Verizon-LR 981021IN-PLACE DENSITY STING
Date of Service:
Client No.:
Client:
10/08/1998
THE BECK
The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9827030
Project No.: 43-2333-98
Report Date
10/21/1998
Project:
GTE Shared Services
Coppell Road &'Corporate Drive
Coppell, Texas
Services: In-place density testing.
CONTRACTOR: BECK
PROJECT DATA
Laboratory Test Method: ASTM D-698
Field Test Method:
ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
I/D No.
Description
Moisture %
Maximum
Density pcf
Project Requirements
Moisture Density
1 See Below
2 See Below
i0.0
10.0
124.5
124.5
-2/+2% 95%
-1/+3% 95%
FIELD DENSITY TESTS
TEST
NO TEST LOCATION
M/D MOISTURE DRY DENSITY DENSITY
No. (%) (pc0 (% max)
East Wing, SE Corner
91 60'W & 50'N, Select, 1st Lift
92 60'W & 110'N, Select, 1st Lift
93 60'W & 170'N, Select, 1st Lift
94 60'W & 210'N, Select, 1st Lift
West Wing, NW Corner
95 55'E & 40'S, Select, 1st Lift
96 55'E & 90'S, Select, 1st Lift
97 55'E & 140'S, Select, 1st Lift
98 55'E & 190'S, Select, 1st Lift
99 55'E & 230'S, Select, 1st Lift
48" Storm, Line A
I 11.5 119.5 96
1 11.7 119.9 96
1 11.9 119.6 96
1 11.6 ! 19.8 96
1 11.8 120.0 96
1 11.5 120.4 97
1 11.7 119.5 96
1 11.4 120.4 97
1 11.7 119.9 96
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07TMP Page 1 of 2
Report No.: 9827030
TEST
NO
101
102
M/D MOISTURE DRY DENSITY
TEST LOCATION No. (%) (pet')
at Station 1+50, 1st Lift 2 12.6 120.3
at Station 2+50, 1st Lift 2 11.9 121.0
at Station 3+50, 1st Lift 2 121.0' 121.4
An asterisk (*) appears next to test results which do NOT meet the project specifications.
Material Description
#1 Dark Reddish Brown
#2 Dark Reddish Brown
Silty Sand with Some Gravel
Silty Sand with Some Gravel
DENSITY
(% max)
97
97
98
Technician: Tex King
Report Distribution:
(1) The Beck Group
"~nromatzky Dupree &
~rockette Davis Drake, Inc.
(l) The Beck Group
(I) Brockette Davis Drake, Inc.
(!) Cooper Excavation
(I) The Beck Group
Engineering, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07TMP Page 2 of 2