Loading...
Coppell Industrial-LR010716 GEOTECHNICAL AND ~ F~J I'-1 U I~~ ENVIRONI~IENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 149 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-16-01 Addison, Texas 75001 TECHNICIAN: S. Holliday ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Iset Number I L°cati°nl Pier Cap: A-1.5 I Quantity Represented20/40 I Design Information J Source of Concrete J Mix Identification J Specified Strength p.s.i. J I Potter 9337 3000 I Test Results Set I CylinderI Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 0620 07-23-01 7 109430 3870 0620 08-13-01 28 0620 08-13-01 28 0620 Hold H Cylinder Data SetI Cylinder I Time of I Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number I 0620 4.50 3:30PM 97 92 N/A 613010 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEAJje (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brant Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [2J4] 350 5600 · FAX [2J4] 350 00J9 GEOTECHNICAL AND ~ J:::J r'l U ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 149 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-16-01 Addison, Texas 75001 TECHNICIAN: S. Holliday ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample I Set Number I Location I QuantityRepresented I 1 Pier Cap: A-1.5 20/40 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. I Potter 9337 3000 I Test Results Set Cylinder Age @ Total Load Compressive I Average No. ID Date Tested Test lbs. Strength p.s.i.I Strength p.s.i. 1 0620 07-23-01 7 109430 3870 0620 08-13-01 28 131580 4660 0620 08-13-01 28 136760 4840 4750 0620 Hold H Cylinder Data Set I Cylinder I Timeof I Concrete I Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 0620 4.50 3:30PM 97 92 N/A 613010 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brant Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 * TEL [214] 350 5600 ' FAX [214] 350 0019