Coppell Industrial-LR010710 (~EOTECHNICAL AND ~ R O U F~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 142
c/o Champion Partners, Ltd. REG PROJECT NO. 7394
15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-10-01
Addison, Texas 75001 TECHNICIAN: W. Eberhardt
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Piers: A-25 and N-25 30/30
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Potter 9337 3000
Test Results
Set I Cy,inderI I Age@ I Tota, Load J Compressive I Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 0334 07-17-01 7 100360 3550
0334 08-07-01 28
0334 08-07-01 28
Cylinder Data
SetI Cylinder Timeof ] J Concrete Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 0334 6.00 2:30PM 101 93 N/A 612804
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden REED ENGINEERING GROUP, INC.
(1) C.D.Henderson, Inc./
Mr. Jason Nunley Original Signed By
(1) AECC, Inc./Mr. Fran Carter
(1) Haynes Whayley Associates, Inc./ Keith Atkins
Mr. Kent Penrod KEA/je
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Potter Concrete/Mr. Brant Cox
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · -~_: [214] 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 143
c/o Champion Partners, Ltd. REG PROJECT NO. 7394
15601 Dallas Parkway, Suite 100 SAMPLE DATE: 07-10-01
Addison, Texas 75001 TECHNICIAN: H. Johnson
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
I Floor slab: E to F and 10 to 11 10/300
2 Floor slab: F to G and 9 to 10 110/300
3 Floor slab: G to H and 9 to 10 210/300
Design Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
I
Potter 9349 4000
Test Results
Set [Cylinder Age@ TotalLoad [ CompressiveI Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 0347 07-17-01 7 86900 3080
0347 08-07-01 28
0347 08-07-01 28
2 0348 07-17-01 7 91370 3230
0348 08-07-01 28
0348 08-07-01 28
3 0349 07-17-01 7 92260 3260
0349 08-07-01 28
0349 08-07-01 28
Cylinder Data
Set I Cylinder [ Timeof I Concrete Air I Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 0347 5.00 7:35AM 79 83 N/A 612772
2 0348 5.50 8:30AM 81 85 N/A 612782
3 0349 6.00 9:40AM 81 86 N/A 612792
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden
(1) C.D.Henderson, Inc./ REED ENGINEERING GROUP, INC.
Mr. Jason Nunley
(1) AECC, Inc./Mr. Fran Carter Original Signed By
(1) Haynes Whayley Associates, Inc./
Mr. Kent Penrod
(1) City of Coppell/Mr. Larry Davis Keith Atkins
(1) City of Coppell/Mr. Lee Stone KEA/je
(1) Potter Concrete/Mr. Brant Cox
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · -EL [214] 350 5600 * ~^X [214] 350 0019