Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Coppell Industrial-LR010704
("~EOTECHNICAL AND ~ I~ I--I I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 87 c/o Champion Partners, Ltd. REPORT DATE: 07-04-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: W. Eberhardt ATTN: Mr. Kerry Burden PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. I I Pier Diameter I BellDiameter I Depth Before Final Depth of Date Pier No. (inches) I (inches) Bell (feet) Pier (feet) 06-14-01 H-13 28 48 15.6 16.2 F-24 28 48 15.5 16.1 F-23 28 48 15.3 15.8 F-22 28 48 15.5 16.0 F-21 28 48 16.0 16.6 F-20 28 48 15.4 16.0 F-19 28 48 15.8 16.1 F-18 28 48 16.5 16.8 F-17 28 48 15.4 15.5 F-16 28 48 15.5 15.6 F-15 28 48 15.2 15.5 F-14 28 48 15.0 15.4 F-13 28 48 15.3 15.7 G-18 28 48 16.0 16.5 G-19 28 48 16.8 17.1 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt BW/mm (1) Haynes Whayley Associates, inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 001<) GEOTECHNICAL AN:) J ~ R r"l I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 100 c/o Champion Partners, Ltd. REPORT DATE: 07-04-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 TECHNICIAN: W. Eberhardt ATTN: Mr. Kerry Burden PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. I Pier Diameter Bell Diameter Depth Before 13~ Final Depth of DateI Pier No. (inches) (inches) (feet) ! Pier (feet) 06-18-01 A.3-1 36 66 15.0 15.0 A-1.2 36 60 13.6 13.6 A- 1.8 36 54 14.0 14.1 N-1.8 36 54 14.8 14.8 N-1.2 36 60 14.4 14.4 M.9-1 36 66 15.2 15.2 L.4-0 36 72 14.5 14.6 E.8-1 30 54 16.0 16.1 F-1 30 54 15.8 16.0 H-1 30 54 15.8 15.9 H.4-1 30 54 16.0 16.2 06-19-01 K-13 30 54 15.5 16.0 K-19 30 54 15.5 15.5 G-12 30 (1) 54 (1) 15.7 15.7 G-13 30 (1) 54 (1) 16.0 16.1 G-10 36 54 16.0 16.0 G-11 36 54 15.9 16.0 G-14 36 54 15.5 15.7 G-16 36 54 15.3 15.5 G-17 36 54 15.5 15.5 G-20 36 54 16.6 16.7 G-21 36 54 15.6 15.8 G-22 36 54 15.0 15.0 Footnote: (1) Required 28/30, drilled 30/54. Mail Submitted by: Distribution: (1) Champion Partners. Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson. Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ James F. Phipps, P.E. Mr. David Meinhardt BW/mm (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 - -EL [214] 350 5600 · ~*X [214] 350 0019