Loading...
Verizon-LR 981020REPORT OF DRILLEff PIER INSPECTION 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 10/13/1998 THE BECK Report No.: 9827371 Project No.: 43-2333-98 Report Date 10/20/1998 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering jobsite as scheduled for drilled recorded data. technician arrived at pier inspection. See the above referenced attached sheet for Technician Time: 6:00 am to 5:00 pm Technician: Brian Otis Report Distribution: (1) The Beck Group ~ Gromalzky Dupree & Assoc. 3rockette Davis Drake, I~nc. t s ) The Beck Group (1) Brockette Davis Drake, Inc. (I) N.L. Schutte Foundation Drilling (I) The Beck Group ~ ~ng, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99TM2P Pai~e 1 of 1 LU