Loading...
Verizon-LR 981006IN-PLACE DENSITY I STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 09/27/1998 THE BECK The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9825397 Project No.: 43-2333-98 Report Date 10/06/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: YD No. Maximum Description Moisture % Density per Project Re~luirements Moisture Density Light Brown & Light Gray Silty 12.5 116.5 Sand w/Dark Gray Clay Balls FIELD DENSITY TESTS -1/+3% 95% TEST NO M/D MOISTURE TEST LOCATION No. (%) DRY DENSITY DENSITY (pcf) (% max) 72 73 74 75 76 77 Subgrade South Parking SE Comer of West Wing, 100'S & 90'E 1 13.1 SE Comer of West Wing, 100'S & 190'E 1 13.5 SE Comer of West Wing, 200'S & 80'E 1 13.0 SE Comer of West Wing, 200'S & 180'E 1 13.7 SE Comer of West Wing, 300'S & 95'E 1 13.2 SE Comer of West Wing, 300'S & 195'E 1 13.6 Test results on this report meet project specification. Prior to Fill. 113.1 97 113.8 98 113.0 97 113.7 98 113.2 97 114.1 98 Technician: Tex King R.,..~eport Distribution: "he Beck Group -, Gromatzky Dupree & Assoc. O) Brockette Davis Drake, Inc. (1) The Beck Group (I) Brockette Davis Drake, Inc. (1) Cooper Excavation (1) The Beck Group Engineering, Inc. Eugoner~ Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 07TMP Page I of 1 IN-PLACE DENSITY T STING 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: Client No.: Client: 09/26/1998 THE BECK The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9825392 Project No.: 43-233~-98 Report Date 10/06/1998 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: 7D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Med to Lt Brown Silty Sand w/Some Sandstone 13.0 115.0 FIELD DENSITY TESTS -1/+3% 95% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) 49 5O 51 52 53 54 55 56 57 58 59 Northeast Parking NE Comer of East Wing, 90'N & 90'E, 1 st Lift NE Comer of East Wing, 180'N & 90'E, 1st Lift NE Comer of East Wing, 90'E & 80'S, 1 st Lift NE Comer of East Wing, 90'E & 180'S, 1 st Lift NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, 90'E & 280'S, 1 st Lift 90'E & 360'S, 1st Lift 195'E & 40'N, 1st Lift 195'E & 80'S,lst Lift 195'E & 180'S, 1st Lift 195'E & 280'S, 1st Lift 195'E & 360'S, 1st Lift 1 14.1 111.4 97 1 14.5 111.7 97 1 14.8 112.2 98 l 14.7 111.2 97 1 14.3 111.4 97 1 14.6 111.7 97 1 14.2 111.6 97 1 14.7 111.7 97 1 14.6 111.4 97 1 14.1 111.2 97 1 14.3 111.1 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page I of 2 Report No.: 9825392 TEST 61 62 63 64 65 66 67 68 69 70 71 TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pcO (% max) NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, NE Comer of East Wing, 290'E & 30'BI, 1 st Lift 290'E & 90'S, 1 st Lift 300'E & 190'S, 1st Lift 300'E & 290'S, 1 st Lift 300'E & 340'S, 1st Lift 400'E & 70'S, 1st Lift 400'E & 170'S, 1st Lift 400'E & 270'S, 1st Lift 400'E & 370'S, 1st Lift 490'E & 330'S. 1st Lift 490'E & 230'S, 1st Lift 490'S & 130'S, 1st Lift 1 14.6 111.4 97 1 14.1 111.8 97 1 14.0 111.6 97 1 13.7 111.2 97 1 14.2 111.4 97 1 14.4 111.8 97 1 14.6 111.4 97 1 14.1 111.9 97 1 14.3 112.2 98 1 14.1 111.7 97 1 14.6 111.9 97 1 14.5 112.1 98 Test results on this report meet project specification. Technician: Tex King Report Distribution: (I) The Beck Group (1) Gromatzky Dupree & Assoc. ~"qrockette Davis Drake, I~.nc. he Beck Group (1) Brockette Davis Drake, Inc. (I) Cooper Excavation (1) The Beck Group ~ Eng.. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2 IN-PLACE DENSITY., STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 09/25/1998 THE BECK The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9825350 Project No.: 43-233~-98 Report Date 10/06/1998 Project: GTE Shared Services Coppell Roa~l & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: '/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Dark Reddish Brown Clayey Sand w/Gravel 10.0 124.5 FIELD DENSITY TESTS opt. or above 93% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) 44 45 46 47 48 East Wing NE Comer 50'W & 20'S, 2nd Lift NE Comer 50'W & 60'S, 2nd Lift NE Comer 50'W & 90'S, 2nd Lift NE Comer 50'W & 160'S, 2nd Lift NE Comer 50'W & 200'S, 2nd Lift 1 12.1 119.6 96 1 11.9 119.1 96 1 12.1 1i9.0 96 1 12.0 119.1 96 1 12.2 118.8 95 Test results on this report meet project specification. Technician: Tex King Report Distribution: ~ ~lae Beck Group Jromatzky Dupree & Assoc. !,1) Brockette Davis Drake, Inc. (I) The Beck Group (I) Brockette Davis Drake, Inc. (1) Cooper Excavation (I) The Beck Group c' Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page ! of l IN-PLACE DENSITY I, STING Date of Service: Client No.: 09/24/1998 THE BECK Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9825258 Project No.: 43-2333-98 Report Date 10/06/1998 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: In-place density testing. CONTRACTOR: BECK PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: ~ Maximum Project Requirements I/D No. Description Moisture % Density pcf Moisture Density 1 Medium to Light Brown Silty 13.0 115.0 -1/+3% 95% Sand w/Some Sandstone FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pc0 (% max) Northeast Parking 21 NE Comer of East Wing, 100'N & 80'E I 14.1 110.5 96 22 NE Comer of East Wing, 200%1 & 80'E 1 13.8 110.4 96 23 NE Comer of East Wing, 100'E & 70'S 1 13.0 110.7 96 24 NE Comer of East Wing, 100'E & 170'S 1 14.4 110.5 96 25 NE Comer of East Wing, 100'E & 270'S 1 14.1 111.0 97 26 NE Comer of East Wing, 100'E & 370'S 1 14.3 111.0 97 27 NE Comer of East Wing, 200'E & 50'N 1 14.4 110.5 96 28 NE Comer of East Wing, 200'E & 70'S 1 14.2 111.6 97 29 NE Comer of East Wing, 200'E & 170'S 1 14.5 111.2 97 30 NE Comer of East Wing, 200'E & 270'S 1 14.6 110.7 96 31 NE Comer of East Wing, 200'E & 370'S 1 14.1 111.0 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page I of 2 Report No.: 9825258 TEST ~ z NE Comer 33 NE Comer 34 NE Comer 35 NE Comer 36 NE Comer 37 NE Comer 38 NE Comer 39 NE Comer 40 NE Comer 41 NE Comer 42 NE Comer 43 NE Comer Subgrade Prior TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pct') (% max) of East Wing, 300'E & 40%T of East Wing, 300'E & 70'S of East Wing, 300'E & 170'S, of East Wing, 300'E & 270'S, of East Wing, 300'E & 370'S of East Wing, 400'E & 80'S of East Wing, 400'E & 180'S, of East Wing, 400'E & 280'S of East Wing, 400'E & 350'S of East Wing, 500'E & 350'S of East Wing, 500'E & 250'S of East Wing, 500'E & 150'S to Fill. I 14.4 110.7 96 1 14.3 110.5 96 1 13.7 110.7 96 1 13.6 11 !.0 97 1 14.1 110.5 96 ! 14.4 110.4 96 1 14.3 111.2 97 1 14.5 111.0 97 1 14.1 111.1 97 1 14.6 110.9 96 1 14.9 111.0 97 1 14.6 111.0 97 Test results on this report meet project specification. Technician: Tex King Report Distribution: ~ ~e Beck Group ,romatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group (I) Brockette Davis Drake, Inc. (I) Cooper Excavation (1) The Beck Group HEn' g~nee ' , I . Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 07TMP Page 2 of 2