Verizon-LR 981028REPORT OF DRILLEI-'?IER INSPECTION
Date of Service: 10/24/1998
Report No.: 9828982
Client No.: TIlE BECK
Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
10/28/1998
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC
jobsite as scheduled
recorded data.
Engineering technician arrived at
for drilled pier inspection. See
the above referenced
attached sheet for
Technician Time: 6:30
Technician: Brian Otis
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
'~rockette Davis Drake, Inc.
ae Beck Group
am to 4:00 pm
(1) Brockette Davis Drake, Inc.
(1) N.L. Schutte Foundation Drilling
(1) The Beck Group
~ E~g~ng, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TMP PaRe I of 1
O0 0
C~ ,'--
o~a
nd-
?
REPORT OF DRILLEL-?IER INSPECTION
8901 Carpenter Frwy., Suite 0100
Dallas, Texas 75247
Date of Service:
Client No.:
10/23/1998
THE BECK
Report No.: 9828917
Project No.: 43-2333-98
Report Date
10/28/1998
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC
jobsite as scheduled
recorded data.
Engineering technician arrived at
for drilled pier inspection. See
the above referenced
attached sheet for
Techncian Time: 6:00 am to 5:00 pm
Technician: Brian Otis
R_,eport Distribution:
The Beck Group --
Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(i) The Beck Group
(1) Brockette Davis Drake, Inc.
(1) N.L. Schutte Foundation Drilling
(I) The Beck Group
H~ E~ng, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TMP Pa.e I of 1
rtl
LLI
REPORT OF DRILLEk PIER INSPECTION
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
10/15/1998
THE BECK
Report No.: 9828128
Project No.: 43-2333-98
Report Date
10/28/1998
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC Engineering
jobsite as scheduled for drilled
recorded data.
technician arrived at the above referenced
pier inspection. See attached sheet for
Technician Time: 6:00
Technician: Brian Otis
Report Distribution:
~.~ The Beck Group
3romatzky Dupree & A~oc.
Brockette Davis Drake, Inc.
(I) The Beck Group
am to 6:00 pm
(1) Brockette Davis Drake, Inc.
(1) N.L. Schutte Foundation Drilling
(1) The Beck Group
I--BC ~ring, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99Tl~IP Paee 1 of 1
r',"
LU
REPORT OF DRILLEL'"PIER INSPECTION
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
10/19/1998
THE BECK
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9828425
Project No.: 43-2333-98
Report Date
10/28/1998
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC
jobsite as scheduled
recorded data.
Engineering technician arrived at 'the above referenced
for drilled pier inspection. See attached sheet for
Technician Time: 6:00
Technician: Brian Otis
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(1) Bmckette Davis Drake, Inc.
~t~ The Beck Group
am to 5:30 pm
(I) Brockette Davis Drake. Inc.
( 1 ) N.L. Schuttc Foundation Drilling
(I) The Beck Group
~ ~ring, Inc.
Eugene Harbour
r~ Vice President
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TMP Page i of I
mmm
REPORT OF DRILLEB . IER INSPECTION
Date of Service: 10/16/1998
Client No.: TI-IE BECK
Report No.: 9828240
Project No.: 43-2333-98
ENG[NEER[NG, [NC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
10/28/1998
Client:
The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC
jobsite as scheduled
data.
Engineering technician arrived at the above referenced
for drilled pier insection. See attached sheet for recorded
Technician Time: 6:00
Technician: Brian Otis
Report Distribution:
(1) The Beck Group
'""~,romatzky Dupree & Aggoc.
rockette Davis Drake, Inc.
(1) The Beck Group
am to 4:00 pm
(1) Brockette Davis Drake, Inc.
(I) N.L. Schutte Foundation Drilling
(1) The Beck Group
~ E~, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TMP Pa-e 1 of 1
ILl
,,~ .:
0 0
n