Verizon-LR 981020REPORT OF DRILLEff PIER INSPECTION
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
10/13/1998
THE BECK
Report No.: 9827371
Project No.: 43-2333-98
Report Date
10/20/1998
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Drilled pier inspection.
On this date, an HBC Engineering
jobsite as scheduled for drilled
recorded data.
technician arrived at
pier inspection. See
the above referenced
attached sheet for
Technician Time: 6:00 am to 5:00 pm
Technician: Brian Otis
Report Distribution:
(1) The Beck Group
~ Gromalzky Dupree & Assoc.
3rockette Davis Drake, I~nc.
t s ) The Beck Group
(1) Brockette Davis Drake, Inc.
(I) N.L. Schutte Foundation Drilling
(I) The Beck Group
~ ~ng, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99TM2P Pai~e 1 of 1
LU