 24 48 14.0 14.0 12.3 N-13.8 24 48 13.0 13.0 12.0 N-13.7 24 48 12.8 13.0 12.0 N-13.5 24 48 12.9 13.0 12.0 N-13.1 24 48 12.3 12.5 9.5 N-12.6 24 48 13.0 13.8 12.8 N-12.5 24 48 13.6 13.7 12.7 N-11.6 24 48 12.5 12.9 11.9 N-11.4 24 48 12.0 12.3 11.3 N-10.5 24 48 12.5 12.8 11.8 N-9.8 30 66 14.0 14.0 13.2 N-9.6 24 48 12.0 12.3 11.3 N-9.3 30 54 13.0 13.0 12.0 N-8.9 30 66 13.0 13.0 12.1 N-8.7 24 48 12.0 12.3 11.3 N-8.4 24 48 12.9 13.3 12.3 N-8.2 30 66 14.0 14.0 13.0 N-7.7 30 66 13.5 13.5 12.5 N-7.2 30 66 13.0 13.0 12.0 N-6.9 30 66 13.0 i3.0 12.0 N-6.1 30 66 12.0 12.0 11.2 N-5.7 30 66 12.5 12.6 !2.0 N-5.1 30 66 12.6 12.6 12.0 N-4.8 30 54 11.4 11.4 10.8 N-4.3 30 54 12.5 12.5 11.7 N-3.9 30 66 12.8 12.8 11.8 N-3 30 66 12.5 12.6 12.4 M-3* 36 48 13.0 13.0 12.0 0-3* 36 48 13.8 14.0 11.6 P-3* 36 48 15.0 15.0 12.0 Note: (*) Indicates screen wall piers. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F, Phipps, P.E. Mr. David Meinhardt JB/mm (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone GEOTECHNICAL AND ! C~ J~J r-'l U F~ ENVIP, ONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 154 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-17-01 Addison, Texas 75001 TECHNICIAN: S. Holliday A'I'TN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number J Location J Quantity Represented 1 Panel # 156 40/360 2 Panel # 145 110/360 3 Panel # 141 220/360 4 Panel # SP3 310/360 Design Information J Source of Concrete J Mix Identification J Specified Strength p.s.i. Potter 9337 3000 Test Results Set I CylinderI Age@ Total Load [ CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 0616 07-24-01 7 97190 3440 0616 08-14-01 28 118610 4200 0616 08-14-01 28 124360 4400 4300 0616 Hold H 2 0617 07-24-01 7 98920 3500 0617 08-14-01 28 122310 4330 0617 08-14-01 28 122740 4340 4340 0617 Hold H 3 0618 07-24-01 7 108080 3820 0618 08-14-01 28 131420 4650 0618 08-14-01 28 131890 4670 4660 0618 Hold H 4 0619 07-24-01 7 103640 3670 0619 08-14-01 28 133280 4720 0619 08-14-01 28 134990 4780 4750 0619 Hold H 2424 STUTZ DP,. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · =AX [214] 350 0019 Cylinder Data Set I Cylinder I Timeof I ConcreteI Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 0616 5.25 5:20AM 83 85 N/A 613018 2 0617 5.00 6:35AM 82 86 N/A 613026 3 0618 5.00 7:30AM 83 87 N/A 613037 4 0619 5.25 9:05AM 83 87 N/A 613048 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt GEOTECHNICALAND ~ F~I D I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 154 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-17-01 Addison, Texas 75001 TECHNICIAN: S. Holliday ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Panel # 156 40/360 2 Panel # 145 110/360 3 Panel # 141 220/360 4 Panel # SP3 310/360 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set I CylinderI Age@ Total Load CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. I 0616 07-24-01 7 97190 3440 0616 08-14-01 28 0616 08-14-01 28 0616 Hold H 2 0617 07-24-01 7 98920 3500 0617 08-14-01 28 0617 08-14-01 28 0617 Hold H 3 0618 07-24-01 7 108080 3820 0618 08-14-01 28 0618 08-14-01 28 0618 Hold H 4 0619 07-24-01 7 103640 3670 0619 08-14-01 28 0619 08-14-01 28 0619 Hold H 2424 STUTZ DR. * SUITE 400 · DALLAS. TX 75235 · -EL [214] 350 5600 · =^x [214] 350 0019 Cylinder Data Set I CylinderI Timeof I Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number I 0616 5.25 5:20AM 83 85 N/A 613018 2 0617 5.00 6:35AM 82 86 N/A 613026 3 0618 5.00 7:30AM 83 87 N/A 613037 4 0619 5.25 9:05AM 83 87 N/A 613048 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt