Verizon-LR 981027CONCRETE COMPRELoIVE STRENGTH TES'
Date of Service: 10/16/1998
Client No.: THE BECK
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9828241 Report Date
10/27/1998
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 42
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
SLUMP: 5.0"
AIR: N/A
METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: N/A
PLACEMENT DATE: 10/16/1998 RATCI~ TreE: 9: 14am
Tm SAMPLED: 10:15am aY: Brian Otis
WEATHER CONDITIONS:
TEMPERATURE (F)- AIR
TRUCK NO: 538
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Piers
Clear/Mild
74 F CONCRETE: 80 F
TICKET NO: 1162000
UNIT WEIGHT (pct')..' N/A
SAMPLE LOCATION: Piers- D-4
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.0
1 2 6.0
I 3 6.0
I 4 6.0
DATE
TESTED
10/23/1998
10/23/1998
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 85200 3010
7 86730 3070
Average 3040
11/13/1998
11/13/1998
28
28
1 5 6.0
12/11/1998
56
Technician time: See
Technician: Brian Otis
Report Distribution:
(1) The Beck Group
0,LGromatzky Dupree & Assoc.
rockette Davis Drake, h~c.
. he Beck Group
Report #9828240
Started:
(1) Brockette Davis Drake, lac.
(1) Dalcan, Inc.
(1) The Beck Group
Finished:
~ E~ing, Inc.
Eugene Harbour
Vice President
10
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac.
O1LL Page 1 of 1
'REPORT OF DRILLED PIER INSPECTION
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 10/14/1998
Client No.: THE BECK
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9828000
Project No.: 43-2333-98
Report Date
10/27/1998
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC
jobsite as scheduled
recorded data.
Engineering
for drilled
technician arrived at
pier inspection. See
the above referenced
attached sheet for
Technician Time: 6:00
Technician: Brian Otis
-SZeport Distribution:
fhe Beck Group
~ ~ ) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, inc.
(1) The Beck Group
am to 6:00 pm
(I) Brockette Davis Drake, Inc.
(I) N.L. Schutte Foundation Drilling
(1) The Beck Group
~ En~ng, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc.
99TM~P Pa~e 1 of 1