Loading...
Verizon-LR 981021IN-PLACE DENSITY STING Date of Service: Client No.: Client: 10/08/1998 THE BECK The Beck Group Atto: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9827030 Project No.: 43-2333-98 Report Date 10/21/1998 Project: GTE Shared Services Coppell Road &'Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: I/D No. Description Moisture % Maximum Density pcf Project Requirements Moisture Density 1 See Below 2 See Below i0.0 10.0 124.5 124.5 -2/+2% 95% -1/+3% 95% FIELD DENSITY TESTS TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) East Wing, SE Corner 91 60'W & 50'N, Select, 1st Lift 92 60'W & 110'N, Select, 1st Lift 93 60'W & 170'N, Select, 1st Lift 94 60'W & 210'N, Select, 1st Lift West Wing, NW Corner 95 55'E & 40'S, Select, 1st Lift 96 55'E & 90'S, Select, 1st Lift 97 55'E & 140'S, Select, 1st Lift 98 55'E & 190'S, Select, 1st Lift 99 55'E & 230'S, Select, 1st Lift 48" Storm, Line A I 11.5 119.5 96 1 11.7 119.9 96 1 11.9 119.6 96 1 11.6 ! 19.8 96 1 11.8 120.0 96 1 11.5 120.4 97 1 11.7 119.5 96 1 11.4 120.4 97 1 11.7 119.9 96 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2 Report No.: 9827030 TEST NO 101 102 M/D MOISTURE DRY DENSITY TEST LOCATION No. (%) (pet') at Station 1+50, 1st Lift 2 12.6 120.3 at Station 2+50, 1st Lift 2 11.9 121.0 at Station 3+50, 1st Lift 2 121.0' 121.4 An asterisk (*) appears next to test results which do NOT meet the project specifications. Material Description #1 Dark Reddish Brown #2 Dark Reddish Brown Silty Sand with Some Gravel Silty Sand with Some Gravel DENSITY (% max) 97 97 98 Technician: Tex King Report Distribution: (1) The Beck Group "~nromatzky Dupree & ~rockette Davis Drake, Inc. (l) The Beck Group (I) Brockette Davis Drake, Inc. (!) Cooper Excavation (I) The Beck Group Engineering, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2